BILL HILL CONST is listed as a company organization in Philippine public procurement records on this site, with 20 linked DPWH project(s) totaling about ₱155,344,215.19. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
BILL HILL CONST
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 20
- Total value
- ₱155,344,215.19
- Published flags
- 0
- Region
- Surigao del Norte 2nd DEO · Region XIII
Online presence
Google Maps: Bill Hill Construction And SupplyGoogle Maps, 2026-10-22
00675 Vasquez St, Surigao, 8400 Surigao del Norte
Public Record Grade
A transparent, data-derived summary of reported public records for BILL HILL CONST — not an accusation or finding of wrongdoing.
Score: 80.80 / 100 · Projects in sample: 20 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 73.8/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 73.8
- lateCompletedProjects
- 7
- onTimeCompletedProjects
- 12
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 20
- pastTargetOngoingProjects
- 1
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 20
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 20
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 20
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 20
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
17 geotagged projects — Open full map · Download projects (CSV)
- ROAD CONCRETING AT BARANGAY DALIAO, TORIL DISTRICT, DAVAO CITY20LH0087 · ₱36,569,857.70 · mapped
- CONSTRUCTION OF FLOOD CONTROL / BRGY. OMBONG, ALEGRIA, SURIGAO DEL NORTE STA.0+232.80 - STA.0+426.4019NG0015 · ₱18,620,150.23 · mapped
- REHABILITATION/CONCRETING OF ROAD FROM BRGY. PILI TO BRGY. KARIHATAG/BRGY. KARIHATAG, MALIMONO, SURIGAO DEL NORTE20NG0096 · ₱12,100,122.55 · mapped
- CONSTRUCTION OF ROAD, BARANGAY MARGA TO SITIO LAMBUYO, TUBOD, SURIGAO DEL NORTE/TUBOD, SURIGAO DEL NORTE24NG0004 · ₱9,899,997.63 · mapped
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP), ACCESS ROAD BRGY. CAMP EDUARD TO BRGY. BUDLINGIN LEADING TO CAMP EDUARD CAVES AND FALLS, ALEGRIA, SURIGAO DEL NORTE/BRGY. BUDLI25NG0013 · ₱9,702,195.45 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE WITHIN SURIGAO RIVER, SURIGAO DEL NORTE/BRGY. LUNA, SURIGAO CITY, SURIGAO DEL NORTE, K0+020-K0+11117NF0063 · ₱9,456,276.43
- CONSTRUCTION OF NABAGO SEAWALL/BRGY. NABAGO, SURIGAO CITY, SURIGAO DEL NORTE, STA.0+000 - 0+079.5018NF0004 · ₱7,447,690.90 · mapped
- CONSTRUCTION OF PUNTA BILAR SEAWALL/BRGY. PUNTA BILAR, SURIGAO CITY, SURIGAO DEL NORTE, STA.0+000 - 0+084.418NF0005 · ₱7,261,733.81 · mapped
- BASIC INFRASTRUCTURE PROGRAM INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTION) CONSTRUCTION OF ROAD, BARANGAY CANSAYONG, MALIMONO, SURIGAO DEL NORTE/BARANGAY CANSAYONG, MALIMONO, SURIGAO DEL NORTE22NG0056 · ₱4,949,420.05 · mapped
- CONSTRUCTION OF ROAD, BARANGAY POBLACION, BACUAG, SURIGAO DEL NORTE/BARANGAY POBLACION, BACUAG, SURIGAO DEL NORTE22NG0058 · ₱4,946,215.74 · mapped
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, CIRCUMFERENTIAL ROAD LEADING LAKE MAINIT, MAINIT, SURIGAO DEL NORTE / MAINIT, SURIGAO DEL NORTE24NG0044 · ₱4,898,526.04 · mapped
- BASIC INFRASTRUCTURE PROGRAM - INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS) - CONSTRUCTION OF ROAD/BRGY. MAGUPANGE, PLACER, SURIGAO DEL NORTE22NG0044 · ₱4,813,529.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING AT O. HILAY NATIONAL HIGH SCHOOL, BARANGAY MANAMBULAN, TUGBOK DISTRICT, DAVAO CITY21LH0008 · ₱4,781,930.59 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, MINI COVERED COURT AT DACUDAO ELEMENTARY SCHOOL, BRGY. DACUDAO, CALINAN DISTRICT, DAVAO CITY16LH0039 · ₱3,912,210.73
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS, NRJ CAGNIOG-CAYUTAN-CANLANIPA PORT ROAD LEADING TO SURIGAO CITY PORT, SURIGAO CITY, SURIGAO DEL NORTE/SURIGAO CITY, SURIGAO DEL NORTE24NG0006 · ₱3,571,083.74 · mapped
- CONSTRUCTION OF RIVERBANK IN BRGY. MABINI/BRGY. MABINI, MAINIT, SURIGAO DEL NORTE K 0+000 - K 0+05016NF0158 · ₱2,969,977.59
- ASSET PRESERVATION-CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS-PRIMARY ROADS, DAANG MAHARLIKA (SURIGAO-AGUSAN SECT) - K1124+670 - K1124+710/BRGY. LUNA, SURIGAO CITY SURIGAO DEL NORTE23NG0038 · ₱2,939,995.40 · mapped
- CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, NRJ LIPATA - PUNTA BILAR - LO-OC - MABUA - IPIL ROAD / BRGY. PUNTA BILAR, SURIGAO CITY, SURIGAO DEL NORTE20NG0038 · ₱2,938,812.33 · mapped
- CONSTRUCTION OF SEAWALL FROM PUROK 1 TO PUROK 6 / BRGY. OSLAO, SAN FRANCISCO, SURIGAO DEL NORTE19NG0052 · ₱2,400,725.42 · mapped
- CONST./REPAIR/REHAB./IMPROV. OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS NRJ-LIPATA-PUNTA BILAR-LOOC-MABUA-IPIL ROAD,SURIGAO DEL NORTE/BRGY. PUNTA BILAR, SURIGAO CITY, SURIGAO DEL NORTE,LINE A: STA.0+002.40 - STA.0+011.50, LINE B: STA.0+000 - STA.018NF0064 · ₱1,163,763.86 · mapped
Equipment & capacity
PCAB license
No PCAB license is linked to this record. It may be a joint venture, a foreign firm, or a name we could not match. Search PCAB.
Government performance ratings (CPES)
No CPES evaluation lists this contractor's PCAB license in the GPPB releases we loaded (34th–41st).
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →