TRYST BUILDERS ENT is listed as a company organization in Philippine public procurement records on this site, with 31 linked DPWH project(s) totaling about ₱1,396,752,252.09. Recorded delivery grade C (from public DPWH project records — not a finding of wrongdoing).
TRYST BUILDERS ENT
CGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 31
- Total value
- ₱1,396,752,252.09
- Published flags
- 0
- Region
- Apayao 2nd DEO · Cordillera Administrative Region
Licensed officers (PCAB)
- Nestor Maranion Pablo · Authorized Managing Officer (PCAB license 31164) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for TRYST BUILDERS ENT — not an accusation or finding of wrongdoing.
Score: 72.70 / 100 · Projects in sample: 31 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 50/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 50
- lateCompletedProjects
- 22
- onTimeCompletedProjects
- 6
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 31
- pastTargetOngoingProjects
- 3
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 31
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0.1
- componentScore
- 100
- projectsWithAbcAndCost
- 31
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 31
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 31
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
21 geotagged projects — Open full map · Download projects (CSV)
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS BAGUIO - ITOGON ROADKO260+800 - KO260+954ITOGON,21P00061 · ₱193,000,000.00 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/NEW ROADS BAGUIO - LA TRINIDAD - ITOGON - SABLAN - TUBA AND TUBLAY, TALOY NORTE JCT.-SAN PASCUAL BRGY. HALL (SECTION 7)20P00005 · ₱142,003,838.82 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - PAVING OF UNPAVED ROADS - TERTIARY ROADS CLAVERIA - CALANASAN - KABUGAO ROADKO703+100 - KO704+260KO704+910 - KO706+56420P00013 · ₱107,694,000.00 · mapped
- ASSET PRESERVATION OF NATIONAL ROAD - REHABILITATION/ RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE, BAGUIO - BONTOC ROAD, K0281+700-K0281+750, K0282+850-K0282+900, K0292+200-K0292+275, K0281+600-K0281+622, K0306+000-K0306+0217P00029 · ₱107,227,478.10 · mapped
- ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/ NEW ROADS - PIDDIG-CARASI-CALANASAN ROAD (CALANASAN SIDE), PACKAGE 2, APAYAO24PC0002 · ₱102,422,210.59 · mapped
- CONSTRUCTION OF MISSING LINKS / NEW ROADS: CONSTRUCTION OF CONCRETE ROAD - SPECIFIC LOCATIONS ALONG BAGUIO-LA TRINIDAD-ITOGON- SABLAN-TUBA & TUBLAY (BLISTT), TALOY NORTE JCT.- SAN PASCUAL BARANGAY HALL JCT. (SECTION 7 OF BLISTT OUTER RING CIRCUMFERENTIAL19PE0029 · ₱93,830,147.85 · mapped
- NETWORK DEVELOPMENT-CONSTRUCTION OF MISSING LINKS/NEW ROADS PIDDIG-CARASI-CALANASAN ROAD (CALANASAN SIDE), MALUNGOG BRIDGE, APAYAO-CONSTRUCTION OF STEEL BRIDGE22PC0023 · ₱57,894,330.36 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/ NEW ROADS - PIDDIG-CARASI-CALANASAN ROAD (CALANASAN SIDE), PACKAGE 1, APAYAO24PC0023 · ₱56,164,935.24 · mapped
- REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS W/ SLIP, SLOPE COLLAPSE, AND LANDSLIDES ALONG CLAVERIA-CALANASAN-KABUGAO ROAD (K0672+567 - K0672+632), (K0672+1100-K0672+1260), (K0673+260-K0673+360), CALANASAN APAYAO16PC0012 · ₱55,962,853.47 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM-REHABILTATION/RECONSTRUCTION OF ROAD WITH SLIPS, SLOPES COLLAPSE AND LANDSLIDES-TERTIARY ROADS CLAVERIA-CALANASAN KABUGAO ROAD K0628+406-K0628+55621PC0021 · ₱49,511,098.46 · mapped
- REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, KENNON ROAD, K0247+644 - K0248+147 (LEFT SIDE), K0247+644 - K0247+724 (RIGHT SIDE), K0246+852 -K0247+000 (RIGHT SIDE)16P00021 · ₱48,749,942.22 · mapped
- NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/NEW ROADS PIDDIG-CARASI-CALANASAN ROAD (CALANASAN SIDE), PACKAGE 1, APAYAO22PC0016 · ₱47,021,841.31 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/NEW ROADS - PIDDIG - CARASI - CALANASAN ROAD (CALANASAN SIDE), PACKAGE 2, APAYAO23PC0002 · ₱46,441,681.15 · mapped
- ROAD UPGRADING (UNPAVED TO PAVED) APAYAO - ILOCOS NORTE ROAD, K0729+18016PC0007 · ₱45,839,587.46
- ROAD UPGRADING APAYAO - ILOCOS NORTE ROAD MALITAO SEC K0727+37316PC0006 · ₱45,258,125.06
- NETWORK DEVELOPMENT PROGRAM-PAVING OF UNPAVED ROADS-CLAVERIA-CALANASAN KABUGAO ROAD K0706+564-K0707+28821PC0012 · ₱25,778,898.27 · mapped
- CONSTRUCTION OF MISSING LINKS/NEW ROADS: APAYAO-ILOCOS NORTE ROAD, CHAINAGE 0-CHAINAGE 540, CALANASAN, APAYAO19PC0089 · ₱23,463,291.66 · mapped
- NETWORK DEVELOPMENT:PAVING OF UNPAVED ROADS ALONG APAYAO-ILOCOS NORTE ROAD, STA.742+620-STA.743+130, CALANASAN, APAYAO19PC0090 · ₱22,157,003.01 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT-CONSTRUCTION OF MISSING LINKS/NEW ROADS-PIDDIG CARASI-CALANASAN ROAD (CALANASAN SIDE), PACKAGE 2, APAYAO-CONSTRUCTION OF CONCRETE ROAD22PC0035 · ₱19,595,907.37 · mapped
- CY-2017 K-10 SCHOOL BUILDING PROGRAM-CONSTRUCTION OF 4 STOREY 8 CLASSROOMS, MAGSAYSAY NATIONAL HIGH SCHOOL17PD0063 · ₱18,068,772.82
- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASIN AND PRINCIPAL RIVERS, CONSTRUCTION OF ABBIL FLOOD CONTROL, APAYAO, NAMALTUGAN, CALANASAN, APAYAO19PC0032 · ₱16,203,389.02 · mapped
- PACKAGE I: 1.) CONSTRUCTION OF APAYAO NATIONAL INDUSTRIAL AGRICULTURAL HS 1 CL WORKSHOP BUILDING ( 7 X 18), 2.) CONSTRUCTION OF APAYAO NATIONAL INDUSTRIAL AGRICULTURAL HS 1 CL WORKSHOP BUILDING ( 7 X 22), 3.)CONSTRUCTION OF APAYAO NATIONAL INDUSTRIAL AGRI17PC0097 · ₱14,114,429.53
- OO 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/ NEW ROADS - PIDDIG-CARASI-CALANASAN ROAD (CALANASAN SIDE), PACKAGE 4, APAYAO24PC0053 · ₱10,319,269.07 · mapped
- IMPROVEMENT OF CADACLAN - MARAG ROAD16PC0005 · ₱9,541,669.07
- PACKAGE I. CONSTRUCTION OF KABUGAWAN PS 1 STOREY 3 CL, 2.) CONSTRUCTION OF MACALINO ES 1 STOREY 2 CL 3.) CONSTRUCTION OF MILAGROSA ES 1 SOREY 2 CL17PC0105 · ₱9,370,279.57
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE -CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG AGNO RIVER BASIN EDDET - ADAOAY SECTION, STA. 018+820 - STA. 019+011, KABAYAN, BENGUET18PE0039 · ₱9,155,818.11 · mapped
- PACKAGE I. CONS/IMPRVMNT (SAN ISIDRO LIVELIHOOD AND TRAINING MULTIPURPOSE BUILDING) (MUNICIPALITIES16PC0002 · ₱7,035,593.10
- PACKAGE II. CONST/IMPRVMNT ALEM DISASTER EVACUATION CENTER 2. SAN MARIANO MPB16PC0003 · ₱4,586,222.40
- CONSTRUCTION OF STANDARD VOCHTECH MULTI-PURPSE WORKSHOP BUILDING, EVA, CALANASAN, APAYAO17PC0050 · ₱3,077,687.42 · mapped
- CONSTRUCTION OF BRGY BUTAO MPB, BRGY BUTAO, CALANASAN, APAYAO17PC0011 · ₱2,887,707.82
- CONSTRUCTION OF MPB, BRGY. POBLACION, CALANASAN, APAYAO17PC0015 · ₱2,374,243.76
Equipment & capacity
PCAB license
- License no.
- 31164
- Category
- A · Medium B
- Minimum net worth for this category
- ₱30,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱300M
- License valid until
- Dec 19, 2027
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 31164); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
4 evaluations listed across 3 GPPB CPES releases; average final rating 73.0% over 2 rated projects; 4 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Aug 19, 2024 | DPWH | ₱102,422,211.00 | On-going | 94.2% | — | 38th, p. 245 |
| May 21, 2024 | DPWH | ₱46,441,681.00 | Completed | 89.6% | 88.4% | 38th, p. 246 |
| Nov 25, 2023 | DPWH | ₱46,441,681.00 | On-going | 87.6% | — | 37th, p. 111 |
| Jun 5, 2019 | DPWH | ₱9,155,818.00 | Completed | 57.5% | 57.5% | 40th, p. 309 |
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →