STEVEN CONST & SUPPLY is listed as a company organization in Philippine public procurement records on this site, with 25 linked DPWH project(s) totaling about ₱1,329,106,924.97. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
STEVEN CONST & SUPPLY
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 25
- Total value
- ₱1,329,106,924.97
- Published flags
- 0
- Region
- SORSOGON · Region V
Licensed officers (PCAB)
- Jocelyn D. Destura · Authorized Managing Officer (PCAB license 21987) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for STEVEN CONST & SUPPLY — not an accusation or finding of wrongdoing.
Score: 89.90 / 100 · Projects in sample: 25 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 96/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 96
- lateCompletedProjects
- 2
- onTimeCompletedProjects
- 23
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 25
- pastTargetOngoingProjects
- 0
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 25
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 25
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 25
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 25
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
25 geotagged projects — Open full map · Download projects (CSV)
- CONST. OF STA. MAGDALENA PROTECTION WALL, SAN ANTONIO RIVER CONTROL, BULUSAN AND PAWA RIVER CONTROL24FL0001 · ₱117,599,168.18 · mapped
- Construction of Bank Protection Structure along Bicol River, Sto. Domingo-San Antonio Ogbon Section, Nabua, Camarines Sur23FN0017 · ₱96,472,842.95 · mapped
- Rehabilitation/Improvement of Flood Mitigation at Bulawan River, Irosin, Sorsogon22FL0032 · ₱95,380,291.78 · mapped
- Construction of Pamurayan River Control, Sorsogon City, Sorsogon22FK0019 · ₱77,026,450.47 · mapped
- Rehabilitation of Bicol River Flood Control (San Mateo - Sitio Gogon Section), Camaligan, Camarines Sur23FF0036 · ₱66,753,754.22 · mapped
- Construction/Rehabilitation/Improvement of Flood Mitigation Structure, Bicol River Flood Control, Brgy. Balongay, (Balongay Section - Left Side), Calabanga, Camarines Sur22FF0044 · ₱57,879,793.55 · mapped
- Rehabilitation of Bicol River Flood Control (Mabolo Section), Barangay Mabolo, Naga City, Camarines Sur23FF0037 · ₱57,204,819.77 · mapped
- Construction of Flood Mitigation Structure of Brgy. Siuton Flood Control, Magallanes, Sorsogon23FK0039 · ₱49,499,988.79 · mapped
- Construction of Flood Mitigation Structure of Brgy. Incarizan Flood Control, Magallanes, Sorsogon23FK0039 · ₱49,499,987.99 · mapped
- Construction of River Bank Protection Works and Drainage System, Barangay Kidaco to Barangay Lacag River, Daraga, Albay24FB0011 · ₱49,498,701.76 · mapped
- Construction of San Roque-Liñaga Creek Flood Control, Canaman, Camarines Sur23FF0056 · ₱48,463,992.00 · mapped
- Construction of Balos River Flood Mitigation Structure (Downstream), Barangay San Francisco, Iriga City, Camarines Sur22FN0090 · ₱48,109,727.57 · mapped
- Construction of Flood Mitigation Structure, Zone 2 of Brgy. Labnig, Malinao, Albay23FA0039 · ₱48,020,000.00 · mapped
- Construction of Flood Control Structure at Sitio Lawigan, Brgy. San Rafael, Sta. Magdalena, Sorsogon22FL0006 · ₱47,415,662.39 · mapped
- CONST./IMPV'T. OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, DONSOL-PILAR-CASTILLA, SORSOGON CITY (DONPICASO) TOURISM HIGHWAY (SORSOGON SECTION)18FK0031 · ₱47,382,995.81 · mapped
- Construction of Flood Mitigation Project (Upstream) in Barangay Bulawan, Irosin, Sorsogon22FL0019 · ₱47,363,531.26 · mapped
- Construction of Flood Mitigation Structure, Labnig National High School, Brgy. Labnig, Malinao, Albay23FA0039 · ₱47,040,000.00 · mapped
- CONST. OF ONE (1) STY SCHOOL BLDGS. CLUSTER III UNDER DEPED'S CY 2017 BEFF BATCH 7 AT IROSIN AND STA17FL0089 · ₱46,012,584.11 · mapped
- CLUSTER II-CONST. OF VARIOUS SCHOOL BLDG. PROJECTS UNDER FY-2016 BASIC EDUCATIONAL FACILITIES FUND (BEFF) BATCH 11, PILAR & CASTILLA16FK0041 · ₱40,187,087.57 · mapped
- FLOOD MANAGEMENT PROGRAM-CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONST. OF ANAHAW RIVER CONTROL, SORSOGON CITY18FK0035 · ₱39,800,160.36 · mapped
- Construction of Flood Protection Measures along Cawayan River, Brgy. Gimaloto and Brgy. Barayong, Sorsogon City23FK0011 · ₱38,006,678.27 · mapped
- Construction of River Control (Downstream) Brgy. Bulabog, West District, Sorsogon City22FK0084 · ₱37,118,332.97 · mapped
- CLUSTER I-CONST. OF VARIOUS SCHOOL BLDG. PROJECTS UNDER FY-2016 BASIC EDUCATIONAL FACILITIES FUND (BEFF) BATCH 11, PILAR, SORSOGON16FK0040 · ₱33,417,385.48 · mapped
- Construction of Flood Mitigation Structure along Mapanag River, Sagñay, Camarines Sur22FG0020 · ₱29,400,000.00 · mapped
- CONST'N./IMPV'T. OF ACCESS RD. LEADING TO MANLELUAG HOT SPRING,BRGY. MALABOBO,MANGATAREM,PANGASINAN19AH0112 · ₱14,552,987.72 · mapped
Equipment & capacity
PCAB license
- License no.
- 21987
- Category
- A · Medium B
- Minimum net worth for this category
- ₱30,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱300M
- License valid until
- Oct 10, 2029
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 21987); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
41 evaluations listed across 7 GPPB CPES releases; average final rating 92.6% over 20 rated projects; 41 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Jun 27, 2025 | DPWH (JV) | ₱88,751,072.00 | Completed | 94.6% | 94.2% | 40th, p. 293 |
| Jun 7, 2025 | DPWH (JV) | ₱110,999,952.00 | Completed | 96.7% | 88.4% | 40th, p. 293 |
| May 2, 2025 | DPWH | ₱55,959,302.00 | Completed | 91.7% | 90.6% | 40th, p. 293 |
| Nov 27, 2024 | DPWH (JV) | ₱96,495,013.00 | Completed | 89.7% | 92.3% | 39th (rev), p. 203 |
| Oct 19, 2024 | DPWH | ₱55,959,302.00 | On-going | 89.9% | — | 39th (rev), p. 203 |
| Oct 18, 2024 | DPWH (JV) | ₱85,751,072.00 | On-going | 93.9% | — | 39th (rev), p. 203 |
| Oct 18, 2024 | DPWH (JV) | ₱48,881,240.00 | On-going | 95.2% | — | 39th (rev), p. 203 |
| Jul 30, 2024 | DPWH (JV) | ₱60,288,375.00 | On-going | 95.1% | — | 38th, p. 229 |
| Jul 24, 2024 | DPWH (JV) | ₱111,000,000.00 | On-going | 82.8% | — | 38th, p. 229 |
| Jul 24, 2024 | DPWH | ₱57,856,982.00 | On-going | 92.8% | — | 38th, p. 229 |
| May 21, 2024 | DPWH (JV) | ₱96,495,013.00 | On-going | 94.1% | — | 38th, p. 229 |
| May 20, 2024 | DPWH (JV) | ₱96,141,654.00 | Completed | 98.6% | 97.6% | 38th, p. 229 |
Showing the 12 most recent of 41.
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →