E R VENZON CONST is listed as a company organization in Philippine public procurement records on this site, with 96 linked DPWH project(s) totaling about ₱2,559,413,948.43. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
E R VENZON CONST
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 96
- Total value
- ₱2,559,413,948.43
- Published flags
- 0
- Region
- Bataan 2nd DEO · Region III
Online presence
Google Maps: E.R. Venzon Construction Satellite OfficeGoogle Maps, 2026-10-22
Jp Rizal, Velasco St, Balanga City, 2100 Bataan
Licensed officers (PCAB)
- Noli A. Venzon · Authorized Managing Officer (PCAB license 19013) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for E R VENZON CONST — not an accusation or finding of wrongdoing.
Score: 80.10 / 100 · Projects in sample: 96 · As of Oct 22, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 64.5/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 64.5
- lateCompletedProjects
- 2
- onTimeCompletedProjects
- 70
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 91
- pastTargetOngoingProjects
- 19
- undatedCompletedProjectsExcluded
- 4
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 96
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 96
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 96
- componentScore
- —
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 96
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 46 of 87 geotagged projects (largest by contract value) — Open full map
- OFF-CARRIAGEWAY IMPROVEMENT - SECONDARY ROADS - ROMAN EXPRESSWAY - KO122+904-KO124+142, BATAAN 2ND DISTRICT22CB0084 · ₱77,200,000.00 · mapped
- NETWORK DEVELOPMENT - ROAD WIDENING - SECONDARY ROADS - ANGELES-PORAC-FLORIDABLANCA-DINALUPIHAN RD K014+205-K0106+000, FLORIDABLANCA, PAMPANGA21CH0088 · ₱64,234,599.06 · mapped
- CONSTRUCTION OF FOUR (4) STOREY TWENTY (20) CLASSROOM AT BATAAN NATIONAL HIGH SCHOOL, CITY OF BALANGA, BATAAN20CB0035 · ₱61,580,102.69 · mapped
- ASSET PRESERVATION PROGRAM - CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY ROADS - JOSE ABAD SANTOS AVE (JASA) - DINALUPIHAN, BATAAN24C00043 · ₱59,526,708.97 · mapped
- CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - TERTIARY ROADS - GOV JJ LINAO RD - KO126+000-KO128+790, BATAAN 2ND DISTRICT22CB0026 · ₱57,900,000.00 · mapped
- ROAD WIDENING - SECONDARY ROADS - ROMAN EXPRESSWAY - KO134+620-KO135+559, BATAAN 2ND DISTRICT24CB0034 · ₱56,487,623.16 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM- CONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM - TIKAS)-CONSTRUCTION OF PROVINCIAL HEADQUARTERS BUILDING-1 BATAA21CA0061 · ₱56,168,789.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUTCURE PROGRAM - INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS) CONSTRUCTION OF BAGAC-MARIVELES BY-PASS ROAD, BAGAC AND MARIVELES, BATAAN23C00322 · ₱49,500,000.00 · mapped
- Construction of Flood Control along Tuag River, Morong, Bataan23C00288 · ₱49,500,000.00 · mapped
- LOCAL INFRASTRUCTURE PROGRAM BUILDINGS AND OTHER STRUCTURES MULTIPURPOSE/FACILITIES CONSTRUCTION/ REHABILITATION/ RENOVATION OF MULTI-PURPOSE BUILDING (BATAAN PEOPLE'S CENTER) (PHASE 2), BALANGA, BATAAN19CB0066 · ₱49,500,000.00 · mapped
- CONSTRUCTION/REHABILITATION OF MULTI-PURPOSE FACILITIES WITH SITE DEVELOPMENT OF TOURISM CENTER, TENEJERO, BALANGA, BATAAN19CB0077 · ₱49,500,000.00 · mapped
- CONSTRUCTION OF SITIO ANAHAO ROAD, BRGY. REFORMISTA, LIMAY, BATAAN23CB0053 · ₱49,500,000.00 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CUPANG SECTION, BRGY. CUPANG, BALANGA, BATAAN20CB0051 · ₱49,499,886.04 · mapped
- Construction of Box Culvert at Tagbilaran East Road (including Box Culvert and Drainage), K0184+200, Brgy. Guinsularan, Duero, Bohol23HB0087 · ₱49,434,062.86 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BATAAN PENINSULA STATE UNIVERSITY, BARANGAY SAN JOSE, BALANGA CITY, BATAAN23CB0035 · ₱49,000,000.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE FACILITY (ORION SPORTS COMPLEX), BARANGAY WAWA, ORION, BATAAN23CB0056 · ₱49,000,000.00 · mapped
- ROAD WIDENING - SECONDARY ROADS - GOV JJ LINAO ROAD - KO132+800-KO133+360, KO136+820-KO137+013, BATAAN 2ND DISTRICT22CB0033 · ₱49,000,000.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING IN BATAAN HIGH SCHOOL FOR THE ARTS, BAGAC, BATAAN22CB0088 · ₱49,000,000.00 · mapped
- REHABILITATION OF BATAAN MULTI-PURPOSE BUILDING, SAN JOSE, BALANGA, BATAAN20CB0062 · ₱48,350,229.27 · mapped
- CONVERGENCE & SPECIAL SUPPORT PROGRAM-CONST./IMPROV. OF ACCESS ROADS LEADING TO TRADES,INDUSTRIES & ECONOMIC ZONES (ROLL-IT)-BRGY.SAN SIMON TO BRGY.TUCOP ROAD AGRO-INDUSTRIAL AREA, DINALUPIHAN, BATAAN23C00201 · ₱48,250,000.00 · mapped
- CONSTRUCTION (COMPLETION) OF SUNRISE BUILDING, BARANGAY DOÑA , ORANI, BATAAN18CA0097 · ₱48,249,999.53 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MASUAJE RIVER, PILAR, BATAAN25CB0035 · ₱47,995,361.17 · mapped
- CONSTRUCTION OF REVETMENT ALONG SAN CRISTOBAL RIVER, BARANGAY BANLIC, CALAMBA CITY, LAGUNA23DI0008 · ₱47,873,000.00 · mapped
- ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVE ROADS - PRIMARY ROADS - JOSE ABAD SANTOS AVE (JASA) - DINALUPIHAN, BATAAN25CO0001 · ₱47,130,611.64 · mapped
- ASSET PRESERVATION OF NATIONAL ROADS REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT-4 (HDM-4) ROMAN EXPRESSWAY, LIMAY-MARIVELES, BATAAN17CB0025 · ₱46,087,967.37 · mapped
- IMPROVEMENT OF MALUANG ROAD, BRGY. CUPANG PROPER, BALANGA CITY, BATAAN23CB0032 · ₱44,100,000.00 · mapped
- Construction of Revetment along San Juan River, Barangay Sampiruhan, Calamba City, Laguna23DI0037 · ₱42,953,626.00 · mapped
- ASSET PRESERVATON OF NATIONAL ROADS-CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS-SECONDARY ROADS-CONSTRUCTION OF DRAINAGE STRUCTURE ALONG ROAD-GOV JJ LINAO RD-KO132+094-KO132+420, KO133+190-KO133+360, KO133+390-KO136+275, PILAR,17CB0098 · ₱40,926,670.23 · mapped
- CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS - ROMAN EXPRESSWAY - KO124+203-KO125+392, BATAAN 2ND DISTRICT22CB0025 · ₱38,470,634.96 · mapped
- ASSET PRESERVATION PROGRAM - CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - TERTIARY ROADS - EPZA BY-PASS (BARASO COUNTRY RD) - MARIVELES, BATAAN25CO0053 · ₱37,827,888.88 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SLOPE PROTECTION, PUKOT RIVER CONTROL (BALON ANITO, SAN ISIDRO AND IPAG SECTION) MARIVELES, BATAAN18CB0006 · ₱37,208,300.32 · mapped
- CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROAD - ROMAN EXPRESSWAY - KO128+092-KO129+000, BATAAN 2ND DISTRICT21CB0010 · ₱34,300,000.00 · mapped
- ROAD WIDENING - SECONDARY ROADS - GOV JJ LINAO RD - KO138+700-KO139+800, BATAAN 2ND DISTRICT24CB0053 · ₱33,425,298.89 · mapped
- ASSET PRESERVATION PROGRAM - CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - TERTIARY ROADS - TABACAN POBLACION RD - DINALUPIHAN, BATAAN25CO0052 · ₱33,014,579.09
- ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS - JCT LAYAC BALANGA MARIVELES PORT RD - MARIVELES, BATAAN24C00041 · ₱33,008,182.38 · mapped
- CONSTRUCTION OF TWO(2) STOREY TEN(10) CLASSROOM AT BILOLO ES, ORION, BATAAN20CB0078 · ₱32,530,183.65 · mapped
- ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - GOV JJ LINAO RD - BAGAC, BATAAN23C00221 · ₱31,845,000.00 · mapped
- CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS - GOV JJ LINAO RD - KO137+600-KO138+700, BATAAN 2ND DISTRICT22CB0024 · ₱30,380,000.00 · mapped
- CONSTRUCTION OF BALANGA CITY BYPASS ROAD LEADING TO ROMAN HIGHWAY, BALANGA, BATAAN22CB0090 · ₱29,700,000.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (LIFELONG LEARNING CENTER, TESDA BUILDING PHASE 2), TENEJERO, BALANGA CITY, BATAAN23CB0005 · ₱29,700,000.00 · mapped
- CONCRETING OF BARANGAY ALION FMR, BARANGAY ALION, MARIVELES, BATAAN23C00303 · ₱29,306,705.28
- CONVEGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, PHASE 3, BRGY. ALAS-ASIN, MARIVELES, BATAAN24C00167 · ₱29,100,888.88 · mapped
- CONSTRUCTION OF REVETMENT ALONG SAN JUAN RIVER, BARANGAY BANADERO, CALAMBA CITY, LAGUNA23DI0019 · ₱28,635,422.00 · mapped
- ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - GOV JJ LINAO RD - BAGAC, BATAAN25CO0051 · ₱28,298,618.01 · mapped
- FLOOD CONTROL AND DRAINAGE-FLOOD CONTROL STRUCTURES/FACILITIES, CONSTRUCTION OF CONCRETE REVETMENT WITH CONCRETE PILE, BALANGA CITY, BATAAN17CB0101 · ₱28,229,642.02
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, TALISAY RIVER, SITIO NIYUGAN, (BRGY. CUPANG PROPER), BALANGA CITY, BATAAN18CB0010 · ₱24,500,000.00 · mapped
- ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS - JOSE ABAD SANTOS AVE (JASA) - DINALUPIHAN, BATAAN25CO0050 · ₱23,582,240.97 · mapped
- CONSTRUCTION OF FOUR(4) STOREY TWELVE(12) CLASSROOM AT E.C. BERNABE NHS, BAGAC, BATAAN16CB0122 · ₱22,797,609.13
- REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS-TERTIARY ROAD- JCT LAYAC-BALANGA-MARIVELES PORT ROAD - KO128+842-KO129+298, BATAAN 2ND DISTRICT20CB0002 · ₱20,920,060.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING AT SITIO PAG-ASA, WAWA, ORION, BATAAN20CB0024 · ₱19,800,000.00 · mapped
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
