NOGNOG ENT is listed as a company organization in Philippine public procurement records on this site, with 45 linked DPWH project(s) totaling about ₱421,860,869.86. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
NOGNOG ENT
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 45
- Total value
- ₱421,860,869.86
- Published flags
- 0
- Region
- Cebu 5th DEO · Region VII
Online presence
Licensed officers (PCAB)
- Herbert Bercede Conde · Authorized Managing Officer (PCAB license 41932) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for NOGNOG ENT — not an accusation or finding of wrongdoing.
Score: 85.90 / 100 · Projects in sample: 45 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 80.2/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 80.2
- lateCompletedProjects
- 3
- onTimeCompletedProjects
- 37
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 44
- pastTargetOngoingProjects
- 4
- undatedCompletedProjectsExcluded
- 1
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 45
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 45
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 45
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 45
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
45 geotagged projects — Open full map · Download projects (CSV)
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (CEBU TECHNOLOGICAL UNIVERSITY) BORBON, CEBU23HI0102 · ₱84,130,000.00 · mapped
- CONSTRUCTION/COMPLETION OF ACADEMIC BUILDINGS, CEBU TECHNOLOGICAL UNIVERSITY (CTU) - BORBON CAMPUS - CEBU TECHNOLOGICAL UNIVERSITY24H00164 · ₱49,675,133.14 · mapped
- CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF MATINAO-BUNDO-BILI-CAJEL ROAD, BORBON, CEBU25HI0099 · ₱38,414,230.07 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (EVACUATION CENTER), BRGY. POBLACION, BORBON, CEBU24HI0046 · ₱29,678,592.58 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (BORBON SPORTS COMPLEX) BORBON, CEBU23HI0093 · ₱19,793,196.28 · mapped
- CONCRETING OF SITIO LIANG, BRGY. BINGAY FMR, BRGY. BINGAY, BORBON, CEBU24HI0090 · ₱14,916,114.74 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING IN BARANGAY POBLACION, BORBON, CEBU22HI0065 · ₱14,835,891.73 · mapped
- CONCRETING OF BRGY. MANAGASE FMR, BRGY. MANAGASE, BORBON, CEBU25HI0095 · ₱14,623,125.22 · mapped
- CONCRETING OF BRGY. BONGDO FMR, BRGY. BONGDO, BORBON, CEBU21HI0136 · ₱12,362,800.00 · mapped
- REHABILITATION OF CONCRETE ROAD - REHABILITATION OF ROAD IN BARANGAY MANAGASE, BORBON, CEBU22HI0026 · ₱9,885,000.00 · mapped
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY POBLACION, BORBON, CEBU24HI0040 · ₱9,879,756.96 · mapped
- CONSTRUCTION OF SOLAR WATER SUPPLY SYSTEM, BORBON, CEBU23HI0069 · ₱9,797,426.94 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING BARANGAY CAMPUSONG, BARANGAY SAN JOSE AND BARANGAY TABUNAN, BORBON, CEBU22HI0020 · ₱6,918,618.48 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING IN BARANGAY CAMPUSONG, BARANGAY BONGOYAN, BARANGAY SAN JOSE AND BARANGAY TABUNAN, BORBON, CEBU22HI0021 · ₱6,917,912.54 · mapped
- CONSTRUCTION OF CONCRETE ROAD - CONSTRUCTION OF ROAD IN BARANGAY DON GREGORIO ANTIGUA, BORBON, CEBU22HI0023 · ₱6,916,850.40 · mapped
- CONSTRUCTION OF MULTI-PURPOSE FACILITY (COVERED COURT), BRGY. POBLACION, BORBON, CEBU23HI0096 · ₱4,947,039.71 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND / OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR / STRATEGIC PUBLIC BUILDINGS / FACILILTIES - CONSTRUCTION OF ROAD, BARANGAY QUIOT, CEBU CITY24HH0015 · ₱4,930,000.00 · mapped
- REHABILITATION OF MULTI-PURPOSE BUILDING, BRGY. DON GREGORIO, BORBON, CEBU21HI0122 · ₱4,801,500.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. POBLACION, BORBON, CEBU20HI0073 · ₱4,801,500.00 · mapped
- CONSTRUCTION AND/OR REPAIR/REHABILITATION OF MULTI-PURPOSE BUILDING, BRGY. MANAGASE, BORBON, CEBU20HI0079 · ₱4,801,500.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. TABUNAN, BORBON, CEBU20HI0063 · ₱4,753,000.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. BONGDO PROPER, BORBON, CEBU20HI0058 · ₱4,753,000.00 · mapped
- CONSTRUCTION OF 1STY2CL, BORBON NHS, BORBON, CEBU23HI0125 · ₱4,744,762.06 · mapped
- CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS- RAIN WATER COLLECTORS IN PUBLIC FACILITIES AT (1) OBO ES, DALAGUETE, (2) CANCABALONG ES, DALAGUETE, (3) CANLAWILAO ES, DALAGUETE, (4) BALA NHS, MOALBOAL, (5) SUA ES,20HG0176 · ₱4,046,574.15 · mapped
- CONSTRUCTION/REHABILITATION OF MULTI-PURPOSE BUILDING, BRGY. BAGACAY, BORBON, CEBU21HI0031 · ₱3,841,200.00 · mapped
- CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS / FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY CAMPUSONG, BORBON, CEBU25HI0049 · ₱2,967,788.24 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, DON GREGORIO ANTIGUA, BORBON, CEBU23HI0071 · ₱2,961,528.57 · mapped
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY DON GREGORIO ANTIGUA, BORBON, CEBU24HI0048 · ₱2,960,000.00 · mapped
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, PUROK SUN-OK, SAN JOSE (CATADMAN), CATMON, CEBU22HI0067 · ₱2,957,841.12 · mapped
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BRGY. SAN JOSE, BOROBN, CEBU23HI0051 · ₱2,957,550.85 · mapped
- CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY TAGNUCAN, BORBON, CEBU25HI0011 · ₱2,953,297.63 · mapped
- CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION(COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY BASAK, CATMON, CEBU25HI0029 · ₱2,948,619.83 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, SITIO TABAYONG LAWOM, BRGY. CADAROHAN, BORBON, CEBU20HI0091 · ₱2,880,900.00 · mapped
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY BASAK, CATMON, CEBU23HI0099 · ₱2,465,000.00 · mapped
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY CLAVERA, BORBON, CEBU23HI0066 · ₱1,977,102.30 · mapped
- CONSTRUCTION OF MULTIPURPOSE BUILDING, TAGNUCAN, BORBON, CEBU23HI0101 · ₱1,977,068.30 · mapped
- CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTIPURPOSE BUILDINGS / FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY TABUNAN, BORBON, CEBU25HI0050 · ₱1,963,298.02 · mapped
- CONSTRUCTION/REHABILITATION OF MULTI-PURPOSE BUILDING, BARANGAY DON GREGORIO ANTIGUA, BORBON, CEBU21HI0006 · ₱1,920,600.00 · mapped
- CONSTRUCTION/REHABILITATION OF MULTI-PURPOSE BUILDING, BRGY. BONGOYAN, BORBON, CEBU21HI0035 · ₱1,920,600.00 · mapped
- IMPROVEMENT OF BARANGAY HALL BUILDING, BRGY. DON GREGORIO ANTIGUA, BORBON, CEBU21HI0050 · ₱1,920,500.00 · mapped
- CONCRETING OF LOCAL ROAD - BRGY. BONGDO GUA, BORBON, CEBU21HI0089 · ₱1,881,000.00 · mapped
- CONCRETING OF LOCAL ROAD - BRGY. TABUNAN, BORBON, CEBU21HI0096 · ₱1,881,000.00 · mapped
- CONCRETING OF LOCAL ROAD - BRGY. LUGO, BORBON, CEBU21HI0094 · ₱1,881,000.00 · mapped
- CONCRETING OF LOCAL ROAD - BRGY. CADARUHAN (SITIO LUNAS), BORBON, CEBU21HI0090 · ₱1,881,000.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. POBLACION, BORBON, CEBU19HI0076 · ₱1,440,450.00 · mapped
Equipment & capacity
PCAB license
- License no.
- 41932
- Category
- A · Medium B
- Minimum net worth for this category
- ₱30,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱300M
- License valid until
- Apr 17, 2027
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 41932); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
2 evaluations listed across 2 GPPB CPES releases; average final rating 95.1% over 1 rated project; 2 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Apr 16, 2024 | DPWH | ₱19,793,196.00 | Completed | 97.0% | 95.1% | 38th, p. 175 |
| Nov 15, 2023 | DPWH | ₱19,793,196.00 | On-going | 94.3% | — | 37th, p. 76 |
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →