RPS BUILDERS GEN CONTRACTOR CORP is listed as a company organization in Philippine public procurement records on this site, with 24 linked DPWH project(s) totaling about ₱209,160,682.49. Recorded delivery grade C (from public DPWH project records — not a finding of wrongdoing).
RPS BUILDERS GEN CONTRACTOR CORP
CGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 24
- Total value
- ₱209,160,682.49
- Published flags
- 0
- Region
- Quezon 3rd DEO · Region IV-A
Licensed officers (PCAB)
- PEDRITO CABRIGA REYES · Authorized Managing Officer (PCAB license 54125) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for RPS BUILDERS GEN CONTRACTOR CORP — not an accusation or finding of wrongdoing.
Score: 79.40 / 100 · Projects in sample: 24 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 69.2/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 69.2
- lateCompletedProjects
- 0
- onTimeCompletedProjects
- 18
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 22
- pastTargetOngoingProjects
- 4
- undatedCompletedProjectsExcluded
- 2
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 24
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0.3
- componentScore
- 100
- projectsWithAbcAndCost
- 24
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 24
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 24
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
24 geotagged projects — Open full map · Download projects (CSV)
- CONSTRUCTION OF ROAD, LAHING TO TUBIGAN ILAYA, MACALELON, QUEZON25DM0013 · ₱19,207,861.25 · mapped
- CONSTRUCTION OF ROAD, KABULIHAN TO SUMAG WESTE - SUMAG ESTE, PITOGO, QUEZON25DM0080 · ₱19,207,412.20 · mapped
- CONCRETING OF BRGY. SAN NICOLAS TO BRGY. SAN VICENTE TO BRGY. MALABAHAY FMR, BRGY. SAN NICOLAS, BRGY. SAN VICENTE AND BRGY. MALABAHAY, MACALELON, QUEZON24DM0148 · ₱14,925,000.00 · mapped
- CONSTRUCTION OF TWO (2) STOREY, FOUR (4) CLASSROOM SCHOOL BUILDING AT CAIGDAL NATIONAL HIGH SCHOOL, UNISAN, QUEZON23DM0125 · ₱14,900,000.00 · mapped
- CONSTRUCTION OF ROAD, KABULIHAN IBABA TO SAN ROQUE, UNISAN, QUEZON25DM0049 · ₱14,405,993.89 · mapped
- ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - GUMACA - PITOGO - MULANAY - SN NARCISO RD - K0295+480 - K0297+325, K0297+342 - K0297+642, SAN NARCISO, QUEZON25DM0027 · ₱14,405,908.27 · mapped
- ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - GUMACA - PITOGO - MULANAY - SN NARCISO RD - K0221+100 - K0222+154, K0233+790 - K0233+840, K0235+780 - K0236+590, K0244+000 - K0244+870, MACALELON & GENERAL LUNA, QUEZON25DM0001 · ₱14,405,571.21 · mapped
- CONCRETING OF BRGY. KANLURANG CALUTAN FMR, BRGY. KANLURANG CALUTAN, AGDANGAN, QUEZON23DM0121 · ₱11,940,000.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY BULO ILAYA, UNISAN, QUEZON25DM0044 · ₱7,202,999.41 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY TAGUMPAY, UNISAN, QUEZON25DM0037 · ₱7,202,999.36 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY RIZAL ILAYA, UNISAN, QUEZON25DM0057 · ₱7,202,999.29 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY BILUCAO, PITOGO, QUEZON25DM0025 · ₱7,202,937.75 · mapped
- CONSTRUCTION OF 1-STOREY 2-CLASSROOM SCHOOL BUILDING IN CAIGDAL ELEMENTARY SCHOOL, BARANGAY CAIGDAL, UNISAN, QUEZON24DM0141 · ₱4,975,000.00 · mapped
- CONSTRUCTION OF 1-STOREY 2-CLASSROOM SCHOOL BUILDING IN AGDANGAN CENTRAL ELEMENTARY SCHOOL, BARANGAY POBLACION 1, AGDANGAN, QUEZON24DM0138 · ₱4,975,000.00 · mapped
- CONSTRUCTION OF 1-STOREY 2-CLASSROOM SCHOOL BUILDING IN SAMPALOC NATIONAL HIGH SCHOOL, BARANGAY SAMPALOC, PITOGO, QUEZON24DM0147 · ₱4,975,000.00 · mapped
- CONSTRUCTION OF 1-STOREY 2-CLASSROOM SCHOOL BUILDING IN GENERAL LUNA NATIONAL HIGH SCHOOL, BARANGAY SAN JOSE, GENERAL LUNA, QUEZON24DM0145 · ₱4,975,000.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. CAIGDAL, UNISAN, QUEZON24DM0098 · ₱4,950,000.00 · mapped
- CONSTRUCTION OF MULTIPURPOSE BUILDING, BARANGAY MANGGAHAN, MUNICIPALITY OF PITOGO, QUEZON, PITOGO, QUEZON24DM0112 · ₱4,950,000.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. CABULIHAN, UNISAN, QUEZON24DM0111 · ₱4,950,000.00 · mapped
- CONSTRUCTION OF MULTIPURPOSE BUILDING, BARANGAY ALMACEN, MUNICIPALITY OF UNISAN, QUEZON, UNISAN, QUEZON24DM0114 · ₱4,950,000.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, POCTOL ELEMENTARY SCHOOL, PITOGO, QUEZON24DM0100 · ₱4,950,000.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. TUBAS, UNISAN, QUEZON24DM0099 · ₱4,950,000.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. MULIGUIN, UNISAN, QUEZON24DM0126 · ₱4,950,000.00 · mapped
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY F. DE JESUS, UNISAN, QUEZON25DM0046 · ₱2,400,999.86 · mapped
Equipment & capacity
PCAB license
- License no.
- 54125
- Category
- B · Medium A
- Minimum net worth for this category
- ₱10,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱150M
- License valid until
- Dec 7, 2026
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 54125); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
No CPES evaluation lists this contractor's PCAB license in the GPPB releases we loaded (34th–41st).
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
- DPWH Infrastructure: 29 awards · ₱421,499,822.22
- 25DM0158 - Construction (Completion) of Municipal₱144,045,101.99· 2025-06-24· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - QUEZON 3RD ED
- 25DM0080 - Construction of Road, Kabulihan to Suma₱19,207,412.20· 2025-05-23· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - QUEZON 3RD ED
- 25DM0008 - Asset Preservation Program – Rehabilita
- 25DM0027 - Asset Preservation Program - Preventive₱14,405,908.27· 2025-03-10· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - QUEZON 3RD ED
- 25DM0001 - Asset Preservation Program - Preventive₱14,405,571.21· 2025-03-10· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - QUEZON 3RD ED
- 25DM0057 - Construction of Multi-Purpose Building,₱7,202,999.29· 2025-03-10· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - QUEZON 3RD ED
- 25DM0037 - Construction of Multi-Purpose Building,₱7,202,999.36· 2025-01-27· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - QUEZON 3RD ED
- 25DM0049 - Construction of Road, Kabulihan Ibaba t₱14,405,993.89· 2025-01-27· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - QUEZON 3RD ED
- 25DM0044 - Construction of Multi-Purpose Building,₱7,202,999.41· 2025-01-27· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - QUEZON 3RD ED
- 25DM0025 - Construction of Multi-Purpose Building,₱7,202,937.75· 2025-01-27· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - QUEZON 3RD ED
- 25DM0046 - Construction (Completion) of Multi-Purp₱2,400,999.86· 2025-01-27· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - QUEZON 3RD ED
- 25DM0013 - Construction of Road, Lahing to Tubigan₱19,207,861.25· 2025-01-27· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - QUEZON 3RD ED
- 24DM0148 - Concreting of Brgy. San Nicolas to Brgy₱14,541,459.01· 2024-06-07· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - QUEZON 3RD ED
- 24DM0145 - Construction of 1-Storey 2-Classroom Sc₱4,864,109.39· 2024-06-07· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - QUEZON 3RD ED
- 24DM0147 - Construction of 1-Storey 2-Classroom Sc₱4,854,074.63· 2024-06-07· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - QUEZON 3RD ED
- 24DM0138 - Construction of 1-Storey 2-Classroom Sc₱4,882,566.26· 2024-05-27· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - QUEZON 3RD ED
- 24DM0141 - Construction of 1-Storey 2-Classroom Sc₱4,920,333.55· 2024-05-27· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - QUEZON 3RD ED
- 24DM0126 - Construction of Multi-Purpose Building,₱4,763,928.72· 2024-05-07· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - QUEZON 3RD ED
- 24DM0111 - Construction of Multi-Purpose Building,₱4,776,384.25· 2024-04-24· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - QUEZON 3RD ED
- 24DM0112 - Construction of Multipurpose Building,₱4,773,435.13· 2024-04-24· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - QUEZON 3RD ED
- 24DM0114 - Construction of Multipurpose Building,₱4,775,858.65· 2024-04-24· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - QUEZON 3RD ED
- 24DM0099 - Construction of Multi-Purpose Building,₱4,776,805.77· 2024-03-27· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - QUEZON 3RD ED
- 24DM0098 - Construction of Multi-Purpose Building,₱4,773,133.62· 2024-03-27· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - QUEZON 3RD ED
- 24DM0100 - Construction of Multi-Purpose Building,₱4,774,960.52· 2024-03-27· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - QUEZON 3RD ED
- 23DM0129 (Re-Advertised) - Construction of Multi-P₱4,726,136.63· 2023-12-04· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - QUEZON 3RD ED
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →