ON TIME BUILDERS INC 40296 is listed as a company organization in Philippine public procurement records on this site, with 13 linked DPWH project(s) totaling about ₱368,004,690.55. No delivery grade published yet (insufficient linked public records).
ON TIME BUILDERS INC 40296
N/GRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 13
- Total value
- ₱368,004,690.55
- Published flags
- 0
- Region
- Cebu 1st DEO · Region VIII
Public Record Grade
A transparent, data-derived summary of reported public records for ON TIME BUILDERS INC 40296 — not an accusation or finding of wrongdoing.
Not graded yet — the Public Record Grade has not been computed for this contractor.
Computed automatically from public DPWH, PhilGEPS, and COA records. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
12 geotagged project(s) — Open full map
- ROAD WIDENING - PRIMARY ROADS - DAANG MAHARLIKA (LT) - KO935+585.30 - KO936+000; KO935+(-634) - KO935+540; KO943+277 - KO944+255; KO945+222 - KO946+448, LEYTE 2ND LD18I00012 · ₱140,737,747.18 · mapped
- CLUSTER SB-2017-10 : CONSTRUCTION OF BUILDING, BOBON & CATARMAN, N. SAMAR17IH0123 · ₱42,229,592.25 · mapped
- CLUSTER SB-2017-09 : CONSTRUCTION OF BUILDING, VICTORIA, N. SAMAR17IH0122 · ₱30,109,111.41 · mapped
- LOCAL INFRASTRUCTURE PROGRAM - FLOOD CONTROL AND DRAINAGE - CONSTRUCTION OF DRAINAGE AT BRGY. POBLACION, TALISAY CITY, CEBU18HE0045 · ₱27,930,458.77 · mapped
- CONSTRUCTION OF DUMLOG RIVER (GABIONS), (UPSTREAM), SIBONGA, CEBU18HE0009 · ₱27,797,058.08 · mapped
- CONSTRUCTION OF BOLINAWAN RIVER (GABIONS) (UPSTREAM), CARCAR CITY, CEBU18HE0008 · ₱27,794,318.62 · mapped
- FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF REVETMENT (GABIONS) ALONG SUBA RIVER AT SUBA BRIDGE (K0050+640.00) - UPSTREAM, SIBONGA, CEBU18HE0048 · ₱18,620,519.71 · mapped
- LOCAL INFRASTRUCTURE PROGRAM - FLOOD CONTROL AND DRAINAGE - CONSTRUCTION OF DRAINAGE AT BRGY. CANSOJONG, TALISAY CITY, CEBU18HE0046 · ₱18,619,702.89 · mapped
- LOCAL INFRASTRUCTURE PROGRAM - FLOOD CONTROL AND DRAINAGE - CONSTRUCTION OF DRAINAGE AT BRGY. TANGKE, TALISAY CITY, CEBU18HE0047 · ₱14,896,023.00 · mapped
- REPAIR/RESTORATION OF DAMAGED,PCCP ALONG BURAUEN-ALBUERA ROAD,BRGY. DINAAYAN,BURAUEN,LEYTE18ID0141 · ₱10,390,474.73 · mapped
- CONCRETING OF BRGY. SAN AGUSTIN FMR,BRGY. SAN AGUSTIN,DULAG,LEYTE18ID0139 · ₱4,922,994.73 · mapped
- REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES GERATAG BR. 2 (B00288SM) ALONG ALLEN - CATARMAN RD, SAN JOSE, N. SAMAR17IH0026 · ₱2,372,698.47 · mapped
- CONSTRUCTION OF WATER SUPPLY (LEVEL II), BRGY. PALANIT, SAN ISIDRO, N. SAMAR17IH0143 · ₱1,583,990.71
