JMJP CONST AND SUPPLY is listed as a company organization in Philippine public procurement records on this site, with 40 linked DPWH project(s) totaling about ₱313,091,250.00. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
JMJP CONST AND SUPPLY
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 40
- Total value
- ₱313,091,250.00
- Published flags
- 0
- Region
- Cotabato 1st DEO · Region XII
Licensed officers (PCAB)
- Julius Tendero Cadava, Jr. · Authorized Managing Officer (PCAB license 34068) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for JMJP CONST AND SUPPLY — not an accusation or finding of wrongdoing.
Score: 85.60 / 100 · Projects in sample: 40 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 83.8/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 83.8
- lateCompletedProjects
- 9
- onTimeCompletedProjects
- 29
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 39
- pastTargetOngoingProjects
- 1
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 92.5/100 · Weight: 24%
- totalProjects
- 40
- componentScore
- 92.5
- terminatedProjects
- 1
- terminationRatePct
- 2.5
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 39
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 40
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 40
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
40 geotagged projects — Open full map · Download projects (CSV)
- SADAAN - CENTRAL GLAD BYPASS ROAD, COTABATO, MIDSAYAP, COTABATO25MD0051 · ₱47,477,080.00 · mapped
- INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (GUARDRAILS, ROAD SIGNS, PAVEMENT MARKINGS, ROADWAY LIGHTING) ALONG BANISILAN-GUILING-ALAMADA-LIBUNGAN RD, LIBUNGAN, NORTH COTABATO25MD0022 · ₱46,793,766.03 · mapped
- CONSTRUCTION OF CONCRETE ROAD - CONSTRUCTION OF KITUBOD-MAITING ROAD, BARANGAY KITUBOD, LIBUNGAN, NORTH COTABATO22MD0049 · ₱19,403,999.74 · mapped
- CONCRETING OF BRGY. LAGUMBINGAN TO BRGY. BAGUMBA FMR, BRGY. LAGUMBINGAN AND BRGY. BAGUMBA, MIDSAYAP, COTABATO25MD0071 · ₱14,920,000.00 · mapped
- CONSTRUCTION OF CONCRETE ROAD - CONSTRUCTION OF KOLAMBOGAN ROAD, CABPANGI, LIBUNGAN, NORTH COTABATO22MD0051 · ₱14,552,996.58 · mapped
- CONCRETING OF TINGUMAN-KISULAO-LAGO-LOWER TAMBUAN ROAD, BAO, ALAMADA, NORTH COTABATO20MD0105 · ₱13,964,854.07 · mapped
- CONCRETING OF SITIO BACOLOD TO SITIO BATO, BRGY. BAO, ALAMADA, COTABATO24MD0074 · ₱13,925,000.00 · mapped
- CONCRETING OF BRGY. TOMADO-BRGY. MALAPANG FMR, BRGY. TOMADO AND BRGY. MALAPANG, ALEOSAN, COTABATO23MD0083 · ₱13,790,700.00 · mapped
- CONCRETING OF BRGY. TOMADO-BRGY. MALAPANG FMR PHASE II, BRGY. TOMADO AND BRGY. MALAPANG, ALEOSAN, COTABATO24MD0063 · ₱9,945,000.00 · mapped
- CONSTRUCTION OF DRAINAGE STRUCTURE - CONSTRUCTION OF DRAINAGE SYSTEM IN BARANGAY POBLACION, LIBUNGAN, NORTH COTABATO22MD0061 · ₱9,800,000.00 · mapped
- CONSTRUCTION OF CONCRETE ROAD - JCT. SAN MATEO TO UPPER MINGADING LEADING TO UK PEAK, BRGY. SAN MATEO, ALEOSAN, COTABATO22MD0044 · ₱9,701,996.70 · mapped
- CONSTRUCTION OF ROAD, PUROK 6 - MALITUBOG PROPER, MALITUBOG, ALAMADA, NORTH COTABATO23MD0037 · ₱4,950,000.00 · mapped
- CONSTRUCTION OF PUROK 6 - MALITUBOG PROPER ROAD, MALITUBOG, ALAMADA, COTABATO24MD0005 · ₱4,945,000.00 · mapped
- REHABILITATION OF MULTI-PURPOSE BUILDING (MUNICIPAL GYM), KITACUBONG, ALAMADA, NORTH COTABATO23MD0126 · ₱4,944,999.95 · mapped
- CONSTRUCTION OF ROAD FROM KRISLAM - MACABASA, BARANGAY PIGCAWARAN, ALAMADA, NORTH COTABATO25MD0017 · ₱4,944,989.44 · mapped
- CONSTRUCTION OF KITACUBONG - SITIO ABAGA ROAD, KITACUBONG, ALAMADA, COTABATO24MD0004 · ₱4,944,986.75 · mapped
- CONSTRUCTION OF ROAD, KITACUBONG - POLAYAGAN ROAD, ALAMADA, NORTH COTABATO23MD0001 · ₱4,900,500.00 · mapped
- CONSTRUCTION OF ROAD, NEW LEON - HELMET, UPPER DADO ROAD, ALAMADA, NORTH COTABATO23MD0005 · ₱4,900,500.00 · mapped
- CONSTRUCTION OF ROAD, JCT. TOURISM ROAD - PUROK LANZONES ROAD, LOWER DADO, ALAMADA, NORTH COTABATO23MD0007 · ₱4,900,500.00 · mapped
- CONSTRUCTION OF CONCRETE ROAD - CONSTRUCTION OF TOMADO-BALISAWAN ROAD, BARANGAY TOMADO, ALEOSAN, NORTH COTABATO22MD0024 · ₱4,900,500.00 · mapped
- CONSTRUCTION OF CONCRETE ROAD - CONSTRUCTION OF BARANGAY PENTIL (ALEOSAN) - BARANGAY MALAMOTE (MIDSAYAP) ROAD, ALEOSAN, NORTH COTABATO22MD0022 · ₱4,900,500.00 · mapped
- CONSTRUCTION OF ROAD, KITACUBONG-ABAGA ROAD, KITACUBONG, ALAMADA, NORTH COTABATO23MD0020 · ₱4,900,499.99 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, POBLACION 3, PIGCAWAYAN, COTABATO23MD0105 · ₱4,824,000.00 · mapped
- CONCRETING OF BARANGAY MIDPAPAN ROAD, PIGCAWAYAN, COTABATO23MD0100 · ₱4,805,000.00 · mapped
- CONCRETING OF JCT. PROVINCIAL ROAD - BARANGAY POBLACION 3 - BARANGAY POBLACION 4 - BARANGAY POBLACION 7 ROAD MIDSAYAP, COTABATO23MD0098 · ₱4,804,999.99 · mapped
- CONCRETING OF BARANGAY BULUCAON ROAD - PUROK SAMPAGUITA - PUROK MAGSASAKA - BARANGAY TUBON ROAD, BARANGAY BULUCAON, PIGCAWAYAN, NORTH COTABATO23MD0099 · ₱4,804,999.97 · mapped
- CONSTRUCTION OF ROAD IN BARANGAY SAN MATEO - TOMADO (SAN MATEO SECTION), ALEOSAN, COTABATO22MD0071 · ₱3,811,491.07 · mapped
- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS ALONG BANISILAN-GUILING-ALAMADA-LIBUNGAN RD, ALAMADA, COTABATO23MD0027 · ₱3,395,699.98 · mapped
- CCONCRETING OF ROAD FROM PUROK 2 - PUROK 1, MALAMOTE - PENTIL ROAD, BRGY. PENTIL, ALEOSAN, NORTH COTABATO21MD0005 · ₱1,960,200.00 · mapped
- CONCRETING OF TOMADO-BALIWASAN ROAD, BRGY. TOMADO, ALEOSAN, NORTH COTABATO21MD0006 · ₱1,960,189.46 · mapped
- CONCRETING OF PAGLAUM ROAD CONNECTING ANICK, BARANGAY BALOGO, PIGCAWAYAN, COTABATO21MD0011 · ₱1,960,187.26 · mapped
- CONCRETING OF TOMADO PROPER TO LOWER MINGADING, TOMADO, ALEOSAN, COTABATO20MD0047 · ₱1,886,563.06 · mapped
- CONCRETING OF JUNCTION DUALING-NEW PANAY NATIONAL HIGHWAY TO SITIO LAPU-LAPU, LAWILI, ALEOSAN, COTABATO20MD0041 · ₱1,885,251.82 · mapped
- CONCRETING OF JUNCTION DUALING-NEW PANAY NATIONAL HIGHWAY CROSSING PUROK GUMAMELA, KATALICANAN, ALEOSAN, COTABATO20MD0040 · ₱1,884,872.56 · mapped
- CONCRETING OF JUNCTION NEW PANAY NATIONAL HIGHWAY, SITIO NANGKA, NEW LEON, ALEOSAN CONNECTING BARANGAY CAWILIHAN, NEW LEON, ALEOSAN, COTABATO20MD0056 · ₱1,884,727.16 · mapped
- CONCRETING OF JUNCTION DUALING-BALIKI NATIONAL HIGHWAY TO PUROK I, DUALING, ALEOSAN, COTABATO20MD0039 · ₱1,884,318.07 · mapped
- REHABILITATION / MAJOR REPAIR OF PERMANENT BRIDGE - MALUPOG BR. (B01605MN) ALONG BANISILAN-GUILING-ALAMADA LIBUNGAN RD, ALAMADA, NORTH COTABATO23MD0011 · ₱990,000.00 · mapped
- REHABILITATION / MAJOR REPAIR OF BRIDGE - TUBAK BRIDGE (B00325MN) ALONG DULAING-NEW PANAY-MIDSAYAP RD., ALEOSAN, NORTH COTABATO22MD0043 · ₱970,192.72 · mapped
- REHABILITATION / MAJOR REPAIR OF BRIDGE - OLANDANG BRIDGE IV (B00332MN) ALONG MIDSAYAP- MAKAR RD., MIDSAYAP, NORTH COTABATO22MD0042 · ₱970,187.63 · mapped
- REHABILITATION OF MULTI-PURPOSE BUILDING (MUNICIPAL GYM), KITACUBONG, ALAMADA, NORTH COTABATO23MD0026 · ₱0.00 · mapped
Equipment & capacity
PCAB license
- License no.
- 34068
- Category
- B · Medium A
- Minimum net worth for this category
- ₱10,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱150M
- License valid until
- Oct 13, 2027
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 34068); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
2 evaluations listed across 2 GPPB CPES releases; average final rating 85.4% over 1 rated project; 2 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Jun 5, 2025 | DPWH | ₱47,477,080.00 | On-going | 88.6% | — | 40th, p. 167 |
| Mar 18, 2023 | DPWH | ₱14,552,997.00 | Completed | 85.4% | 85.4% | 35th, p. 92 |
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →