JLL PULSAR CONST CORP FORMERLY: PULSAR CONST is listed as a company organization in Philippine public procurement records on this site, with 237 linked DPWH project(s) totaling about ₱9,396,965,110.61. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
JLL PULSAR CONST CORP FORMERLY: PULSAR CONST
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 237
- Total value
- ₱9,396,965,110.61
- Published flags
- 1
- Region
- Cagayan 2nd DEO · Region II
Online presence
Google Maps: JLL Pulsar Construction Corporation Main Office★ 5 (4 reviews)Google Maps, 2026-10-22
JQMR+G9X, Dodan, Peñablanca, Cagayan
Licensed officers (PCAB)
- JOSEPH JEREMY DE GUZMAN LARA · Authorized Managing Officer (PCAB license 24422) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for JLL PULSAR CONST CORP FORMERLY: PULSAR CONST — not an accusation or finding of wrongdoing.
Score: 82.80 / 100 · Projects in sample: 237 · As of Oct 22, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 65.4/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 65.4
- lateCompletedProjects
- 123
- onTimeCompletedProjects
- 100
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 235
- pastTargetOngoingProjects
- 12
- undatedCompletedProjectsExcluded
- 2
- Termination rate
Component score: 98.7/100 · Weight: 21%
- totalProjects
- 237
- componentScore
- 98.7
- terminatedProjects
- 1
- terminationRatePct
- 0.4
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 237
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 99.9/100 · Weight: 11%
- projects
- 237
- componentScore
- 99.9
- flagsPerProject
- 0
- publishedV2Flags
- 1
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 237
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 46 of 224 geotagged projects (largest by contract value) — Open full map
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF BY-PASS AND DIVERSION ROAD, ALCALA-STO. NIÑO-LASAM ROAD (NAMUCCAYAN BRIDGE), STO NIÑO, CAGAYAN20B00026 · ₱353,000,789.08 · mapped
- CONVERGENCE AND SUPPORT PROGRAM: CONST'N/IMPV'T OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS: ACCESS ROADS LEADING TO CALLAO CAVES TOURISM ZONE (TAWI-CALLAO ROAD) - BRIDGE CONSTRUCTION, BRGY. PATAGUELEG, PEÑABLANCA, CAGAYAN18B00056 · ₱250,899,603.49 · mapped
- MFO 1: NATIONAL ROAD NETWORK SERVICES: NETWORK DEVELOPMENT: IMPROVEMENT/WIDENING OF NATIONAL ROAD-OTHER PRIMARY ROADS ALONG SANTIAGO-TUGUEGARAO ROAD, K0423+845.8- K0429+192.70=STA. 423+816.6-STA. 429+226, STA. MARIA, ISABELA17B00020 · ₱182,588,370.35 · mapped
- MFO 2: FLD. MNG'T SERVICES: CONST'N/MAINTENANCE OF FLD. MITIGATION STRUCTURES & DRAINAGE SYSTEM-CONS16B00021 · ₱173,789,758.66
- MF0 1-NAT'L RD NETWORK SERVICES:NETWORK DEV'T:IMPV'T/WIDENING OF NAT'L RDS OUTSIDE N1 SANTIAGO-TUGUE15B00108 · ₱157,177,901.28
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM: WIDENING OF PERMANENT BRIDGES: PINGKIAN BR. (B01862LZ) ALONG NUEVA VIZCAYA - BENGUET RD23B00050 · ₱156,363,866.13 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP): SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - PREVENTIVE MAINTENANCE - PRIMARY ROADS ALONG MAHARLIKA HIGHWAY - K0220+576 - K0222+115.70, K0237+627 - K0237+804, K0238+147 - K023825B00073 · ₱134,688,629.34 · mapped
- ASSET PRESERVATION OF NAT'L RD., REHAB/RECONST'N/UPGRADING OF NAT'L RD. INCLUDING DRAINAGE BASED ON15B00070 · ₱129,089,449.04 · mapped
- MFO 1: NATIONAL ROAD NETWORK SERVICES: NETWORK DEVELOPMENT: IMPROVEMENT/WIDENING OF NATIONAL ROADS ALONG (N1) MANILA NORTH ROAD, K0648+000 TO K0649+220 (STA. 648+025.5 TO STA.649+266.2), K0651+000 TO K0652+767 (STA. 651+000 TO STA. 652+748.58),PAMPLONA, C17B00014 · ₱119,620,664.49 · mapped
- NETWORK DEV'T:WIDENING OF NAT'L RDS. PRIMARY RD. ALONG N1, MANILA RD., SANCHEZ MIRA, CAGAYAN15B00072 · ₱118,947,937.44 · mapped
- NETWORK DEVELOPMENT: ROAD WIDENING: PRIMARY ROADS ALONG MANILA NORTH ROAD, K0646+000-K0647+977=STA. 646+000-STA. 648+000, K0652+767-K0653+248=STA. 652+767-STA. 653+260, K0653+280-K0653+399.5=STA. 653+280-STA. 653+432, PAMPLONA, CAGAYAN18B00019 · ₱117,980,488.14 · mapped
- MFO 1: NAT'L ROAD NETWORK SERVICES: NETWORK DEV'T: IMPV'T/WIDENING OF NAT'L RD. PRIMARY ALONG PRIMARY ROADS N1 CAGAYAN VALLEY RD, K0471+120 TO K0473+520,K0485+000 TO K0485+300, K0487+660 TO K0488+700, K0488+900 TO K0489+016.70, TUGUEGARAO AND IGUIG, CAGAY17B00017 · ₱113,928,848.45 · mapped
- NETWORK DEV'T: WIDENING OF NAT'L RDS., PRIMARY RD ALONG N1/CAGAYAN VALLEY RD., NAMABBALAN, TUG. CITY15B00067 · ₱110,643,311.00 · mapped
- CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, VILLASIS-STO TOMAS BYPASS ROAD, PANGASINAN20A00001 · ₱105,800,000.00 · mapped
- ASSET PRESERVATION:REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PMS/HDM-4, BAYBAYOG-BAGGAO-DALIN-STA MARGARITA ROAD, K0513+(-223 TO K0513+029.00,K0513+075 TO K0514+947;K0516+000 TO K0519+000;K0519+000 TO K015B00048 · ₱102,950,922.34 · mapped
- RD. UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL RD. STRATEGIES,(HDM-4),SAMPAGUITA-WARAT-LA SUERTE-C15B00032 · ₱101,536,918.90 · mapped
- WIDENING OF PERMANENT BRIDGES, ALORAGAT BR. (B00731LZ) ALONG MANILA NORTH ROAD20A00121 · ₱100,263,579.18 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM : ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROAD - DAANG MAHARLIKA (LZ), K0417+890 - K0419+ 000, K0420+ 127 - K0421+ 000.00, K0423+ 360 - K0423+ 861.00, TUMAUINI, ISABELA23B00044 · ₱97,287,457.44 · mapped
- OO 1: CONST'N OF MISSING LINKS/NEW ROADS SAN JOSE-QUIBAL ROAD INCLUDING ROW AND SLOPE PROTECTION, CAGAYAN, SECT. 1 : STA. 0+000-STA. 0+067.73; SECT 2: STA. 0+000-STA. 0+542.50; SECT 3 : STA. 0+000-STA. 0+963.74, PEÑABLANCA, CAGAYAN19B00036 · ₱96,678,274.96 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF CHICO RIVER CONTROL STRUCTURE ALONG CHICO RIVER, STO. NI21BC0069 · ₱96,500,000.00 · mapped
- ORGANIZATIONAL OUTCOME: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE PROGRAM, WIDENING OF PERMANENT BRIDGES, PINACANAUAN BRIDGE (B01910LZ) ALONG CAGAYAN VALLEY ROAD, TUGUEGARAO CITY, CAGAYAN18BD0143 · ₱95,524,342.64 · mapped
- CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-SANCHEZ MIRA BYPASS ROAD, INCL. BRIDGE AT SANCHEZ MIRA, CAGAYAN18BC0107 · ₱93,590,450.50 · mapped
- CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - VILLASIS-STO. TOMAS BYPASS ROAD, PANGASINAN21A00146 · ₱92,825,000.00 · mapped
- MFO1 NATIONAL ROAD NETWORK SERVICES-ROAD UPGRADING (UNPAVED TO PAVED) TERTIARY AYAGA-STA. MARCELA-FLORA-LASAM ROAD, K0670+(-806) - K0671+047, CHAINAGE 1292- CHAINAGE 2368, CHAINAGE2388- CHAINAGE 349217BC0085 · ₱92,634,450.94 · mapped
- MFO 1 NATIONAL ROAD NETWORK SERVICES-NETWORK DEVELOPMENT-CONSTRUCTION OF MISSING GAPS CONNECTING ROADS, INCLUDING ROW AYAGA-STA MARCELA-FLORA-LASAM-ROAD, LASAM, CAGAYAN17BC0079 · ₱92,626,865.50 · mapped
- MFO1: NAT'L. ROAD NETWORK SERVICES: NETWORK DEVT.: WIDENING OF NAT'L. ROAD ALONG TERTIARY ROADS ALONG CAR,K0498+000-K0500+500,K0502+800-K0503+887, BRGY. GEN. BALAO, SAMPAGUITA, SOLANA, CAGAYAN17BD0065 · ₱90,933,610.95 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE PRIMARY ROADS DAANG MAHARLIKA (LZ), K0255+070-K0255+140, ABIAN, BAM23BI0063 · ₱86,850,000.00 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE PRIMARY ROADS DAANG MAHARLIKA (LZ), K0254+800-K0254+900, ABIAN, BAM23BI0064 · ₱86,850,000.00 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE PRIMARY ROADS DAANG MAHARLIKA (LZ), K0307+250-K0307+350, SAN LUIS,23BI0066 · ₱86,850,000.00 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE PRIMARY ROADS DAANG MAHARLIKA (LZ), K0254+600-K0254+700, ABIAN, BAM23BI0065 · ₱86,850,000.00 · mapped
- ACCESS ROAD LEADING TO TOURISM AREA CASSILY LAKE RESORT TO SOLIDARITY PARK (LAKAMBINI TO ABBUT BAGUMBAYAN ROAD VIA MAMBACAG, PALCA, ANGANG, MALUMIN AND SAN LUIS), TUAO, CAGAYAN18BD0045 · ₱83,304,817.85 · mapped
- OO 1: ENSURE SAFE AND RELIABLE NATL ROAD SYSTEM: NETWORK DEV'T PROGRAM: CONST'N OF BY-PASS AND DIVERSION ROADS-TUGUEGARAO WEST DIVERSION ROAD (JCT. CARIG-LINAO-ATULAYAN-BAGAY-BUNTUN) INCLUDING ROW, CAGAYAN STA. 7+260-STA. 8+987.62, TUGUEGARAO CITY18B00038 · ₱77,217,644.87 · mapped
- RECONSTRUCTION OF CABBO-CABASAN BRIDGE, CABBO, PEÑA. CAGAYAN VALLEY, CABBO, PEÑA. CAGAYAN VALLEY18BD0101 · ₱73,914,386.41 · mapped
- NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-MANILA NORTH ROAD K0657+000-K0660+60018BC0054 · ₱68,271,787.24 · mapped
- ENSURE SAFE & RELIABLE NAT'L. RD SYSTEM-ASSET PRESERVATION PROGRAM, REHAB./RECONST./ UPGRADING OF DAMAGED PAVED RDS-TERTIARY RDS, CAR-K0494+000-K0495+000,K0495+000-K0496+190,K0497+849-K0498+777,K0519+121-K0522+101,K0522+112-K0523+351,K0523+367-K0524+00018BD0124 · ₱64,221,942.05 · mapped
- LOCAL PROGRAM - LOCAL ROADS AND BRIDGES: LOCAL ROADS: CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - CONCRETING OF BRGY. STA. CLARA ROAD LEADING TO MOUNT CAGUA, GONZAGA, CAGAYAN20B00045 · ₱63,786,719.95 · mapped
- MF01: NAT'L. ROAD NETWORK SERVICES: NETWORK DEV'T.: WIDENING OF NAT'L. ROAD ALONG TERTIARY ROADS ALONG CAR, K0503+887-K0506+800, BRGY. SAMPAGUITA, VILLA REY, SOLANA, CAGAYAN17BD0066 · ₱63,601,172.91 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF ABULUG RIVER CONTROL AT STA. ROSA, ABULUG, CAGAYAN19BC0129 · ₱62,725,000.00 · mapped
- CSSP-CONST./IMPVT. OF ACCESS ROAD LEADING TO TRADES AND INDUSTRIES AND ECONOMIC ZONES-CENTRO 2-NAGBARANGANAN-CSU ROAD CONNECTING TO CACAO PLANTATION AREA IN SUPPORT OF CACAO INDUSTRY, CENTRO 2, NAGBARANGANAN, SANCHEZ MIRA, CAGAYAN19BC0172 · ₱59,930,189.33 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-BRIDGE PROGRAM-WIDENING OF PERMANENT BRIDGES-CALOG BR. (B01025LZ) ALONG MANILA NORTH RD, ABULUG, CAGAYAN23BC0012 · ₱58,865,000.00 · mapped
- MFO 1-CONST'N & MAINTENANCE OF BRIGES ALONG NAT'L RDS: WIDENING OF PERMANENT BRIDGES(TO MORE THAN TW16B00006 · ₱58,027,563.95
- ASSET PRESERVATION-REHAB./RECONST./UPGRADING OF DAMAGED PAVED ROADS-SECONDARY ROADS- PAVING OF UNPAVED ROADS-JCT. AYAGA ( ABULUG)-BALLESTEROS-APARRI ROAD K0683+842-K0688+404, ABULUG, CAGAYAN19BC0170 · ₱57,900,000.00 · mapped
- PAVING OF UNPAVED ROADS-AYAGA-STA.MARCELA-FLORA-LASAM RD- S00801LZ CHAINAGE 3472-CHAINAGE4059.4, CHAINAGE 4359.4-CHAINAGE 558018BC0039 · ₱57,689,471.81 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING - PRIMARY ROADS- MANILA NORTH ROAD, K0660+620-K0662+069, PAMPLONA-ABULUG, CAGAYAN21BC0046 · ₱57,105,580.00 · mapped
- REPLACEMENT OF PERMANENT WEAK BRIDGES - C.P. PRIMICIAS BRIDGE (B01597LZ) ALONG BINALONAN-ASINGAN-STA. MARIA ROAD, BINALONAN, PANGASINAN21AI0001 · ₱56,278,688.92 · mapped
- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF CAGAYAN RIVER CONTROL CALLAO SUR LASAM,CAGAYAN18BC0037 · ₱55,597,259.02 · mapped
- CONSTRUCTION OF NATAPPIAN FLOOD CONTROL SYSTEM (DOWNSTREAM), STA. 0+220-STA. 0+560, BRGY. NATAPPIAN, SOLANA, CAGAYAN18BD0061 · ₱55,169,685.85 · mapped
- NETWORK DEV'T: IMPV'T/WIDENING OF NAT'L RD. ALONG N1 MANILA NORTH ROAD, CLAVERIA, CAGAYAN15B00073 · ₱54,858,508.29 · mapped
- NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING BANGAG-MAGAPIT RD K0691+981-K0693+747, K0695+000-K0695+284, K0695+305-K0695+847, K0695+878-K0696+00918BC0010 · ₱54,773,264.28 · mapped
- MFO 1-CONST'N & MAINTENANCE OF BRIDGES ALONG NAT'L RD., WIDENING OF PERMANENT BRIDGES(TO MORE THAN 216B00005 · ₱53,360,007.32
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
