1ST CUT is listed as a company organization in Philippine public procurement records on this site, with 36 linked DPWH project(s) totaling about ₱333,798,239.53. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
1ST CUT
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 36
- Total value
- ₱333,798,239.53
- Published flags
- 0
- Region
- Aurora DEO · Region III
Public Record Grade
A transparent, data-derived summary of reported public records for 1ST CUT — not an accusation or finding of wrongdoing.
Score: 83.10 / 100 · Projects in sample: 36 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 75/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 75
- lateCompletedProjects
- 11
- onTimeCompletedProjects
- 23
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 36
- pastTargetOngoingProjects
- 2
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 36
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 36
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 36
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 36
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
36 geotagged projects — Open full map · Download projects (CSV)
- CONCRETING OF ROAD, STA. LUCIA, MA. AURORA, AURORA19CN0131 · ₱29,700,000.00 · mapped
- CONCRETING OF SAN JOSE - BRGY. 2 ROAD, MARIA AURORA, AURORA20CN0061 · ₱24,500,000.00 · mapped
- CONCRETING OF ROAD, BRGY. RESERVA, BALER, AURORA19CN0074 · ₱24,500,000.00 · mapped
- CONSTRUCTION OF BAUBO FLOOD CONTROL, MARIA AURORA, AURORA19CN0038 · ₱24,500,000.00 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BRGY. DIKAPINISAN, SAN LUIS, AURORA24CN0152 · ₱19,800,000.00 · mapped
- CONSTRUCTION OF L. PIMENTEL - SO. IBAYO FLOOD CONTROL, BRGY. L. PIMENTEL, SAN LUIS, AURORA19CN0054 · ₱19,600,000.00 · mapped
- CONSTRUCTION OF DRAINAGE SYSTEM, BRGY. 4, SAN LUIS, AURORA24CN0151 · ₱9,900,000.00 · mapped
- REPAIR/REHABILITATION OF PHILIPPINE NATIONAL POLICE BUILDING, CAMP RAVINA, BARANGAY SABANG, BALER, AURORA21CN0105 · ₱9,900,000.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BALER, AURORA (PHASE 1)24CN0160 · ₱9,863,406.92 · mapped
- CONCRETING OF QUIRINO-SAN LEONARDO-DEBUCAO ROAD, MA. AURORA, AURORA18CN0021 · ₱9,800,000.00 · mapped
- CONSTRUCTION OF ROAD, BRGY. LOBBOT, DIPACULAO, AURORA24CN0130 · ₱9,674,035.75 · mapped
- CONCRETING OF BACONG - SAN JOSE - NONONG ROAD, SAN LUIS, AURORA18CN0017 · ₱9,572,480.29 · mapped
- CONSTRUCTION OF ROAD, BRGY. SAN JOSE, SAN LUIS, AURORA22CN0093 · ₱9,310,470.05 · mapped
- CONSTRUCTION OF ROAD, BRGY. 04, MARIA AURORA, AURORA22CN0072 · ₱9,304,170.40 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BALER, AURORA (PHASE 2)24CN0045 · ₱8,339,248.35 · mapped
- CONSTRUCTION OF CLASSROOMS (3-UNITS UNIQUE WORKSHOP 7 X 22.5), DIAGYAN NATIONAL HIGH SCHOOL, DILASAG, AURORA17CN0166 · ₱8,288,025.13 · mapped
- CONSTRUCTION OF ROAD, GINTONG PANGARAP VILLAGE, POBLACION ZONE II, DINALUNGAN, AURORA21CN0097 · ₱7,920,000.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. DINADIAWAN, DIPACULAO, AURORA22CN0146 · ₱7,840,000.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), FLORIDA ELEMENTARY SCHOOL, FLORIDA, MARIA AURORA, AURORA24CN0161 · ₱6,304,455.05 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), PAULINO L. BAUTISTA ELEMENTARY SCHOOL, SIMABAHAN, DINALUNGAN, AURORA24CN0170 · ₱6,304,372.33 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY 4, MARIA AURORA, AURORA20CN0029 · ₱5,445,000.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY 2, MARIA AURORA, AURORA20CN0028 · ₱5,445,000.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, SETAN ELEMENTARY SCHOOL, BARANGAY CALABUANAN, BALER, AURORA21CN0029 · ₱5,445,000.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY STO. CRISTO, MARIA AURORA, AURORA22CN0053 · ₱5,390,000.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BRGY. DINIOG, DILASAG, AURORA PROVINCE18CN0019 · ₱4,950,000.00 · mapped
- CONSTRUCTION OF DRAINAGE SYSTEM, BRGYS. 1 TO 3, SAN LUIS, AURORA19CN0027 · ₱4,950,000.00 · mapped
- CONSTRUCTION OF 1-STOREY 2-CLASSROOM SCHOOL BUILDING IN MAPALAD ELEMENTARY SCHOOL, BRGY. MAPALAD, DINALUNGAN, AURORA24CN0195 · ₱4,909,730.42 · mapped
- CONSTRUCTION AND REHABILITATION OF MULTI-PURPOSE BUILDINGS (COVERED COURT), BRGY. 2, SAN LUIS, AURORA PROVINCE18CN0070 · ₱4,865,698.45 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BRGY. CABITUCULAN EAST, MARIA AURORA, AURORA18CN0004 · ₱4,842,723.90 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. RAMADA, MARIA AURORA, AURORA24CN0163 · ₱4,836,824.55 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (MARKETPLACE), BRGY. DIAGYAN, DILASAG, AURORA19CN0090 · ₱3,900,071.86 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, WENCESLAO ELEMENTARY SCHOOL, BARANGAY WENCESLAO, MARIA AURORA, AURORA21CN0031 · ₱2,970,000.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, RAMADA ELEMENTARY SCHOOL, BRGY. RAMADA, MARIA AURORA, AURORA22CN0154 · ₱2,940,000.00 · mapped
- CONSTRUCTION OF CLASSROOM (UNIQUE WORKSHOP 7 X 22.5), ROSAURO R. TANGSON SR. NATIONAL HIGH SCHOOL, SAN LUIS, AURORA17CN0171 · ₱2,880,712.43 · mapped
- CONSTRUCTION OF CLASSROOM (WORKSHOP BUILDING 7M X 18M), MANGGITAHAN NATIONAL HIGH SCHOOL, DILASAG, AURORA17CN0160 · ₱2,582,508.33 · mapped
- CONSTRUCTION OF CLASSROOM (WORKSHOP BUILDING (7M X 18M), ROSAURO R. TANGSON SR. NATIONAL HIGH SCHOOL, SAN LUIS, AURORA17CN0155 · ₱2,524,305.32 · mapped
Equipment & capacity
PCAB license
No PCAB license is linked to this record. It may be a joint venture, a foreign firm, or a name we could not match. Search PCAB.
Government performance ratings (CPES)
No CPES evaluation lists this contractor's PCAB license in the GPPB releases we loaded (34th–41st).
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →