J G GARCIA CONST is listed as a company organization in Philippine public procurement records on this site, with 249 linked DPWH project(s) totaling about ₱2,279,859,500.78. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
J G GARCIA CONST
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 249
- Total value
- ₱2,279,859,500.78
- Published flags
- 0
- Region
- Pangasinan 2nd DEO · Region I
Online presence
Google Maps: J.G. Garcia Construction★ 3 (2 reviews)Google Maps, 2026-10-22
Barangay Lanas, Mangaldan, Pangasinan, 39FM+VPV, Mangaldan, Pangasinan
Public Record Grade
A transparent, data-derived summary of reported public records for J G GARCIA CONST — not an accusation or finding of wrongdoing.
Score: 82.70 / 100 · Projects in sample: 249 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 68.3/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 68.3
- lateCompletedProjects
- 23
- onTimeCompletedProjects
- 173
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 233
- pastTargetOngoingProjects
- 37
- undatedCompletedProjectsExcluded
- 16
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 249
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 249
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 249
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 249
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 45 of 223 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- CONSTRUCTION OF RIVERBANK PROTECTION ALONG SINUCALAN RIVER BARANGAY BACAYAO SUR, DAGUPAN CITY, PANGA25AH0004 · ₱94,569,761.34 · mapped
- CONSTRUCTION OF PROTECTION WORKS ALONG AGNO RIVER, BARANGAY BOGAOAN, SAN CARLOS CITY, PANGASINAN (PHASE II)24AJ0016 · ₱48,990,519.16 · mapped
- CONSTRUCTION OF RIVERBANK PROTECTION ALONG SINUCALAN RIVER, BARANGAY POGO CHICO,DAGUPAN CITY, PANGAS25AH0007 · ₱48,509,834.41 · mapped
- CONSTRUCTION OF SLOPE PROTECTION WORKS ALONG ANGALACAN RIVER, PIAS, MAPANDAN, PANGASINAN23AJ0027 · ₱48,004,256.10 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG INGALERA RIVER, BARANGAY INERANGAN, SAN CARLOS CITY, PANGASINAN25AJ0119 · ₱47,240,900.35 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG INGALERA RIVER, BARANGAY TALOSPATANG, MALASIQUI, PANGASINAN25AJ0122 · ₱47,235,988.89 · mapped
- CONSTRUCTION OF PROTECTION WORKS ALONG ANGALACAN RIVER, BRGY. BALOLING, MAPANDAN, PANGASINAN20AJ0037 · ₱47,110,690.84 · mapped
- CONSTRUCTION OF PROTECTION WORKS ALONG INGALERA RIVER, BRGY. AGDAO, MALASIQUI, PANGASINAN20AJ0039 · ₱46,621,272.41 · mapped
- CONSTN OF FOUR STRY SIXTEEN CL SB (2 SCIENCE LAB, 2 COMP ROOM LAYOUT AND 4 REG WORKSHOP) LUCIANO MIL18AI0346 · ₱43,507,679.66 · mapped
- CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG INGALERA RIVER, BARANGAY CAOAYAN BOGTONG, MALASIQUI, PANGASINAN25AJ0054 · ₱42,538,779.34 · mapped
- CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG ANGALACAN RIVER BANK, BARANGAY PIAS TO BARANGAY POBLACION, MAPANDAN, PANGASINAN25AJ0055 · ₱42,534,481.50 · mapped
- CONSTN OF FOUR STRY SIXTEEN CL SB LANANPIN NHS, URDANETA CITY, PANGASINAN18AI0262 · ₱40,251,938.47 · mapped
- CONSTRUCTION OF RIVER BANK PROTECTION ALONG AGNO RIVER, WARDING SECTION, BAYAMBANG, PANGASINAN19AJ0056 · ₱37,945,943.02 · mapped
- REHAB./REPAIR OF AGNO RIVER BASIN F/C PROJ.ALONG BRGY. ANGARIAN,BUGALLON,PANG.STA.0+000-STA.0+46019AH0259 · ₱37,384,414.00 · mapped
- CONSTRUCTION OF FOUR (4) STOREY TWELVE (12) CLASSROOM SCHOOL BUILDING UMINGAN CENTRAL SCHOOL AT UMINGAN, PANGASINAN20AI0085 · ₱33,808,002.13 · mapped
- ROAD WIDENING ON SECONDARY ROADS ALONG CAMILING-WAWA-BAYAMBANG-MALASIQUI-STA. BARBARA RD, K0185+281-K0186+113, MALASIQUI, PANGASINAN21AJ0052 · ₱33,319,813.76 · mapped
- CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG INGALERA RIVER, BARANGAY ICAN, MALASIQUI, PANGASINAN25AJ0085 · ₱33,082,368.21 · mapped
- CONSTRUCTION OF SLOPE PROTECTION WORKS ALONG AGNO RIVER, AT BRGY. MANAMBONG NORTE, BAYAMBANG, PANGASINAN18AJ0071 · ₱32,421,812.78 · mapped
- CONSTRUCTION OF RIVER BANK PROTECTION ALONG INGALERA RIVER, ANO SECTION, SAN CARLOS CITY, PANGASINAN19AJ0044 · ₱30,487,619.62 · mapped
- CONSTRUCTION OF 3 STOREY,12 CL S/B AT LUCAO ELEM. SCHOOL, DAGUPAN CITY, PANGASINAN17AH0315 · ₱28,413,308.79 · mapped
- CONST'N. OF 3 STOREY,12 CL S/B (K TO 10)AT WEST CENTRAL ELEM.SCHOOL II,DAGUPAN CITY,PANGASINAN17AH0316 · ₱28,369,370.69 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG AGNO RIVER, CATURAY SECTION, BAYAMBANG, PANGASINAN25AJ0078 · ₱28,350,368.74 · mapped
- CONSTRUCTION OF RIVERBANK PROTECTION AT BRGY. POBLACION, MANAOAG, PANGASINAN17AH0073 · ₱27,930,000.00
- CONSTRUCTION OF RIVERBANK PROTECTION ALONG ANGALACAN RIVER AT BRGY.POBLACION, MANAOAG,PANGASINAN18AH0089 · ₱27,915,300.00 · mapped
- CONSTRUCTION OF RIVER BANK PROTECTION ALONG AGNO RIVER, BRGY. WAIG, MALASIQUI, PANGASINAN17AJ0023 · ₱25,766,138.18
- CONST'N. OF 3 STOREY,9 CLASSROOM SCHOOL BUILDING AT SABANGAN ELEM.SCHOOL,DAGUPAN CITY, PANGASINAN17AH0314 · ₱23,670,730.34 · mapped
- CONST'N.OF 3 STOREY,9 CLASSROOM S/B (K TO 10) AT PANTAL ELEM. SCHOOL,DAGUPAN CITY, PANGASINAN17AH0304 · ₱23,646,440.57 · mapped
- CONST'N. OF 3 STOREY,9 CL, S/B (K TO 10)AT GEN.GREGORIO DEL PILAR ELEM.SCHOOL,DAGUPAN CITY,PANGASINA17AH0310 · ₱23,624,831.55 · mapped
- CONSTRUCTION OF ACCESS ROAD LEADING TO TONDALIGAN BEACH, DAGUPAN CITY, PANGASINAN21A00177 · ₱23,024,357.94 · mapped
- CONSTN OF FOUR STRY EIGHT CL SB (2 SCIENCE LAB AND 2 COMP ROOM LAYOUT) LUCIANO MILLAN NHS, ASINGAN,18AI0347 · ₱21,837,004.41 · mapped
- CONST'N.OF MODIFIED STANDARD TWO(2)STOREY,EIGHT(8)CL,S/B AT TALOGTOG E/S MANGALDAN,PANGASINAN20AH0134 · ₱20,017,630.50 · mapped
- CONST'N.OF MODIFIED STANDARD 2-STOREY 8 CL,S/B IN DAVID NATIONAL HS, BRGY.DAVID, MANGALDAN, PANGASIN24AH0173 · ₱19,897,883.19 · mapped
- CONSTRUCTION OF OPEN DRAINAGE CANAL, BRGY. NIBALIW MAGLIBA, SAN FABIAN, PANGASINAN24AH0116 · ₱19,797,060.55 · mapped
- CONSTRUCTION OF BOULDER BANK PROTECTION ALONG INAMOTAN-TULONG WATERWAYS,INAMOTAN,MANAOAG, PANGASINAN16AH0041 · ₱19,404,007.50 · mapped
- CONST'N. OF BOULDER BANK PROTECTION ALONG ALORAGAT WATERWAYS BISAL, MANAOAG,PANGASINAN16AH0034 · ₱19,400,996.39 · mapped
- CONSTRUCTION OF BOULDER BANK PROTECTION ALONG ANGALACAN WATERWAYS LICSI, MANAOAG, PANGASINAN16AH0097 · ₱19,241,208.71 · mapped
- CONSTRUCTION OF BOULDER BANK PROTECTION ALONG ANGALACAN WATERWAYS,POBLACION, MANAOAG,PANGASINAN16AH0142 · ₱19,208,000.00 · mapped
- CONST'N.OF TWO(2)STOREY-EIGHT(8) CLASSROOM SB AT SANITAS ELEM.SCHOOL, SAN FABIAN,PANGASINAN19AH0231 · ₱18,638,119.58 · mapped
- CONSTRUCTION OF RIVER FLOOD CONTROL AT BRGY. BARITAO, MANAOAG, PANGASINAN18AH0090 · ₱18,620,000.00 · mapped
- CONS'TN. OF RIVER FLOOD CONTROL AT BRGY.LIPIT NORTE, MANAOAG,PANGASINAN17AH0044 · ₱18,620,000.00
- CONSTRUCTION/REHABILITATION OF RIVER BANK PROTECTION AT BRGY. INLAMBO,MUNICIPALITY OF MANGALDAN,PANG17AH0093 · ₱18,620,000.00
- CONST'N. OF RIVER FLOOD CONTROL AT BRGY.BARITAO,MANAOAG, PANGASINAN17AH0045 · ₱18,618,040.00
- CONST'N. OF TWO(2)STOREY-EIGHT(8) CLASSROOM SB AT BIGBIGA ELEM. SCHOOL, SAN FABIAN, PANGASINAN19AH0235 · ₱18,611,860.60 · mapped
- CONSTRUCTION OF FOUR(4)STOREY,EIGHT(8)CL,S/B(2SCI LAB,2ICT)AT GUEGUESANGEN INTEGRATED SCHOOL,MANGALD18AH0284 · ₱18,401,715.00 · mapped
- CONST'N.OF THREE(3) STOREY,NINE(9)CL,S/B AT GUEGUESANGEN INTEGRATED SCHOOL,MANGALDAN,PANGASINAN16AH0170 · ₱15,301,647.90 · mapped
- CONSTRUCTION OF BRGY. BINDAY FMR, BRGY. BINDAY, SAN FABIAN, PANGASINAN22AH0151 · ₱14,924,000.00 · mapped
- CONCRETING OF BRGY. SALAAN FMR,BRGY. SALAAN,MANGALDAN,PANGASINAN25AH0174 · ₱14,454,865.25 · mapped
- CONSTRUCTION OF ROAD, BRGY. PALAPAD, SAN FABIAN, PANGASINAN25AH0138 · ₱14,374,750.58 · mapped
- CONCRETING OF BRGY. LANAS TO BRGY. SALAY FARM-TO-MARKET ROAD,MANGALDAN,PANGASINAN21AH0149 · ₱14,133,983.09 · mapped
- CONSTRUCTION OF SLOPE PROTECTION, BRGY. ICAN, MALASIQUI, PANGASINAN23AJ0141 · ₱14,091,391.81 · mapped
Equipment & capacity
PCAB license
No PCAB license is linked to this record. It may be a joint venture, a foreign firm, or a name we could not match. Search PCAB.
Government performance ratings (CPES)
No CPES evaluation lists this contractor's PCAB license in the GPPB releases we loaded (34th–41st).
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →