BUILDERS EXPONENT EMPIRE CORP FORMERLY: BUILDERS EXPONENT ENT is listed as a company organization in Philippine public procurement records on this site, with 103 linked DPWH project(s) totaling about ₱1,575,375,903.64. Recorded delivery grade C (from public DPWH project records — not a finding of wrongdoing).
BUILDERS EXPONENT EMPIRE CORP FORMERLY: BUILDERS EXPONENT ENT
CGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 103
- Total value
- ₱1,575,375,903.64
- Published flags
- 1
- Region
- Bataan 1st DEO · Region III
Online presence
Google Maps: Builders Exponent Empire Corp.Google Maps, 2026-10-22
RG98+HF5, Talimundoc, Orani, Bataan
Public Record Grade
A transparent, data-derived summary of reported public records for BUILDERS EXPONENT EMPIRE CORP FORMERLY: BUILDERS EXPONENT ENT — not an accusation or finding of wrongdoing.
Score: 77.10 / 100 · Projects in sample: 103 · As of Oct 28, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 53.2/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 53.2
- lateCompletedProjects
- 4
- onTimeCompletedProjects
- 64
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 96
- pastTargetOngoingProjects
- 28
- undatedCompletedProjectsExcluded
- 6
- Termination rate
Component score: 100/100 · Weight: 21%
- totalProjects
- 103
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 103
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 99.7/100 · Weight: 11%
- projects
- 103
- componentScore
- 99.7
- flagsPerProject
- 0.01
- publishedV2Flags
- 1
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 103
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 44 of 75 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- NETWORK DEVELOPMENT-ROAD WIDENING-SECONDARY ROADS-ROMAN EXPRESSWAY, BATAAN 1ST LEGISLATIVE DISTRICT20C00004 · ₱125,441,089.91 · mapped
- BRIDGE PROGRAM - REPLACEMENT OF WEAK BRIDGES - SAMAL BR. (B00055LZ) ALONG ROMAN EXPRESSWAY, SAMAL, BATAAN23CA0032 · ₱96,499,998.27 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM -SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - REHABILITATION OF ROAD, SAN JUAN VICIN25CA0063 · ₱95,502,700.39 · mapped
- FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BAGAC RIVER (VALDEZ BRIDGE), BAGAC, BATAAN (PHASE II)24C00048 · ₱94,309,319.76 · mapped
- ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - ROMAN EXPRESSWAY - K0105+000 - K0105+650, K0111+ 000 -K0111+683, K0114+327 - K0114+915, K0116+170 -K0117+084, ORANI, SAMAL AND ABUCAY, BATAAN24CA0013 · ₱68,997,498.46 · mapped
- CONST. OF REVETMENT WALL ALONG AKLAN RIVER INCLUDING OTHER STRUCTURES/FACILITIES, MADALAG, AKLAN17GA0027 · ₱48,996,921.00
- CONVERGENCE & SPECIAL SUPPORT PROG.-CONST./IMPR'VT. OF ACCESS ROADS LEAD. TO TRADES, INDUSTRIES & ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY & TRADE INFRA. PROG.-ROLL-IT) BRGY. PITA ROAD LEAD. TO AGRO-INDUSTRY AREA, DINALUPIHAN, BATAAN23C00324 · ₱48,250,000.00 · mapped
- FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG COLO TRIBUTARY (PINULOT SECTION) TO COLO RIVER, PHASE 2-P, BRGY PINULOT, DINALUPIHAN, BATAAN24C00161 · ₱47,284,702.71 · mapped
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONST OF FLOOD MITIGATION STRUCTURE, COLO RIS, DINALUPIHAN, BATAAN25CO0008 · ₱47,284,501.40 · mapped
- ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM - 4 PROJECT ANLAYSIS) - TERTIARY ALONG GUIHULNGAN - BALOC - ISABELA ROAD, GUIHULNGAN CITY, NEGROS ORIENTAL17RF0052 · ₱45,595,899.97
- FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURE AT IBIS CIS, BRGY. IBIS, BAGAC, BATAAN25CO0011 · ₱42,556,296.80 · mapped
- BRIDGE PROGRAM - REPLACEMENT OF PERMANENT WEAK BRIDGES - AMO BR. (B01613LZ) ALONG JCT. LAYAC-BALANGA-MARIVELES PORT ROAD (PHASE 1)24C00160 · ₱40,192,141.21 · mapped
- Construction of Flood Control System (Riverbank Structure along Sinucalan and Allied River Package 2) Barangay San Jose-Pinmaludpod, Urdaneta City, Pangasinan24AI0067 · ₱29,650,972.66 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES, REHABILITATION OF LICOAN ROAD, MARIA, SIQUIJOR24HM0076 · ₱29,628,328.21 · mapped
- BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - ORANI BRIDGE 1 (B01698LZ) ALONG ROMAN EXPRESSWAYORANI, BATAAN23CA0019 · ₱28,988,397.09 · mapped
- NETWORK DEVELOPMENT PROGRAM - OFF-CARRIAGEWAY, IMPROVEMENT - SECONDARY ROADS, ROMAN EXPRESSWAY - KO102+173 - K0102+825, HERMOSA, BATAAN24CA0090 · ₱28,806,611.56 · mapped
- ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROAD - GOV JJ LINAO ROAD - BAGAC, BATAAN23C00203 · ₱26,466,090.00 · mapped
- OFF-CARRIAGEWAY IMPROVEMENT - SECONDARY ROAD - JCT LAYAC-BALANGA-MARIVELES PORT RD - KO137+-840 - KO137+-170, BATAAN 2ND DISTRICT20CB0022 · ₱25,240,880.00 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM REHABILITATION OF FLOOD CONTROL STRUCTURES ALONG PAGALANGGANG RIVER (PAGALANGGANG SECTION), STA. 001+124 TO 002+024, BARANGAY PAGALANGGANGDINALUPIHAN, BATAAN19CA0061 · ₱24,498,920.55 · mapped
- CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - TERTIARY ROADS - JCT LAYAC-BALANGA-MARIVELES PORT RD - KO122+474-KO122+723, KO122+732-KO122+967, KO133+930-KO133+1215, BATAAN 2ND DISTRICT22CB0034 · ₱21,560,000.00 · mapped
- CONCRETING OF BRGY. TACLOBAN FMR, BRGY. TACLOBAN, SIQUIJOR, SIQUIJOR23HM0112 · ₱19,900,000.00 · mapped
- BASIC INFRASTRUCTURE PROGRAM - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BINAYAN RIVER, BRGY. CAPITANGAN, ABUCAY, BATAAN (PHASE 2NV)24CA0072 · ₱19,799,999.76 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, PROVINCIAL CAPITOL GROUNDS, POLANGYUTA, SIQUIJOR, SIQUIJOR23HM0110 · ₱19,797,834.55 · mapped
- Construction/Maintenance of Flood Mitigation Structures and Drainage Systems along Labit River, Brgy. Labit West Zone 1, Urdaneta City, Pangasinan (Phase II)23AI0088 · ₱19,741,064.12 · mapped
- CONSTRUCTION OF HEADQUARTERS NAVAL STATION LEOVIGUILDO GANTIOQUI (NSLG), NETC, SAN ANTONIO, ZAMBALES22CL0023 · ₱19,596,234.05 · mapped
- CONSTRUCTION OF SCHOOL BUILDING, MABUCO ELEMENTARY SCHOOL, MABUCO ELEMENTARY SCHOOL, BARANGAY MABUCO, HERMOSA, BATAAN25CA0074 · ₱19,531,458.66 · mapped
- BASIC INFRASTRUCTURE PROGRAM - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES -CONSTRUCTION OF MULTI-PURPOSE BUILDING, ORANI DISTRICT HOSPITAL, ORANI, BATAAN25CA0060 · ₱19,385,154.22 · mapped
- CONVERGENCE ANS SPECIAL SUPPORT PROGRAM - SPECIAL ROAD FUND - MOTOR VEHICLES USER'S CHARGE (MVUC) AS PER RA 11239 - INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONGJCT LAYAC-BALANGA-MARIVELES PORT RD - MARIVELES, BATAAN25C00320 · ₱18,913,205.89 · mapped
- BASIC INFRASTRUCTURE PROGRAM - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD, BARANGAY GUGO, SAMAL, BATAANSAMAL, BATAAN23CA0020 · ₱14,849,998.15 · mapped
- WIDENING OF ROAD - NAVAL ST., CUPANG NORTH, CITY OF BALANGA, BATAAN19CB0083 · ₱14,700,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM -SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES -CONST. OF BRIDGE, PUROK 7 AND PUROK 1,25CA0048 · ₱14,391,036.95 · mapped
- CONSTRUCTION OF 2-STOREY 4-CLASSROOM SCHOOL BUILDING IN BACAG CENTRAL SCHOOL, BARANGAY BACAG, VILLASIS, PANGASINAN24AI0214 · ₱14,195,588.87 · mapped
- REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - 7TH AVE - CHAINAGE 0 - CHAINAGE 428, BATAAN 2ND DISTRICT22CB0030 · ₱13,944,420.00 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION/IMPROVEMENT OF PENTOR-BALSIK RIVER (TORRES SECTION), DINALUPIHAN, BATAAN17CA0018 · ₱13,690,110.00 · mapped
- BASIC INFRASTRUCTURE PROGRAM -ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES -REPLACEMENT OF ROMULO BRIDGE, SAN PEDROHERMOSA, BATAAN23CA0018 · ₱11,879,963.19 · mapped
- FLOOD MANAGEMENT SERVICES, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURES, SLOPE PROTECTION, PANIQUIAN RIVER, MARIVELES, BATAAN17CB0085 · ₱11,160,201.27
- PREVENTIVE MAINTENANCE - PRIMARY ROADS JOSE ABAD SANTOS AVE (JASA), K0122+493 - K0122+731, OLONGAPO CITY23CM0002 · ₱10,669,201.65 · mapped
- BASIC INFRASTRUCTURE PROGRAM - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS CONNECTING TO INDIGENOUS PEOPLE (IP) COMMUNITIES - CONSTRUCTION OF ROAD PAVEMENT AT ORANI INTEGRATED SCHOOL, MULAWINORANI, BATAAN23CA0010 · ₱9,899,997.69 · mapped
- CONSTRUCTION OF SAIMSIM BRIDGE CALAMBA CITY, LAGUNA24DI0193 · ₱9,721,799.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROG. - BASIC INFRASTRUCTURE PROG. - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHAB. OF FLOOD MITIGATION STRUCTURE ALONG SAGUING RIVER (TRIBUTARY TO COLO RIVER) DINALUPIHAN, BAT.25C00177 · ₱9,702,201.01 · mapped
- BASIC INFRASTRUCTURE PROGRAM - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - REHABILITATION OF MULTI-PURPOSE BUILDING, BARANGAY BANGKAL, ABUCAY, BATAAN23CA0025 · ₱9,696,147.04 · mapped
- LOCAL INFRASTRUCTURE PROGRAM-FLOOD CONTROL AND DRAINAGE-FLOOD CONTROL STRUCTURES/FACILITIES, RIPRAPPING, WIDENING AND DESILTING OF SALIAN RIVER, BARANGAY SALIANABUCAY, BATAAN17CA0031 · ₱9,506,000.00
- PREVENTIVE MAINTENANCE - PRIMARY ROADS JOSE ABAD SANTOS AVE (JASA), K0119+022 - K0119+235, OLONGAPO CITY23CM0001 · ₱9,393,280.71 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP), CONSTRUCTION/ IMPROVEMENT OF ACCESSS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP), SAN ANTONIO - CANTABON - BANDILAAN ROAD LEADING TO VARIOUS CANTABON CAVE, HE22HM0030 · ₱8,330,000.00 · mapped
- ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - TABACAN POBLACION ROAD, K0102+(-127)-K0102+047, K0102+349-K0102+593DINALUPIHAN, BATAAN21CA0018 · ₱8,110,478.97 · mapped
- BASIC INFRASTRUCTURE PROGRAM - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES- CONSTRUCTION OF MULTI-PURPOSE BUILDING IN BARANGAY BALSIK, HERMOSA, BATAAN23CA0035 · ₱7,919,997.82 · mapped
- BASIC INFRASTRUCTURE PROGRAM (BIP)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - RECONSTRUCTION OF MULAWIN - BAYAN BRIDGE, ORANI, BATAAN22CA0058 · ₱7,919,950.09 · mapped
- ASSET PRESERVATION OF NATIONAL ROADS CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURES, SLOPE PROTECTION, LAMAO RIVER, LIMAY, BATAAN17CB0048 · ₱7,840,002.36
- FLOOD MANAGEMENT SERVICES CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURES, SLOPE PROTECTION, UMANGOL RIVER, BAGAC, BATAAN17CB0049 · ₱7,839,718.68
- LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF TWO (2) STOREY-FOUR (4) CLASSROOM SCHOOL BUILDING, ADAMSON ELEMENTARY SCHOOLSAMAL, BATAAN18CA0005 · ₱6,722,092.00 · mapped
Equipment & capacity
PCAB license
- License no.
- 39617
- Category
- B · Medium A
- Minimum net worth for this category
- ₱10,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱150M
- License valid until
- Nov 4, 2027
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 39617); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
6 evaluations listed across 3 GPPB CPES releases; average final rating 91.5% over 1 rated project; 6 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Oct 17, 2024 | DPWH (JV) | ₱385,999,637.00 | On-going | 94.0% | — | 39th (rev), p. 20 |
| Jul 26, 2024 | DPWH | ₱29,628,328.00 | On-going | 95.3% | — | 38th, p. 42 |
| Mar 15, 2024 | DPWH (JV) | ₱96,500,075.00 | On-going | 81.5% | — | 37th, p. 78 |
| Nov 17, 2023 | DPWH | ₱4,950,000.00 | Completed | 91.5% | 91.5% | 37th, p. 19 |
| Nov 16, 2023 | DPWH (JV) | ₱94,541,190.00 | On-going | 93.5% | — | 37th, p. 78 |
| Nov 14, 2023 | DPWH (JV) | ₱96,499,998.00 | On-going | 93.5% | — | 37th, p. 78 |
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →