MARBEL DYNAMIC BUILDERS is listed as a company organization in Philippine public procurement records on this site, with 16 linked DPWH project(s) totaling about ₱51,810,703.97. Recorded delivery grade C (from public DPWH project records — not a finding of wrongdoing).
MARBEL DYNAMIC BUILDERS
CGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 16
- Total value
- ₱51,810,703.97
- Published flags
- 0
- Region
- South Cotabato 2nd DEO · Region XII
Online presence
Google Maps: Marbel Dynamic Builders★ 2.8 (4 reviews)Google Maps, 2026-10-22
9506 Albert Morrow St, Zone I, Koronadal, South Cotabato
Licensed officers (PCAB)
- LEOPOLDO LAGAMAYO CHOMI · Authorized Managing Officer (PCAB license 06150) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for MARBEL DYNAMIC BUILDERS — not an accusation or finding of wrongdoing.
Score: 76.00 / 100 · Projects in sample: 16 · As of Oct 22, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 61.8/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 61.8
- lateCompletedProjects
- 9
- onTimeCompletedProjects
- 6
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 16
- pastTargetOngoingProjects
- 1
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 16
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 16
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 16
- componentScore
- —
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 16
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
11 geotagged projects — Open full map
- CONST. OF SENIOR HIGH SCHOOL CLASSROOMS 2 STOREY 8 CL SB. AT MALTANA NHS., BRGY. MALTANA, TAMPAKAN, SOUTH COTABATO.16MB0127 · ₱10,765,424.11
- CONSTRUCTION OF MULTI PURPOSE BUILDING (BARANGAY HEALTH CENTER) PUROK SALANGA, BARANGAY MORALES, KORONADAL CITY25MG0095 · ₱4,930,228.83 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. TINONGCOP, TANTANGAN, SOUTH COTABATO24MG0086 · ₱4,915,735.12 · mapped
- CONSTRUCTION OF TECHVOC WORKSHOP BUILDING/LABORATORIES FOR SENIOR HIGH SCHOOL AT GENERAL SANTOS CITY NATIONAL SECONDARY SCHOOL OF ARTS AND TRADES, BRGY. LAGAO, GENERAL SANTOS CITY16MB0051 · ₱4,832,668.38
- CLUSTER I-A.CONSTRUCTION OF RAINWATER COLLECTOR SYSTEM (RWCS), KIANTAY ELEMENTARY SCHOOL, SITIO KIANTAY, BRGY. UPPER SEPAKA, SURALLAH, SOUTH COTABATO B.CONSTRUCTION OF RAINWATER COLLECTOR SYSTEM (RWCS), NEW TUPI IS, SITIO NEW TUPI, BRGY. NED, LAKE SEBU, S25MG0110 · ₱2,584,665.26 · mapped
- CONSTRUCTION OF NEW BARANGAY GYM, PUROK SAN ISIDRO, BRGY. SAN JOSE, KORONADAL CITY, SOUTH COTABATO18MG0038 · ₱2,464,827.73 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, LTO REGIONAL OFFICE, BRGY. STA. CRUZ, KORONADAL CITY, SOUTH COTABATO20MG0075 · ₱2,464,407.78 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING IN DESAWO ELEMENTARY SCHOOL, BARANGAY DESAWO, T'BOLI, SOUTH COTABATO20MG0001 · ₱2,458,613.18 · mapped
- CONSTRUCTION OF TECHVOC FACILITIES/WORKSHOP BUILDINGS AT TAMPAKAN NATIONAL H/S, TAMPAKAN, SOUTH COTABATO16MB0112 · ₱2,405,655.45
- CONSTRUCTION OF TECHVOC FACILITIES/WORKSHOP BUILDINGS AT MALTANA NATIONAL HIGH SCHOOL, TAMPAKAN, SOUTH COTABATO16MB0109 · ₱2,405,655.45
- CONSTRUCTION OF MULTI-PURPOSED BUILDING, BARANGAY POBLACION, TUPI, SOUTH COTABATO16MB0016 · ₱1,964,953.14
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (OPEN COURT MUNICIPAL GYM WITH BLEACHERS AND CANOPY), BARANGAY LIBERTAD, SURALLAH, SOUTH COTABATO21MG0036 · ₱1,963,447.25 · mapped
- CONSTRUCTION OF PUNONG GRANDE BHS, BRGY. PUNONG GRANDE, BANGA, SOUTH COTABATO18MG0132 · ₱1,936,694.60 · mapped
- CONSTRUCTION OF IMPROGO BHS, BRGY. IMPROGO, BANGA, SOUTH COTABATO18MG0133 · ₱1,926,813.50 · mapped
- CONSTRUCTION OF ZONE IV BHS WITH BIRTHING FACILITY, BRGY. ZONE IV, KORONADAL CITY, SOUTH COTABATO18MG0142 · ₱1,916,932.39 · mapped
- REPAIR/COMPLETION OF MULTI-PURPOSE BUILDING (BLEACHERS/STAGE OF GYM), T'BOLI, SOUTH COTABATO18MG0102 · ₱1,873,981.80 · mapped
Across government
- DOH Goods & services: 6 awards · ₱2,548,460.00
- Construction Materials
- Hardware and Construction Supplies
- Pin Light LED Buld 15WATTS etc.
- Hardware Materials
- Construction Supplies
- 2x6x12' Mahogany Lumber, etc.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
