KING EIGHT BUILDERS AND SUPPLY is listed as a company organization in Philippine public procurement records on this site, with 59 linked DPWH project(s) totaling about ₱2,378,027,128.97. Recorded delivery grade C (from public DPWH project records — not a finding of wrongdoing).
KING EIGHT BUILDERS AND SUPPLY
CGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 59
- Total value
- ₱2,378,027,128.97
- Published flags
- 0
- Region
- Metro Manila 3rd DEO · National Capital Region
Licensed officers (PCAB)
- Ma. Lourdes Aven Senar · Authorized Managing Officer (PCAB license 37325) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for KING EIGHT BUILDERS AND SUPPLY — not an accusation or finding of wrongdoing.
Score: 73.60 / 100 · Projects in sample: 59 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 51.4/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 51.4
- lateCompletedProjects
- 9
- onTimeCompletedProjects
- 32
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 56
- pastTargetOngoingProjects
- 15
- undatedCompletedProjectsExcluded
- 2
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 59
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 59
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 59
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 59
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 50 of 59 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- CONSTRUCTION OF PUP ACADEMIC BUILDING (PHASE 4), CALOOCAN CITY CAMPUS, CALOOCAN CITY24OD0208 · ₱173,903,462.26 · mapped
- CONSTRUCTION (COMPLETION) PUP NORTH CALOOCAN CITY CAMPUS ACADEMIC BUILDING INCLUDING GROUND IMPROVEMENT (PHASE 6), BRGY. 168, CALOOCAN CITY25OD0360 · ₱139,250,739.60 · mapped
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, PUP NORTH CALOOCAN CITY CAMPUS ACADEMIC BUILDING (PHASE 3), CALOOCAN CITY24OD0201 · ₱97,501,783.32 · mapped
- CONSTRUCTION OF FLOOD CONTROL WALL ALONG THE BANKS OF CREEKS, BARANGAY 171 TIERA NOVA, CALOOCAN CITY25OD0043 · ₱89,839,600.64 · mapped
- CONSTRUCTION OF FLOOD CONTROL WALL ALONG THE BANKS OF CREEKS, PHASE 8, BARANGAY 176, CALOOCAN CITY25OD0018 · ₱89,834,806.92 · mapped
- Construction of Flood Control Wall along the Banks of Creeks, Barangay 176 Phase 9, Caloocan City24OD0020 · ₱89,565,038.74 · mapped
- Construction of Flood Control Structure along the Banks of Creeks, Barangay 160, Caloocan City (Phase 2)23OD0228 · ₱84,678,409.32 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY LITTLE BAGUIO, SAN JUAN CITY PHASE 324OB0268 · ₱78,011,497.09 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, NINOY AQUINO PARKS AND WILDLIFE, BARANGAY VASRA, QUEZON CITY24OF0170 · ₱68,606,669.95 · mapped
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BRGY. TIBAGAN, SAN JUAN CITY PHASE III24OB0152 · ₱68,260,348.10 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY SAN PERFECTO, SAN JUAN CITY25OB0103 · ₱65,774,166.40 · mapped
- Construction of Flood Mitigation Structure (Installation of Automatic Trash Screen) at Maya Creek, Barangay Rizal, Makati City23OC0016 · ₱61,469,424.33 · mapped
- CONSTRUCTION/IMPROVEMENT OF FLOOD CONTROL PROJECT AND REHABILITATION OF WATERWAYS ALONG SAN VICENTE, MALOLOS, BULACAN23CC0574 · ₱57,883,314.69 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. BATIS, SAN JUAN CITY21OB0009 · ₱52,013,151.72 · mapped
- CONSTRUCTION OF FOUR (4) STOREY SIXTEEN (16) CLASSROOM SCHOOL BUILDING AT ROSA L. SUSANO E/S, QUEZON CITY20OF0317 · ₱50,187,746.80 · mapped
- REHABILITATION/CONSTRUCTION OF SLOPE PROTECTION ALONG TAGUIG RIVER EAST BANK (PACKAGE II), BARANGAY USUSAN, TAGUIG CITY21OB0103 · ₱49,000,000.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, SAN JUAN NATIONAL HIGH SCHOOL, BARANGAY CORAZON DE JESUS, SAN JUAN CITY25OB0108 · ₱48,748,386.63 · mapped
- CONCTRUCTION OF MULTI-PURPOSE BUILDING AT BRGY. 176, BAGONG SILANG, CALOOCAN CITY (PHASE 1)23OD0169 · ₱48,625,134.01 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ARANAN CREEK, QUEZON CITY25OF0005 · ₱48,509,571.56 · mapped
- CONSTRUCTION OF COMELEC BUILDING, PHASE II, CALOOCAN CITY24OD0237 · ₱48,246,814.67 · mapped
- CONSTRUCTION OF REVETMENT WALL ALONG BALISAMPAN CREEK, DISTRICT II, MAKATI CITY, METRO MANILA25OC0114 · ₱48,019,361.80 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, PHASE 6, BARANGAY TAÑONG TO BARANGAY DAMPALIT, MALABON CITY25OA0009 · ₱47,983,899.44 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING IN BRGY. STA. TERESITA, QUEZON CITY23OF0189 · ₱47,767,321.80 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (SPORTS CENTER), BARANGAY RIVERA, SAN JUAN CITY21OB0017 · ₱47,524,334.59 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BARANGAY 390 ZONE 40, MANILA CITY22OE0114 · ₱46,033,719.72 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. TIBAGAN, SAN JUAN CITY23OB0314 · ₱39,904,581.89 · mapped
- Construction of Box Culvert with Revetment along Coastal Road (San Dionisio Section, Phase II), Parañaque City23OC0087 · ₱39,180,318.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, PCK BRGY. 176 CALOOCAN CITY (PHASE 2)23OD0171 · ₱38,904,104.11 · mapped
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY BATIS, SAN JUAN CITY24OB0142 · ₱38,605,729.55 · mapped
- REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS MACARTHUR H-WAY - K0017 + 014 - K0017 + 21625OD0125 · ₱38,584,925.72 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (PHASE I), BRGY. MALINTA, VALENZUELA CITY20OD0126 · ₱38,217,789.63 · mapped
- CONSTRUCTION OF FLOOD MITIGATION FACILITY, TONGCO CREEK, BARANGAY MAYSILO, MALABON CITY25OA0024 · ₱33,255,756.57 · mapped
- Construction of Slope Protection Structure, Barangay Lubo, Jala-jala, Rizal22DO0028 · ₱29,700,000.00 · mapped
- CONSTRUCTION OF FLOOD CONTROL WALL ALONG BANKS OF CREEKS, DEL MUNDO, BRGY. 167, CALOOCAN CITY25OD0130 · ₱28,958,289.87 · mapped
- CONSTRUCTION OF FLOOD CONTROL WALL ALONG BANKS OF CREEK, NORTH OLYMPUS, BRGY. 172, CALOOCAN CITY25OD0266 · ₱28,941,731.80 · mapped
- CONSTRUCTION OF ROADS AND DRAINAGE SYSTEMS ALONG BARANGAY 173, CALOOCAN CITY24OD0324 · ₱28,913,151.34 · mapped
- REHABILITATION/RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS PRIMARY ROADS - EPIFANIO DELOS SANTOS AVE (EDSA) (S03361LZ) K0029+(-371) K0029+(-124)24O00064 · ₱28,724,728.20 · mapped
- IMPROVEMENT OF ROAD AND DRAINAGE SYSTEM ALONG CAIMITO ROAD, BRGY. 79, CONNECTING TO SAMSON ROAD & MACARTHUR HIGHWAY (PHASE 2), CALOOCAN CITY24OD0107 · ₱24,055,320.39 · mapped
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BRGY. BATIS, SAN JUAN CITY22OB0006 · ₱23,642,261.40 · mapped
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BRGY. TIBAGAN, SAN JUAN CITY PHASE II24OB0144 · ₱19,502,804.64 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BARANGAY SAN DIONISIO,PARAÑAQUE CITY, METRO MANILA25OC0136 · ₱19,403,464.53 · mapped
- CONSTRUCTION OF ROAD AND DRAINAGE ALONG MAGNOLIA ROAD, BRGY. 174 (PHASE 3), CALOOCAN CITY24OD0090 · ₱19,219,819.33 · mapped
- CONSTRUCTION OF ROADS AND DRAINAGE SYSTEMS ALONG LIRIO RD (PHASE 3), BARANGAY 174, CALOOCAN CITY25OD0265 · ₱18,909,980.45 · mapped
- CONSTRUCTION/COMPLETION OF MULTI-PURPOSE BUILDING, KABAYANAN ELEMENTARY SCHOOL, SAN JUAN CITY19OB0329 · ₱11,404,110.33 · mapped
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY ERMITAÑO, SAN JUAN CITY25OB0098 · ₱9,751,347.01 · mapped
- REHABILITATION OF ROAD, BARANGAY SANTOR, CITY OF MALOLOS, BULACAN25CC0452 · ₱9,600,864.63 · mapped
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (PHASE 3), BARANGAY 152, CALOOCAN CITY25OD0349 · ₱9,580,647.51 · mapped
- CONSTRUCTION OF ROADS AND DRAINAGE SYSTEMS ALONG BARANGAY 175, CALOOCAN CITY (PHASE 2)25OD0343 · ₱9,461,623.56 · mapped
- REHABILITATION OF LOCAL ROAD, CELIA ST., BRGY. TINAJEROS, MALABON CITY20OA0045 · ₱6,815,295.01 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (PHASE II), BRGY. BATASAN HILLS, QUEZON CITY20OF0211 · ₱5,761,800.00 · mapped
Equipment & capacity
PCAB license
- License no.
- 37325
- Category
- A · Medium B
- Minimum net worth for this category
- ₱30,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱300M
- License valid until
- Dec 10, 2027
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 37325); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
5 evaluations listed across 4 GPPB CPES releases; average final rating 95.1% over 2 rated projects; 4 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Jun 27, 2025 | DPWH | ₱79,200,000.00 | Completed | 95.3% | 96.7% | 40th, p. 177 |
| Oct 14, 2024 | DPWH | ₱78,011,497.00 | On-going | 97.3% | — | 39th (rev), p. 115 |
| Nov 16, 2023 | DPWH (JV) | ₱44,099,070.00 | On-going | 83.8% | — | 37th, p. 117 |
| Mar 31, 2022 | DPWH | ₱39,200,000.00 | Completed | — | — | 34th, p. 47 |
| Jun 6, 2019 | DPWH (JV) | ₱46,756,330.00 | Completed | 93.4% | 93.4% | 40th, p. 239 |
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
- DPWH Infrastructure: 67 awards · ₱2,829,910,028.60
- City of Mandaluyong Infrastructure: 6 awards · ₱189,722,051.61
- City of Parañaque Infrastructure: 11 awards · ₱130,699,358.61
- City of Quezon Infrastructure: 3 awards · ₱126,142,348.55
- City of Makati Infrastructure: 22 awards · ₱118,431,232.25
- City of Caloocan Infrastructure: 14 awards · ₱80,825,274.07
- City of Angeles Infrastructure: 7 awards · ₱41,209,720.93
- Philippine Ports Authority Infrastructure: 1 award · ₱23,900,000.01
- UP Infrastructure: 2 awards · ₱12,175,849.55
- Municipality of Bombon , Camarines Sur Infrastructure: 1 award · ₱1,996,925.33
- 25OD0360₱139,250,739.60· 2025-09-07· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (METRO MANILA 3RD ED
- 25OD0349₱9,580,647.51· 2025-06-16· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (METRO MANILA 3RD ED
- 25OD0130₱28,958,289.87· 2025-05-19· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (METRO MANILA 3RD ED
- 25OD0265₱18,909,980.45· 2025-05-19· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (METRO MANILA 3RD ED
- Construction of Multi-Purpose Building₱19,403,464.53· 2025-05-19· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - METRO MANILA 2ND D
- 25OD0266₱28,941,731.80· 2025-05-19· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (METRO MANILA 3RD ED
- 25CC0452 - Rehabilitation of Road, Barangay Santor
- 25OD0343₱9,461,623.56· 2025-05-06· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (METRO MANILA 3RD ED
- 25OD0125₱38,584,925.72· 2025-03-27· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (METRO MANILA 3RD ED
- Construction of Revetment Wall₱48,019,361.80· 2025-03-19· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - METRO MANILA 2ND D
- 25OA0024₱33,255,756.57· 2025-02-14· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - MALABON-NAVOTAS SD
- 25OF0005 - CONSTRUCTION OF FLOOD CONTROL STRUCTURE₱48,509,571.56· 2025-02-13· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - QUEZON CITY 1ST ED
- 25OA0009₱47,983,899.44· 2025-02-12· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - MALABON-NAVOTAS SD
- 25OD0043₱89,839,600.64· 2025-02-10· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (METRO MANILA 3RD ED
- 25OD0018₱89,834,806.92· 2025-02-10· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (METRO MANILA 3RD ED
- Contract ID No. 25OB0103 - Construction of Multi₱65,774,166.40· 2025-02-10· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - METRO MANILA 1ST E
- Contract ID No. 25OB0098 - Construction (Completi₱9,751,347.01· 2025-02-06· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - METRO MANILA 1ST E
- Contract ID No. 25OB0108 - Construction of Multi₱48,748,386.63· 2025-02-06· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - METRO MANILA 1ST E
- 24OD0324₱28,913,151.34· 2024-12-23· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (METRO MANILA 3RD ED
- 24OD0327₱48,159,635.01· 2024-12-23· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (METRO MANILA 3RD ED
- 24O00064
- 24OF0170 - CONSTRUCTION OF MULTI-PURPOSE BUILDING,₱68,606,669.95· 2024-04-23· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - QUEZON CITY 1ST ED
- 24OD0208₱173,903,462.26· 2024-04-18· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (METRO MANILA 3RD ED
- 24OD0201₱97,501,783.32· 2024-04-18· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (METRO MANILA 3RD ED
- 24OD0237₱48,753,847.05· 2024-04-18· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (METRO MANILA 3RD ED
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →