ZAMBO J A BUILDERS is listed as a company organization in Philippine public procurement records on this site, with 12 linked DPWH project(s) totaling about ₱256,103,553.85. Recorded delivery grade C (from public DPWH project records — not a finding of wrongdoing).
ZAMBO J A BUILDERS
CGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 12
- Total value
- ₱256,103,553.85
- Published flags
- 0
- Region
- Zamboanga City 2nd DEO · Region IX
Public Record Grade
A transparent, data-derived summary of reported public records for ZAMBO J A BUILDERS — not an accusation or finding of wrongdoing.
Score: 71.80 / 100 · Projects in sample: 12 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 50/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 50
- lateCompletedProjects
- 2
- onTimeCompletedProjects
- 6
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 11
- pastTargetOngoingProjects
- 3
- undatedCompletedProjectsExcluded
- 1
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 12
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 1.1
- componentScore
- 100
- projectsWithAbcAndCost
- 12
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 12
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 12
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
12 geotagged projects — Open full map · Download projects (CSV)
- CONSTRUCTION OF MANGUSU - MUTI COASTAL DIVERSION ROAD, ZAMBOANGA CITY, STA. 6+600.00 - STA. 7+190.00, PACKAGE 525J00238 · ₱93,603,007.73 · mapped
- CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - BUENAVISTA - BOLONG BYPASS ROAD, PACKAGE 13, ZAMBOANGA CITY25J00092 · ₱53,242,057.32 · mapped
- REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS, SIOCON-SIRAWAI-SIBUCO-LIMPAPA RD - K2144 + 033 - K2144 + 091, K2144 + 728 - K2144 + 752, K2144 + 902 - K2144 + 94225JJ0013 · ₱34,506,451.11 · mapped
- CONSTRUCTION/ UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS - ZAMBOANGA CITY-LABUAN-LIMPAPA RD - K1952 + 000 - K1952 + 100022JA0036 · ₱19,589,794.97 · mapped
- CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES - MAJOR C.A. FERNANDEZ ROAD (BALIWASAN CHICO) CONNECTING ZAMBOANGA CITY LABUAN-LIMPAPA ROAD (BALIWASAN SECTION) AND RT LIM BOULEVARD IN SUPPORT OF MARINE PRODUCTS,20JA0045 · ₱13,799,861.22 · mapped
- PAVING OF UNPAVED ROADS - SECONDARY ROADS,ZAMBOANGA WEST COASTAL RD (LIMPAPA- SIBUCO SECT) - K1988 + 000 - K1988 + 222, K1988 + 314 - K1988 + 54824JJ0012 · ₱12,740,000.00 · mapped
- CONCRETING OF BRGY. PROPER-SITIO GUIMBA PARANG FMR, BRGY. MALAYAL, SIBUCO, ZAMBOANGA DEL NORTE23JJ0032 · ₱11,940,000.00 · mapped
- REPAIR OF WESTERN MINDANAO COMMAND (WMC) GRANDSTAND, ZAMBOANGA CITY20JA0005 · ₱7,836,290.82 · mapped
- CONCRETING OF ROAD, ZONE IV, BRGY. VICTORIA, ZAMBOANGA CITY20JA0065 · ₱2,962,727.98 · mapped
- CONSTRUCTION OF ROAD, BARANGAY VICTORIA, ZAMBOANGA CITY21JA0090 · ₱1,976,351.97 · mapped
- CONSTRUCTION OF ROAD, BARANGAY DIVISORIA, ZAMBOANGA CITY21JA0067 · ₱1,954,073.94 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (EOD LABORATORY BUILDING), MARINE BARRACKS, ARTURO ASUNCIO, CABATANGAN, ZAMBOANGA CITY20JA0052 · ₱1,952,936.79 · mapped
Equipment & capacity
PCAB license
No PCAB license is linked to this record. It may be a joint venture, a foreign firm, or a name we could not match. Search PCAB.
Government performance ratings (CPES)
No CPES evaluation lists this contractor's PCAB license in the GPPB releases we loaded (34th–41st).
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →