ADAMANT DEVELOPMENT CORP is listed as a company organization in Philippine public procurement records on this site, with 20 linked DPWH project(s) totaling about ₱364,426,326.00. Recorded delivery grade D (from public DPWH project records — not a finding of wrongdoing).
ADAMANT DEVELOPMENT CORP
DGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 20
- Total value
- ₱364,426,326.00
- Published flags
- 0
- Region
- Cebu 7th DEO · Region VII
Online presence
adamant.phGoogle Maps business profile, 2026-10-22
Google Maps: Adamant Development CorporationGoogle Maps, 2026-10-22
SBTR Corner, A. Mabini, Poblacion Central, Dumanjug, 6035 Cebu
Licensed officers (PCAB)
- ALJUMER MARTINET QUIRANTE · Authorized Managing Officer (PCAB license 54359) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for ADAMANT DEVELOPMENT CORP — not an accusation or finding of wrongdoing.
Score: 65.70 / 100 · Projects in sample: 20 · As of Oct 22, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 31/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 31
- lateCompletedProjects
- 0
- onTimeCompletedProjects
- 9
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 19
- pastTargetOngoingProjects
- 10
- undatedCompletedProjectsExcluded
- 1
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 20
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 20
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 20
- componentScore
- —
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 20
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
20 geotagged projects — Open full map
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), EVACUATION CENTERS/QUARANTINE FACILITIES/PUBLIC HEALTH FACILITIES, CONSTRUCTION OF EVACUATION CENTER, PUROK IHO, SAN ROQUE, BARANGAY POBLACION, ALEGRIA, CEBU24HO0058 · ₱29,698,091.90 · mapped
- CSSP : CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS - WATER SUPPLY SYSTEM - CONSTRUCTION OF SOLAR WATER SYTEM, LAPU-LAPU CITY, CEBU23HN0202 · ₱29,388,000.00 · mapped
- LOCAL PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE / FACILITIES - NATIONAL BUILDING PROGRAM - CONSTRUCTION OF DPWH CEBU 4TH DEO MOTORPOOL BUILDING, DALAGUETE, CEBU24HG0108 · ₱29,379,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF DRAINAGE SYSTEM, PHASE 2, BARANGAY TUNGA, MOALBOAL24HO0124 · ₱28,957,000.00 · mapped
- LOCAL PROGRAM, NATIONAL BUILDING PROGRAM, BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE / FACILITIES, CONSTRUCTION OF MULTI-PURPOSE OFFICE BUILDING, DPWH REGIONAL OFFICE VII, SOUTH ROAD PROPERTIES, CEBU CITY23H00063 · ₱28,850,000.00 · mapped
- ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF DRAINAGE SYSTEM ALONG BRGY. BALABAGON, MOALBOAL, CEBU24HO0038 · ₱28,510,000.00 · mapped
- CSSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BLDG./ FACILITIES - CONST. OF DIVERSION ROAD FROM SUDTUNGGAN, BRGY. BASAK TO BRGY. GABI (PHASE 2), LAPU-LAPU CITY, CEBU24HN0065 · ₱24,470,000.00 · mapped
- LOCAL PROGRAM, NATIONAL BUILDING PROGRAM, BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE / FACILITIES, CONSTRUCTION OF MULTI-PURPOSE OFFICE BUILDING, PHASE 2, DPWH REGIONAL OFFICE VII, SOUTH ROAD PROPERTIES, CEBU CITY24H00099 · ₱24,074,999.89 · mapped
- Construction of Flood Control and Drainage System along Malingin River, Bogo City, Cebu24HD0103 · ₱19,600,000.00 · mapped
- Construction of Flood Control and Drainage System at Barangay, Gawaygaway, San Remigio, Cebu24HD0106 · ₱19,600,000.00 · mapped
- ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE PROGRAM, RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES, BANKO BANKO BRIDGE (B00461CB) ALONG SANTANDER-BARILI-TOLEDO ROAD24HO0054 · ₱19,303,000.00 · mapped
- SSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - COASTAL ROADS TO AUGMENT RESILLIENCY OF COASTAL COMMUNITIES - CONSTRUCTION OF CAUSEWAY, PHASE 2, BARANGAY MARIGONDON, LAPU-LAPU CITY, CEBU25HN0017 · ₱14,675,000.00 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF DRAINAGE SYSTEM, PHASE 3, BARANGAY TUNGA, MOALBOAL, CEBU25HO0097 · ₱14,479,500.00 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - PRIMARY ROADS, N. BACALSO AVE (CEBU SOUTH RD) - K0083+1015.40 - K0084+016.8023HG0050 · ₱14,405,991.86 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-CONSTRUCTION OF DIVERSION ROAD FROM SUDTUNGGAN, BRGY. BASAK TO BRGY. GABI, LAPU-LAPU CITY, CEBU23HN0116 · ₱9,770,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, IMPROVEMENT OF BUGHO-BALA-BUGUIL ROAD AT BARANGAY BALA, MOALBOAL, C24HO0008 · ₱7,421,610.50 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, IMPROVEMENT OF BUGHO - BALA - BUGUIL ROAD23HO0305 · ₱7,111,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - REHABILITATION OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BARANGAY LINAO, MINGLANILLA, CEBU24HE0191 · ₱4,945,000.00 · mapped
- Construction of Dumanjug CIS Drainage System, Dumanjug, Cebu24HO0028 · ₱4,898,131.85 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRAS. PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONST. OF ROAD AT SITIO MATIN-AW, BRGY. TONGGO,24HE0170 · ₱4,890,000.00 · mapped
Across government
- DPWH Infrastructure: 32 awards · ₱904,572,447.11
- 25H00102₱14,185,500.00· 2025-07-28· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ( REGIONAL OFFICE VI
- 25HE0086₱48,019,974.08· 2025-06-27· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - CEBU 2ND DEO
- 25HE0083₱38,414,973.14· 2025-06-27· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - CEBU 2ND DEO
- Construction Project₱48,020,000.00· 2025-06-25· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - CEBU 7TH DEO
- Construction Project₱24,009,000.00· 2025-03-27· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - CEBU 7TH DEO
- 25HH0128₱93,624,000.00· 2025-03-25· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - CEBU CITY DEO
- 25HH0117₱38,612,000.00· 2025-03-17· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - CEBU CITY DEO
- Construction Project₱14,479,500.00· 2025-03-13· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - CEBU 7TH DEO
- Construction Project₱14,479,000.00· 2025-03-13· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - CEBU 7TH DEO
- Construction Project₱14,627,000.00· 2025-02-28· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - CEBU 7TH DEO
- 25HN0017₱14,675,000.00· 2025-01-31· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - CEBU 6TH DEO
- Construction Project₱13,562,000.00· 2025-01-31· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - CEBU 7TH DEO
- Construction Project₱7,111,000.00· 2024-12-31· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - CEBU 7TH DEO
- 24HG0108₱29,379,000.00· 2024-09-30· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - CEBU 2ND DEO
- 24HN0141₱144,700,000.00· 2024-07-23· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - CEBU 6TH DEO
- 24HD0105₱48,752,000.00· 2024-07-12· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - CEBU 4TH DEO
- Construction Project₱29,252,000.00· 2024-07-12· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - CEBU 7TH DEO
- 23HN0202₱29,388,000.00· 2024-07-01· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - CEBU 6TH DEO
- 24HD0103₱19,570,500.00· 2024-06-28· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - CEBU 4TH DEO
- 24HD0106₱19,500,000.00· 2024-06-26· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - CEBU 4TH DEO
- 24H00099₱24,074,999.89· 2024-05-28· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ( REGIONAL OFFICE VI
- Construction Project₱28,510,000.00· 2024-05-22· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - CEBU 7TH DEO
- 24HE0191₱4,945,000.00· 2024-04-29· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - CEBU 2ND DEO
- 24HN0065₱24,470,000.00· 2024-04-11· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - CEBU 6TH DEO
- 24HE0170₱4,890,000.00· 2024-03-22· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - CEBU 2ND DEO
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
