AJM PROVIDENCE BUILDERS is listed as a company organization in Philippine public procurement records on this site, with 29 linked DPWH project(s) totaling about ₱129,675,670.20. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
AJM PROVIDENCE BUILDERS
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 29
- Total value
- ₱129,675,670.20
- Published flags
- 0
- Region
- Negros Occidental 2nd DEO · Negros Island Region
Public Record Grade
A transparent, data-derived summary of reported public records for AJM PROVIDENCE BUILDERS — not an accusation or finding of wrongdoing.
Score: 89.00 / 100 · Projects in sample: 29 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 92.6/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 92.6
- lateCompletedProjects
- 4
- onTimeCompletedProjects
- 23
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 27
- pastTargetOngoingProjects
- 0
- undatedCompletedProjectsExcluded
- 2
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 29
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 29
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 29
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 29
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
25 geotagged projects — Open full map · Download projects (CSV)
- CONCRETING OF SO. MAMIG,BRGY. LOCOTAN ROAD,BRGY. LOCOTAN,KABANKALAN CITY,NEGROS OCCIDENTAL17RD0091 · ₱14,082,474.84 · mapped
- CONCRETING OF BRGY. LIMA-LIMA FMR, BRGY. LIMA-LIMA, ISABELA, NEGROS OCCIDENTAL21GL0088 · ₱11,940,000.00 · mapped
- CONSTRUCTION OF ROAD, TABU TO TAPI LOCAL ROAD, BRGY. TABU, ILOG, NEG. OCC.17RD0018 · ₱9,373,813.09 · mapped
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS - NRJ LEADING TO BALICAOCAO HIGHLAND RESORT, KABANKALAN CITY, NEGROS OCCIDENTAL20GM0022 · ₱9,309,999.38 · mapped
- ASSETS PRESERVATION OF NAT'L. RD-REHABILITATION/RECONSTRUCTION /UPGRADING OF. . . .BAYAWAN-MABINAY R16HL0128 · ₱6,483,750.00 · mapped
- OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE ALONG BAIS-KABANKALAN ROAD, K0086+420-K0086+64015HK0171 · ₱6,415,777.55 · mapped
- CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - ISABELA-LIBAS NEGROS OCC. BDRY RD - K0089 + 844 - K0089 + 970, K0090 + 040 - K0090 + 200, K0090 + 220 - K0090 + 32022GL0029 · ₱6,112,260.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING IN HIMAMAYLAN CITY, NEGROS OCCIDENTAL23GL0074 · ₱5,197,500.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, LA CASTELLANA, NEGROS OCCIDENTAL24GL0038 · ₱4,964,000.00 · mapped
- IMPROVEMENT OF ROAD AT SO. PACITA TO SO. MERCEDES, BRGY. SAG ANG, LA CASTELLANA, NEGROS OCCIDENTAL22GL0076 · ₱4,950,000.00 · mapped
- CONSTRUCTION OF ROAD AT BARANGAY CAMANDAG, LA CASTELLANA, NEGROS OCCIDENTAL23GL0043 · ₱4,919,995.01 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY BIAK NA BATO, LA CASTELLANA, NEGROS OCCIDENTAL24GL0029 · ₱4,915,000.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING,INOLINGAN ELEMENTARY SCHOOL, BARANGAY INOLINGAN, MOISES PADILLA, NEGROS OCCIDENTAL25GL0074 · ₱4,910,000.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING - CONSTRUCTION OF MULTI-PURPOSE BUILDING, CALILING NATIONAL HIGH SCHOOL, BARANGAY CALILING, CAUAYAN, NEGROS OCCIDENTAL25GM0030 · ₱4,875,507.14 · mapped
- CONSTRUCTION OF 1-UNIT 1-STOREY 3-CLASSROOM (7M X 27M PLUS CORRIDOR) SCHOOL BUILDING AT LIBAS ELEMENTARY SCHOOL17RC0090 · ₱4,475,516.42
- CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAINWATER COLLECTOR SYSTEM - RAINWATER COLLECTOR IN PUBLIC FACILITIES25RC0002 · ₱2,598,000.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT),BRGY. SAN JOSE, SIPALAY CITY, NEGROS OCCIDENT15GM0140 · ₱2,338,294.72 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT) AT HAGTU, MABINAY15HK0147 · ₱2,090,852.64 · mapped
- CONSTRUCTION OF MPB, CUNALUM ELEMENTARY SCHOOL, SITIO CUNALUM, BGY. CARABALAN, HIMAMAYLAN CITY, NEGROS OCCIDENTAL19GL0081 · ₱1,977,724.15 · mapped
- CONCRETING OF ROAD, BARANGAY SANTEODORO , BINALBAGAN, NEG. OCC16GL0016 · ₱1,960,000.00
- CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BRGY. SAG-ANG, LA CASTELLANA, NEGROS OCCIDENTAL18GL0024 · ₱1,946,340.00 · mapped
- CONCRETING OF SITIO LUMANTAO FMRM, BRGY. ALIIS, BAYAWAN CITY16HL0058 · ₱1,940,400.00
- CONSTRUCTION OF FMR FROM NATIONAL ROAD TO JUNCTION MALAGA HAVEMARBO VILLAGE VIA HACIENDA IGPANULONG, BRGY. ROBLES, LA CASTELLANA, NEGROS OCCIDENTAL17RC0103 · ₱1,910,400.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING,SAG-ANG ELEMENTARY SCHOOL17RC0003 · ₱1,900,827.38
- CONCRETING OF BRGY. CANSAL-ING FMR, MABINAY, NEGROS ORIENTAL16HK0044 · ₱1,890,500.00 · mapped
- CONCRETING OF SITIO DANAWAN, BRGY. TARA FMR, MABINAY, NEG. OR.16HK0045 · ₱1,890,500.00 · mapped
- LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF ROAD NABILOG DAUP-DAUPAN ROAD,BRGY. TAGOC, KABANKALAN C15GM0110 · ₱1,843,239.88 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), MANSALANAO ELEMENTARY SCHOOL, BRGY. MANSALANAO, LA CASTELLANA, NEGROS OCCIDENTAL21GL0010 · ₱1,479,998.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE CENTER AT JOSE SORIANO ELEMENTARY SCHOOL, BRGY. NATO,LA CASTELLANA, NEGROS OCCIDENTAL18GL0021 · ₱983,000.00 · mapped
Equipment & capacity
PCAB license
No PCAB license is linked to this record. It may be a joint venture, a foreign firm, or a name we could not match. Search PCAB.
Government performance ratings (CPES)
No CPES evaluation lists this contractor's PCAB license in the GPPB releases we loaded (34th–41st).
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →