PRIME BUILT CONST is listed as a company organization in Philippine public procurement records on this site, with 33 linked DPWH project(s) totaling about ₱443,400,135.44. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
PRIME BUILT CONST
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 33
- Total value
- ₱443,400,135.44
- Published flags
- 0
- Region
- Nueva Vizcaya 2nd DEO · Region II
Public Record Grade
A transparent, data-derived summary of reported public records for PRIME BUILT CONST — not an accusation or finding of wrongdoing.
Score: 88.10 / 100 · Projects in sample: 33 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 88.2/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 88.2
- lateCompletedProjects
- 0
- onTimeCompletedProjects
- 30
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 32
- pastTargetOngoingProjects
- 2
- undatedCompletedProjectsExcluded
- 1
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 33
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 33
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 33
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 33
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
33 geotagged projects — Open full map · Download projects (CSV)
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - PAPAYA-MALABING-WANGAL-BINUGAWAN-TADJI-RUNRUNO RD - K0296 + 000 - K0297 + 024, KASIBU, NU25BJ0008 · ₱37,160,754.19 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM BASIC INFRASTRUCTURE PROGRAM (BIP) MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES- CONSTRUCTION OF MULTI-PURPOSE BUILDING (LGU COMPOUND), BRGY. DON MARIANO MARCOS, BAYOMBONG, NUEVA VIZCAYA23BI0076 · ₱29,700,000.00 · mapped
- NATIONAL BUILDING PROGRAM BUILDING AND OTHER STRUCTURES MULTIPURPOSE/FACILITIES CONSTRUCTION OF NUEVA VIZCAYA FIRST DEO OFFICE BUILDING, BAYOMBONG, NUEVA VIZCAYA25BI0048 · ₱29,395,200.00 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS - ARITAO-QUIRINO RD - K0291 + 000 - K0293 + 000, KASIBU, NUEVA VIZCAYA25BJ0001 · ₱27,804,556.25 · mapped
- ASSET PRESERVATION PROGRAM REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-TERTIARY ROADS JCT. NATL ROAD-BITNONG-BELANCE-NUEVA VIZCAYA BDRY. ROAD, K0266+000-K0266+347, K0273+000-K0273+484 DUPAX DEL NORTE, NUEVA VIZCAYA22BJ0004 · ₱27,347,856.69 · mapped
- ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE ALONG TERTIARY ROADS, BAMBANG-KASIBU-SOLANO ROAD K0267+838-K0268+644, K0269+018-K0269+612 KASIBU, NUEVA VIZCAYA23BJ0029 · ₱22,257,380.86 · mapped
- CONSTRUCTION OF 2STY8CL, AMBAGUIO HIGH SCHOOL, AMBAGUIO, NUEVA VIZCAYA23BI0099 · ₱21,700,000.00 · mapped
- CY 2024 BASIC EDUCATION FACILITIES FUND (BEFF) CONSTRUCTION OF CLASSROOM CONSTRUCTION 2-STOREY 8-CLASSROOM SCHOOL BUILDING OF STA. FE NATIONAL HIGH SCHOOL, BARANGAY VILLAFLORES, STA. FE, NUEVA VIZCAYA24BJ0076 · ₱19,661,754.66 · mapped
- REHABILITATION OF BAYOMBONG PUBLIC MARKET, BAYOMBONG, NUEVBA VIZCAYA19BI0099 · ₱14,925,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM(CSSP)-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG))-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF MULTI-PURPOSE BUILDING, (PHASE III), BAYOMBONG22BI0041 · ₱14,700,000.00 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS - BAMBANG-KASIBU-SOLANO RD - K0274 + 800 - K0275 + 601, KASIBU, NUEVA VIZCAYA25BJ0002 · ₱14,555,479.20 · mapped
- ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE ALONG TERTIARY ROADS PANTABANGAN-CANILI-BASAL-BALER RD K0191+183-K0192+687 ALFONSO CASTAÑEDA, NUEVA VIZCAYA22BJ0029 · ₱14,125,566.03 · mapped
- OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL AT BARANGAY STA. CLARA, STA. 0+000 - 0+500, UPPER STA. CLARA25BJ0019 · ₱14,055,163.67 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS - JCT NATL ROAD-BITNONG-BELANCE-N VIZCAYA BDRY RD - K0256 + (-804) - K0256 + 000, DUPAX DEL NORTE, NUEVA VIZCAYA25BJ0003 · ₱13,719,232.07 · mapped
- CONCRETING OF FARM-TO-MARKET-ROAD, BRGY. STO. DOMINGO WEST, BAMBANG, NUEVA VIZCAYA22BI0077 · ₱9,950,000.00 · mapped
- LOCAL PROGRAM-BUILDING AND OTHER STRUCTURES-MULTI-PURPOSE FACILITIES-LOCAL INFRASTRUCTURE PROGRAM- CONSTRUCTION/IMPROVEMENT OF BAYOMBONG PUBLIC MARKET, BAYOMBONG, NUEVA VIZCAYA20BI0050 · ₱9,900,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP): BASIC INFRASTRUCTURE PROGRAM (BIP) 1 MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES CONSTRUCTION OF MULTI-PURPOSE BUILDING, BAYOMBONG, NUEVA VIZCAYA22BI0051 · ₱9,900,000.00 · mapped
- LOCAL PROGRAM-BUILDINGS AND OTHER STRUCTURES-MULTIPURPOSE/FACILITIES-LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF BAYOMBONG PUBLIC MARKET, BAYOMBONG, NUEVA VIZCAYA21BI0028 · ₱9,900,000.00 · mapped
- CY 2024 BASIC EDUCATION FACILITIES FUND (BEFF) CONSTRUCTION OF CLASSROOM CONSTRUCTION OF SCHOOL BUILDING IN STA. FE CENTRAL SCHOOL, BARANGAY BALILING, STA. FE, NUEVA VIZCAYA24BJ0074 · ₱9,830,630.44 · mapped
- CY 2024 BASIC EDUCATION FACILITIES FUND (BEFF) CONSTRUCTION OF CLASSROOM CONSTRUCTION OF SCHOOL BUILDING IN PINAYAG NATIONAL HIGH SCHOOL, BARANGAY PINAYAG, KAYAPA, NUEVA VIZCAYA24BJ0075 · ₱9,830,459.96 · mapped
- BASIC INFRASTRUCTURE PROGRAM (BIP)-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, ARITAO, NUEVA VIZCAYA23BJ0060 · ₱9,753,480.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/ RAIN WATER COLLECTORS-WATER SUPPLY SYSTEM-CONSTRUCTION OF SOLAR WATER SYSTEM BARANGAY BONE NORTH, ARITAO, NUEVA VIZCAYA23BJ0089 · ₱9,701,033.79 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/ RAIN WATER COLLECTORS-WATER SUPPLY SYSTEM-CONSTRUCTION OF SOLAR WATER SYSTEM BARANGAY COMON, ARITAO, NUEVA VIZCAYA23BJ0086 · ₱9,700,954.47 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/ RAIN WATER COLLECTORS-WATER SUPPLY SYSTEM-CONSTRUCTION OF SOLAR WATER SYSTEM KAYAPA, NUEVA VIZCAYA23BJ0087 · ₱9,653,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/ RAIN WATER COLLECTORS-WATER SUPPLY SYSTEM-CONSTRUCTION OF SOLAR WATER SYSTEM ALFONSO CASTAÑEDA, NUEVA VIZCAYA23BJ0088 · ₱9,653,000.00 · mapped
- CONCRETING OF BRGY. YABBI FMR, BRGY. YABBI, DUPAX DEL NORTE, NUEVA VIZCAYA21BJ0039 · ₱9,452,258.52 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP) MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES CONSTRUCTION OF MULTI-PURPOSE BUILDING, SOLANO NORTH ELEMENTARY SCHOOL, BARANGAY OSMEÑA, SOLANO24BI0067 · ₱4,950,000.00 · mapped
- ASSET PRESERVATION PROGRAM REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-TERTIARY ROADS NUEVA VIZCAYA-PANGASINAN ROAD, K0216+(-182.50)- K0216+000 STA. FE, NUEVA VIZCAYA22BJ0005 · ₱4,714,466.81 · mapped
- ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE ALONG TERTIARY ROADS- BAMBANG-KASIBU-SOLANO RD- K0281+416-K0281+819 KASIBU, NUEVA VIZCAYA22BJ0028 · ₱3,669,322.70 · mapped
- BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, CAROLOTAN ELEMENTARY SCHOOL, BRGY. CAROLOTAN, DUPAX DEL SUR, NUEVA VIZCAYA24BJ0052 · ₱3,464,902.10 · mapped
- BASIC INFRASTRUCTURE PROGRAM (BIP)-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, IMPROVEMENT (COMPLETION) OF LAND TRANSPORTATION OFFICE, POBLACION, ARITAO, NUEVA VIZCAYA23BJ0061 · ₱2,938,815.00 · mapped
- LOCAL PROGRAM-BUILDINGS AND OTHER STRUCTURES-MULTIPURPOSE/FACILITIES-LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF MULTI-PURPOSE BUILDING, BAYOMBONG CENTRALSCHOOL, BAYOMBONG, NUEVA VIZCAYA21BI0001 · ₱2,671,880.61 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING BARANGAY BABADI, KAYAPA, NUEVA VIZCAYA21BJ0041 · ₱2,657,987.42 · mapped
Equipment & capacity
PCAB license
No PCAB license is linked to this record. It may be a joint venture, a foreign firm, or a name we could not match. Search PCAB.
Government performance ratings (CPES)
No CPES evaluation lists this contractor's PCAB license in the GPPB releases we loaded (34th–41st).
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →