F H GOPITEO CONST & SUPPLY 21336 is listed as a company organization in Philippine public procurement records on this site, with 20 linked DPWH project(s) totaling about ₱1,241,861,357.15. No delivery grade published yet (insufficient linked public records).
F H GOPITEO CONST & SUPPLY 21336
N/GRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 20
- Total value
- ₱1,241,861,357.15
- Published flags
- 0
- Region
- South Cotabato 2nd DEO · Region XII
Public Record Grade
A transparent, data-derived summary of reported public records for F H GOPITEO CONST & SUPPLY 21336 — not an accusation or finding of wrongdoing.
Not graded yet — the Public Record Grade has not been computed for this contractor.
Computed automatically from public DPWH, PhilGEPS, and COA records. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
19 geotagged project(s) — Open full map
- IMPLEMENTATION OF VARIOUS EVACUATION CENTERS: 1 BRGY. SAN JOSE, KORONADAL CITY, SOUTH COTABATO 2 BRGY. POBLACION ARAKAN, COTABATO 3 BRGY. AMAS, KIDAPAWAN CITY 4 BARGY. CALEAN, TACURONG CITY, SULTAN KUDARAT 5 BRGY. SUDAPIN, KIDAPAWAN CITY, COTABATO AND 6 B20M00082 · ₱208,109,352.18 · mapped
- STRUCTURAL IMPROVEMENT OF PUBLIC BUILDINGS AND CONSTRUCTION OF EVACUATION CENTERS/QUARANTINE FACILITIES, MAASIM, SARANGANI; MAGPET, NORTH COTABATO; BANISILAN, NORTH COTABATO; COLUMBIO, SULTAN KUDARAT; T'BOLI, SOUTH COTABATO21M00142 · ₱173,695,940.26 · mapped
- STRUCTURAL IMPROVEMENT OF PUBLIC BUILDINGS AND CONSTRUCTION OF EVACUATION CENTERS, BRGY. NEW LEON, ALEOSAN, NORTH COTABATO , BRGY. CENTRALLAH, SURALLAH, SOUTH COTABATO19M00044 · ₱138,828,143.99 · mapped
- RECONSTRUCTION OF MUNICIPAL HALL IN BARANGAY POBLACION, MAKILALA, COTABATO20M00089 · ₱134,899,775.31 · mapped
- ROAD WIDENING COTABATO MARBEL ROAD, K1715+500-K1718+790 KORONADAL CITY, SOUTH COTABATO20M00030 · ₱99,932,828.01 · mapped
- CONSTRUCTION OF CONCRETE ROAD-POBLACION T'BOLI TO BRGY. LACONON LEADING TO BAKNEB RIVER CAVE ROAD, BRGY. LACONON, T'BOLI, SOUTH COTABATO20MG0053 · ₱57,899,998.02 · mapped
- CONSTRUCTION OF BINAY RIVER FLOOD CONTROL, STA. 7 + 900 - 8 + 100 L/S, STA. 7 + 950 - STA. 8 + 850 R/S, PRESIDENT ROXAS, NORTH COTABATO22MC0004 · ₱49,000,000.00 · mapped
- CLUSTER VIII-A.ROAD WIDENING-COTABATO-MARBEL RD-K1737+650-K1737+850 B.ROAD WIDENING-COTABATO-MARBEL RD-K1718+823-K1720+035 C.ROAD WIDENING-ALONG COTABATO-MARBEL RD (S00276MN) K1745+607-K1745+815.522MG0022 · ₱48,879,216.17 · mapped
- CLUSTER IX-A.ROAD WIDENING-MIDSAYAP-MARBEL RD-1779+427-K1779+968, SOUTH COTABATO B.ROAD WIDENING-MIDSAYAP-MARBEL RD-K1784+100-K1784+992.57, SOUTH COTABATO21MG0138 · ₱41,178,909.12 · mapped
- CONSTRUCTION OF FLOOD CONTROL/CONCRETE REVETMENT ALONG SIGUEL RIVER, BRGY. SIGUEL, GENERAL SANTOS CITY20MB0018 · ₱39,198,866.69 · mapped
- CONSTRUCTION OF FOUR-STOREY 12 CLASSROOMS (1CL + 1 LAB PER FLOOR) SCHOOL BUILDING/MALIMONO NATIONAL HIGH SCHOOL, MALIMONO, SURIGAO DEL NORTE18NF0126 · ₱35,520,819.59 · mapped
- CONSTRUCTION OF REVETMENT ALONG MARBEL RIVER, (NAMNAMA SECTION), KORONADAL CITY, SOUTH COTABATO22MG0008 · ₱34,299,782.46 · mapped
- CONSTRUCTION OF 3 STY 12CL WORKSHOP BUILDING (7X18) 2SCI, 2ICT, 2REG MINAPAN HIGH SCHOOL, TULUNAN, NORTH COTABATO18MC0212 · ₱29,728,781.84 · mapped
- CONSTRUCTION OF 1 UNIT-4STY 16CL AT LIBERTAD NHS, SURALLAH, SOUTH COTABATO16MG0240 · ₱28,828,414.77
- CONSTRUCTION OF MARBEL RIVER BANK PROTECTION (STA. 3+180-STA. 3+450, RIGHT BANK), MATALAM, COTABATO18MC0107 · ₱24,499,000.00 · mapped
- CONSTRUCTION OF REVETMENT ALONG MARBEL RIVER (MARBEL BRIDGE APPROACH A - DOWNSTREAM, PHASE III), MATALAM, NORTH COTABATO STA. 3+450-STA 3+720 L=270 LM RIGHT BANK (RE-PUBLISHED)18MC0110 · ₱24,499,000.00 · mapped
- CONSTRUCTION OF KABACAN RIVER FLOOD CONTROL, PRESIDENT ROXAS, NORTH COTABATO STA. 42+480-STA. 42+880 L=400 LM LEFT BANK18MC0109 · ₱24,499,000.00 · mapped
- CONSTRUCTION OF 1 UNIT-2STY 8CL AT RANG-AY IS, BANGA, SOUTH COTABATO18MG0185 · ₱16,948,772.19 · mapped
- CONSTRUCTION OF 1 UNIT-2STY 8CL AT RANG-AY IS, BANGA, SOUTH COTABATO18MG0186 · ₱16,948,772.19 · mapped
- REHABILITATION OF BRGY. MALAYA FLOOD CONTROL AND BANK PROTECTION ALONG BANGA RIVER, BANGA, SOUTH COTABATO18MG0120 · ₱14,465,984.36 · mapped
