TEKTON CONST CORP is listed as a company organization in Philippine public procurement records on this site, with 9 linked DPWH project(s) totaling about ₱47,058,873.12. Recorded delivery grade C (from public DPWH project records — not a finding of wrongdoing).
TEKTON CONST CORP
CGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 9
- Total value
- ₱47,058,873.12
- Published flags
- 0
- Region
- Palawan 1st DEO · Region IV-B
Licensed officers (PCAB)
- JOSE RHEDDEN PAULO LAYOG BAGAIN · Authorized Managing Officer (PCAB license 33805) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for TEKTON CONST CORP — not an accusation or finding of wrongdoing.
Score: 78.60 / 100 · Projects in sample: 9 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 77.8/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 77.8
- lateCompletedProjects
- 4
- onTimeCompletedProjects
- 5
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 9
- pastTargetOngoingProjects
- 0
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 9
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 9
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 9
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 9
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
9 geotagged projects — Open full map · Download projects (CSV)
- CONSTRUCTION OF TWO-STOREY (6 CLASSROOMS) SCHOOL BUILDING SALVACION NHS- CONCEPCION ANNEX BUSUANGA, PALAWAN18EE0176 · ₱13,409,646.93 · mapped
- CONSTRUCTION OF 2-STOREY 4 CLASSROOM (2 UNITS ICT LABORATORY BUILDING) NEW BUSUANGA NATIONAL HIGH SCHOOL, BUSUANGA, PALAWAN18EE0177 · ₱10,102,404.25 · mapped
- CONSTRUCTION OF 2-STOREY 4 CLASSROOM (2 UNITS ICT LABORATORY BUILDING) CONCEPCION NATIONAL HIGH SCHOOL, BUSUANGA, PALAWAN18EE0179 · ₱9,136,921.39 · mapped
- CONSTRUCTION OF 2-STOREY 4 CLASSROOM (2 UNITS ICT LABORATORY BUILDING) SALVACION NATIONAL HIGH SCHOOL, BUSUANGA, PALAWAN18EE0178 · ₱9,130,467.40 · mapped
- COMPLETION OF 2-STOREY 4 CLASSROOM (2 UNITS ICT LABORATORY BUILDING) SALVACION NATIONAL HIGH SCHOOL, BUSUANGA, PALAWAN18EE0302 · ₱1,750,949.53 · mapped
- COMPLETION OF 2-STOREY 4 CLASSROOM (2 UNITS ICT LABORATORY BUILDING) CONCEPCION NATIONAL HIGH SCHOOL, BUSUANGA, PALAWAN18EE0303 · ₱1,454,297.02 · mapped
- COMPLETION OF TWO-STOREY (6 CLASSROOMS) SCHOOL BUILDING SALVACION NHS- CONCEPCION ANNEX BUSUANGA, PALAWAN18EE0300 · ₱1,144,250.00 · mapped
- COMPLETION OF 2-STOREY 4 CLASSROOM (2 UNITS ICT LABORATORY BUILDING) NEW BUSUANGA NATIONAL HIGH SCHOOL, BUSUANGA, PALAWAN18EE0301 · ₱480,310.55 · mapped
- CONSTRUCTION (COMPLETION) OF 2 STY 4 CL (2 UNITS ICT LAB.) NEW BUSUANGA NATIONALHIGH SCHOOLBUSUANGA, PALAWAN21EE0128 · ₱449,626.05 · mapped
Equipment & capacity
PCAB license
- License no.
- 33805
- Category
- B · Medium A
- Minimum net worth for this category
- ₱10,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱150M
- License valid until
- Jun 5, 2027
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 33805); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
No CPES evaluation lists this contractor's PCAB license in the GPPB releases we loaded (34th–41st).
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
- Municipality of Sarrat, Ilocos Norte Infrastructure: 38 awards · ₱123,772,292.63
- DPWH Infrastructure: 5 awards · ₱42,226,925.97
- Province of Ilocos Norte Infrastructure: 2 awards · ₱25,646,277.51
- Bureau of Fisheries and Aquatic Resources Goods & services: 1 award · ₱1,231,725.85
- Municipality of Sarrat, Ilocos Norte Goods & services: 1 award · ₱398,179.69
- CONSTRUCTION OF COVERED COURT EXTENSION
- INTERIOR FITOUT TO INCLUDE FURNI. & VENTILATION
- REPAIR AND MAINTENANCE OF SLAUGHTERHOUSE (NORTH)
- IMPROVEMENT OF MUNICIPAL HALL BUILDING (SB OFFICE)
- CONTINUATION OF RHU ANNEX (PRIMARY CARE FACILITY)
- PROVISION OF POTABLE WATER SUPPLY SYSTEM
- RENOVATION/IMPROVEMENT OF COMFORT ROOMS
- Repair and Maintenance of the Air Conditioning System at the Centennial Arena
- IMPROVEMENT/REHAB. OF MULTI-PURPOSE BUILDING
- CONSTRUCTION OF PRINCIPAL'S OFFICE CR
- REPAIR OF SARRAT RURAL HEALTH UNIT
- OTHER STRUCTURES (PROVISION OF ELEVATED WATER TANK
- Continuation of RHU Annex Super Health Care
- PROVISION OF PERIMETER FENCE OF RHU FACILITY
- IMPROVEMENT/ PROVISION OF GLASS CURTAIN OF CIVIC C
- Rehabilitation/Improvement of Municipal Hall
- Construction of RHU Annex (Continuation)
- Tourism Development
- Construction of Sarrat Rural Health Unit (RHU)
- Repair & Rehabilitation of Binaratan Brgy
- Repair and Rehabilitation of Pandan Brgy Health
- Repair & Rehabilitation of Sagpatan Brgy
- Rehabilitation/Improvement of Municipal Hall
- Upgrading of Sarrat RHU Annex & Expansion
- Repair & Maintenance of Public Building
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →