ELC CONST AND TRADING is listed as a company organization in Philippine public procurement records on this site, with 36 linked DPWH project(s) totaling about ₱129,303,670.32. Recorded delivery grade A (from public DPWH project records — not a finding of wrongdoing).
ELC CONST AND TRADING
AGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 36
- Total value
- ₱129,303,670.32
- Published flags
- 0
- Region
- Bukidnon 2nd DEO · Region X
Online presence
Google Maps: ELC CONSTRUCTION AND TRADINGGoogle Maps, 2026-10-22
PUROK MALIGAYA, Quezon, 8715 Bukidnon
Licensed officers (PCAB)
- Eduardo Painit Cañete, Jr. · Authorized Managing Officer (PCAB license 41629) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for ELC CONST AND TRADING — not an accusation or finding of wrongdoing.
Score: 92.90 / 100 · Projects in sample: 36 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 98.6/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 98.6
- lateCompletedProjects
- 1
- onTimeCompletedProjects
- 35
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 36
- pastTargetOngoingProjects
- 0
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 36
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 36
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 36
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 36
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
36 geotagged projects — Open full map · Download projects (CSV)
- CONCRETING OF SITIO LAGSOON TO SITIO MALANTAO, BRGY. HALAPITAN FMR, BRGY. HALAPITAN, SAN FERNANDO, BUKIDNONBRGY. HALAPITAN, SAN FERNANDO, BUKIDNON 2ND LD21KA0123 · ₱19,897,722.84 · mapped
- CONSTRUCTION OF 1 UNIT 1 STOREY 5 CLASSROOM SCHOOL BUILDING AT LUMINTAO ES, QUEZON, BUKIDNON19KB0141 · ₱13,402,999.64 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY LIBERTAD, QUEZON, BUKIDNON21KB0170 · ₱9,900,000.00 · mapped
- CONSTRUCTION OF 2 UNITS, 1 STY - 2 CL SCHOOL BUILDING WITH TOILET, TANDONG ES, TANDONG, KITAOTAO, BUKIDNON18KB0145 · ₱5,669,234.38 · mapped
- Construction of Box Culvert, Barangay Magsaysay, Quezon, Bukidnon23KB0051 · ₱4,950,000.00 · mapped
- CONSTRUCTION OF BARANGAY ROAD, BRGY. MAGSAYSAY, QUEZON, BUKIDNON23KB0082 · ₱4,950,000.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY POBLACION, QUEZON, BUKIDNON22KB0066 · ₱4,950,000.00 · mapped
- CONSTRUCTION OF ROAD, BARANGAY KIPAYPAYON, QUEZON, BUKIDNON24KB0108 · ₱4,950,000.00 · mapped
- CONSTRUCTION OF ROAD, BARANGAY CEBOLE, QUEZON, BUKIDNON24KB0113 · ₱4,950,000.00 · mapped
- CONSTRUCTION OF MULTIPURPOSE BUILDING, BRGY. LIBERTAD, QUEZON, BUKIDNON22KB0173 · ₱4,950,000.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), PUROK 1, BARANGAY SOUTH POBLACION, MARAMAG, BUKIDNON25KB0005 · ₱4,930,133.97 · mapped
- CONSTRUCTION/COMPLETION OF MULTI-PURPOSE BUILDING, BRGY LIBERTAD, QUEZON, BUKIDNON20KB0178 · ₱2,970,000.00 · mapped
- CONSTRUCTION OF WATER SYSTEM, BRGY BALANGIGAY, KITAOTAO, BUKIDNON21KB0181 · ₱2,425,526.28 · mapped
- COMPLETION OF MPB (BARANGAY HALL), BRGY SALAWAGAN, QUEZON, BUKIDNON21KB0177 · ₱1,980,000.00 · mapped
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BRGY SALAWAGAN, QUEZON, BUKIDNON19KB0061 · ₱1,980,000.00 · mapped
- CONSTRUCTION OF SCHOOL STAGE SAN MIGUEL ELEMENTARY SCHOOL, BRGY SAN MIGUEL, MARAMAG, BUKIDNON20KB0182 · ₱1,980,000.00 · mapped
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY DELAPA, QUEZON, BUKIDNON21KB0124 · ₱1,980,000.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY KALUMIHAN, KITAOTAO, BUKIDNON20KB0055 · ₱1,980,000.00 · mapped
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, QUEZON NATIONAL HIGH SCHOOL, BARANGAY POBLACION, QUEZON, BUKIDNON22KB0096 · ₱1,980,000.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY PAGAN, KITAOTAO, BUKIDNON20KB0056 · ₱1,980,000.00 · mapped
- CONSTRUCTION OF COVERED COURT, BRGY KALUMIHAN, KITAOTAO, BUKIDNON20KB0175 · ₱1,980,000.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BRGY KIPAYPAYON, QUEZON, BUKIDNON19KB0048 · ₱1,980,000.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (SOLAR DRIER WITH WAREHOUSE), BARANGAY EMBAYAO, DON CARLOS, BUKIDNON19KB0096 · ₱1,979,999.94 · mapped
- REHABILITATION/MAJOR REPAIR OF BRIDGE, KULAMAN BR. (B01374MN) ALONG SAYRE HIGHWAY, BAYABASON, MARAMAG, BUKIDNON 3RD LD23KB0007 · ₱1,910,974.36 · mapped
- CONSTRUCTION OF WATER SYSTEM, BARANGAY BAYABASON (SPRING), MARAMAG, BUKIDNON21KB0129 · ₱1,890,975.64 · mapped
- CONSTRUCTION OF MPB, BRGY DELAPA, QUEZON, BUKIDNON19KB0158 · ₱1,881,150.02 · mapped
- COMPLETION OF MPB (COVERED COURT), BRGY MIBANTANG, QUEZON, BUKIDNON19KB0160 · ₱1,881,022.85 · mapped
- CONSTRUCTION OF MPB, BRGY MERANGERAN, QUEZON, BUKIDNON19KB0154 · ₱1,880,612.73 · mapped
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY MERANGERAN, QUEZON, BUKIDNON21KB0029 · ₱1,793,592.19 · mapped
- CONSTRUCTION OF WATER SYSTEM, BARANGAY KIARA, DON CARLOS, BUKIDNON21KB0034 · ₱1,629,123.26 · mapped
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (COVERED COURT), BRGY KIBATANG, DON CARLOS, BUKIDNON20KB0122 · ₱1,470,000.00 · mapped
- REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, MULITA BR. (B01415MN) ALONG DON CARLOS-KADINGILAN RD. SAN NICOLAS, DON CARLOS, BUKIDNON25KB0001 · ₱1,460,421.70 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY SAN MIGUEL, MARAMAG, BUKIDNON19KB0127 · ₱1,410,685.85 · mapped
- COMPLETION OF MULTI-PURPOSE BUILDING (COVERED COURT), SALAWAGAN NATIONAL HIGH SCHOOL, SALAWAGAN, QUEZON, BUKIDNON18KB0080 · ₱1,409,494.67 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (DAY CARE CENTER), PUROK 5, BRGY SAN MIGUEL, MARAMAG, BUKIDNON20KB0130 · ₱1,000,000.00 · mapped
- REHABILITATION/IMPROVEMENT OF SCHOOL STAGE, KIBATANG ELEMETARY SCHOOL, BRGY KIBATANG, DON CARLOS, BUKIDNON20KB0091 · ₱990,000.00 · mapped
Equipment & capacity
PCAB license
- License no.
- 41629
- Category
- B · Medium A
- Minimum net worth for this category
- ₱10,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱150M
- License valid until
- Feb 15, 2027
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 41629); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
No CPES evaluation lists this contractor's PCAB license in the GPPB releases we loaded (34th–41st).
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →