HAQ CONST is listed as a company organization in Philippine public procurement records on this site, with 16 linked DPWH project(s) totaling about ₱37,059,448.66. Recorded delivery grade C (from public DPWH project records — not a finding of wrongdoing).
HAQ CONST
CGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 16
- Total value
- ₱37,059,448.66
- Published flags
- 0
- Region
- Cotabato 1st DEO · Region XII
Public Record Grade
A transparent, data-derived summary of reported public records for HAQ CONST — not an accusation or finding of wrongdoing.
Score: 77.30 / 100 · Projects in sample: 16 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 65.6/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 65.6
- lateCompletedProjects
- 11
- onTimeCompletedProjects
- 5
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 16
- pastTargetOngoingProjects
- 0
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 16
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 16
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 16
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 16
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
11 geotagged projects — Open full map · Download projects (CSV)
- CONST. OF 1STY 4CL SCHOOL BUILDING (TOILET ATTACHED), UPPER BULANAN ES, MIDSAYAP, COTABATO17MD0175 · ₱4,180,193.70
- CONSTRUCTION OF IUNIT-1STY 4CL AT BASAG ELEMENTARY SCHOOL, T'BOLI, SOUTH COTABATO16MG0139 · ₱3,966,221.38 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING IN SARAYAN HIGH SCHOOL, BARANGAY SARAYAN, MATALAM, NORTH COTABATO21MI0005 · ₱2,965,391.87 · mapped
- CONST. OF 1STY 2CL SB (TOILET ATTACHED & RAINWATER COLLECTOR SYSTEM), C.V. COCAL ES ANNEX, MUN. OF L17MD0081 · ₱2,648,324.49 · mapped
- CONST. OF 1STY 2CL SCHOOL BLDG (TOILET ATTACHED), PIGCAWAYAN NHS, PATOT ANNEX, PIGCAWAYAN, COTABATO17MD0187 · ₱2,641,451.86 · mapped
- CONST. OF 1STY 2CL SB (TOILET ATTACHED), DILANGALEN ES, KABACAN, COTABATO17MD0112 · ₱2,278,134.11
- CONST. OF 1STY 2CL SB (TOILET ATTACHED), OSIAS HS, KABACAN, COTABATO17MD0108 · ₱2,278,134.11 · mapped
- CONST. OF 1-UNIT TECHVOC WORKSHOP BLDG/LABORATORY FOR SHS, RANZO NHS, CARMEN, COTABATO16MD0085 · ₱2,257,475.30 · mapped
- CONSTRUCTION OF 1UNIT-1STY 2CL AT HALILAND ES, LAKE SEBU, SOUTH COTABATO16MG0136 · ₱2,121,217.89 · mapped
- CONSTRUCTION OF MULTIPURPOSE BUILDING IN BARANGAY GAUNAN, MLANG, NORTH COTABATO17MC0026 · ₱1,944,870.43
- CONSTRUCTION OF 1 UNIT-1STY 2CL AT DIENTE ES, LAKE SEBU, SOUTH COTABATO16MG0135 · ₱1,900,421.37
- CONST. OF MP BLDG (COVERED COURT), BRGY. SANGGADONG, KABACAN, COTABATO17MD0001 · ₱1,806,682.10 · mapped
- CONST. OF BIRTHING HOME STATION, BRGY. BARONGIS, LIBUNGAN, COTABATO16MD0095 · ₱1,528,351.43 · mapped
- CONST. OF BIRTHING HOME STATION, BRGY. PALACAT, ALEOSAN, COTABATO16MD0097 · ₱1,526,642.98 · mapped
- CONST. OF BIRTHING HOME STATION, BRGY. BITOKA, MIDSAYAP, COTABATO16MD0100 · ₱1,508,561.70
- CONST. OF BIRTHING HOME STATION, BRGY. MALAPANG, ALEOSAN, COTABATO16MD0099 · ₱1,507,373.94 · mapped
Equipment & capacity
PCAB license
No PCAB license is linked to this record. It may be a joint venture, a foreign firm, or a name we could not match. Search PCAB.
Government performance ratings (CPES)
No CPES evaluation lists this contractor's PCAB license in the GPPB releases we loaded (34th–41st).
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
- Construction of Swip Road, Pigcawayan, North Cot.
- Concreting of Road at Barangay Bagua 1, Cotabato C
- Concreting of Brgy. Tumbras Road, Phase 3, Midsaya
- Const./Rehab. of Drainage System, P2, Bagua 2₱9,645,355.62· 2023-07-13· Other repair· MINISTRY OF PUBLIC WORKS - (BARMM) MAGUINDANAO COTABATO CITY
- Concreting of Brgy. Tumbras Road, Phase 2,Midsayap₱15,516,957.68· 2022-02-10· Other construction· MINISTRY OF PUBLIC WORKS - (BARMM) MAGUINDANAO COTABATO CITY
- Concreting of Brgy. Malingao Road, Phase 2, Midsay₱15,515,628.16· 2022-01-07· Other construction· MINISTRY OF PUBLIC WORKS - (BARMM) MAGUINDANAO COTABATO CITY
- 17MD0112₱2,278,134.11· 2017-08-22· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - NORTH COTABATO 2ND
- 17MD0017₱1,804,614.39· 2017-05-05· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - NORTH COTABATO 2ND
- Water Supply₱3,735,722.25· 2017-05-05· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - MAGUINDANAO 1ST ED
- 17MD0058₱1,864,225.76· 2017-05-05· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - NORTH COTABATO 2ND
- 17MD0018₱3,630,777.77· 2017-05-05· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - NORTH COTABATO 2ND
- 17MD0001₱1,806,682.10· 2017-03-27· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - NORTH COTABATO 2ND
- 17MC0026₱1,770,612.71· 2017-02-06· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - NORTH COTABATO 1ST
- 16MD0099
- 16MD0100₱1,508,561.70· 2016-11-07· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - NORTH COTABATO 2ND
- 16MD0097₱1,526,642.98· 2016-11-07· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - NORTH COTABATO 2ND
- 16MD0095₱1,528,351.43· 2016-11-07· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - NORTH COTABATO 2ND
- 16MG0139₱3,966,221.38· 2016-10-21· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - SOUTH COTABATO DEO
- 16MG0135₱1,900,421.37· 2016-10-21· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - SOUTH COTABATO DEO
- 16MG0136₱2,121,217.89· 2016-10-21· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - SOUTH COTABATO DEO
- 16MD0085₱2,257,475.30· 2016-09-22· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - NORTH COTABATO 2ND
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →