JANMARIE CONST SERVICES is listed as a company organization in Philippine public procurement records on this site, with 43 linked DPWH project(s) totaling about ₱221,483,645.80. Recorded delivery grade A (from public DPWH project records — not a finding of wrongdoing).
JANMARIE CONST SERVICES
AGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 43
- Total value
- ₱221,483,645.80
- Published flags
- 0
- Region
- South Cotabato 2nd DEO · Region XII
Public Record Grade
A transparent, data-derived summary of reported public records for JANMARIE CONST SERVICES — not an accusation or finding of wrongdoing.
Score: 90.80 / 100 · Projects in sample: 43 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 91.9/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 91.9
- lateCompletedProjects
- 7
- onTimeCompletedProjects
- 36
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 43
- pastTargetOngoingProjects
- 0
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 43
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 43
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 43
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 43
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
43 geotagged projects — Open full map · Download projects (CSV)
- CONSTRUCTION OF CONCRETE ROAD-JCT. (BEN SIDON) BACDULONG ROAD LEADING TO LAKE SEBU (LAKE SEBU CIRCUMFERENTIAL ROAD) BRGY. BACDULONG, LAKE SEBU, SOUTH COTABATO20MG0043 · ₱24,499,599.12 · mapped
- CONSTRUCTION OF 2 UNITS-1STY 3CL AT DATAL LIGAW ELEMENTARY SCHOOL, LAKE SEBU, SOUTH COTABATO20MG0080 · ₱14,463,783.94 · mapped
- CONCRETING OF BRGY. DEMOLOC FMR, BRGY. DEMOLOC, MALITA, DAVAO OCCIDENTAL21LE0153 · ₱12,929,053.81 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING FOR POST HARVEST FACILITY (BODEGA AND BAGSAKAN), KORONADAL CITY, SOUTH COTABATO24MG0031 · ₱12,861,825.64 · mapped
- CONCRETING OF LITTLE BAGUIO-DULOPAN ROAD FMR, BRGY. LITTLE BAGUIO, DAVAO OCCIDENTAL21LE0150 · ₱11,934,772.75 · mapped
- CONCRETING OF BRGY. LAWA FMR, BRGY. LAWA, DON MARCELINO, DAVAO OCCIDENTAL21LE0152 · ₱11,934,675.09 · mapped
- CONCRETING OF BRGY. OGPAO FMR, BRGY. OGPAO, STA. MARIA, DAVAO OCCIDENTAL21LE0151 · ₱11,934,229.84 · mapped
- CONCRETING OF KILALAG-PINALPALAN-DEMOLOC ROAD (MOTE SECTION) FMR, BRGY. PINALPALAN, MALITA, DAVAO OCCIDENTAL21LE0149 · ₱11,931,951.30 · mapped
- CONSTRUCTION OF CONCRETE ROAD-JCT. (BEN SIDON)-BACDULONG ROAD LEADING TO LAKE SEBU (LAKE SEBU CIRCUMFERENTIAL ROAD), BRGY. BACDULONG, LAKE SEBU, SOUTH COTABATO19MG0004 · ₱11,748,832.02 · mapped
- CONSTRUCTION OF 1 UNIT-1STY 3CL AT DEMAMIS ES, T'BOLI, SOUTH COTABATO18MG0260 · ₱5,625,926.89 · mapped
- CONSTRUCTION OF 1 UNIT 1STY-3CL AT DEMAMIS ES, T'BOLI, SOUTH COTABATO19MG0167 · ₱5,099,178.51 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (POST HARVEST FACILITY BODEGA) SEPAKA, LAKE SEBU, SOUTH COTABATO24MG0029 · ₱4,947,803.26 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. CARPENTER HILL, KORONADAL CITY, SOUTH COTABATO24MG0036 · ₱4,942,749.08 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. RANG AY, BANGA, SOUTH COTABATO24MG0058 · ₱4,934,853.14 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY SINAWAL, GENERAL SANTOS CITY, SOUTH COTABATO24MB0023 · ₱4,928,602.32 · mapped
- ROAD WIDENING-MARBEL-MAKAR RD-K1701+409-K1701+504, K1701+514-K1701+60922MG0045 · ₱4,894,891.40 · mapped
- CONSTRUCTION OF ROAD WITH DRAINAGE ALONG PUROK HONEYVILLE, BARANGAY SILWAY 8, POLOMOLOK, SOUTH COTABATO23MB0032 · ₱4,839,897.88 · mapped
- CONSTRUCTION OF MULTI-PURPOSE FACILITY (MUNICIPAL GYM) IN SURALLAH, SOUTH COTABATO18MG0254 · ₱4,814,864.00 · mapped
- CONCRETING/REHABILITATION OF TALAHIK-DUENGAS FMR, BRGY. TALAHIK AND BRGY. DUENGAS, SURALLAH, SOUTH COTABATO18MG0250 · ₱4,569,978.23 · mapped
- FLARING INTERSECTIONS/IMPROVEMENT OF INTERSECTIONS-SURALLAH-LAKE SEBU-MAITUM RD-K1733+(-305)22MG0030 · ₱3,909,820.68 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT) AT POLOMOLOK, SOUTH COTABATO21MB0085 · ₱3,303,149.95 · mapped
- ROAD CONCRETING FROM NATIONAL HIGHWAY TO PUROK LUWALHATI, BARANGAY PAGALUNGAN, POLOMOLOK, SOUTH COTABATO21MB0003 · ₱3,243,167.72 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING BRGY. KALANEG; MAITUM, SARANGANI PROVINCE.20ME0015 · ₱2,966,735.77 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (YOUTH AND SPORTS CENTER), BRGY. MALALAG; MAITUM, SARANGANI PROVINCE21ME0012 · ₱2,959,803.32 · mapped
- CONSTRUCTION OF MPB (GYMNASIUM) AT DADIANGAS NORTH ELEMENTARY SCHOOL, BRGY. DADIANGAS NORTH, GEN. SANTOS CITY19MB0093 · ₱2,955,800.26 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (YOUTH AND SPORTS CENTER), BRGY. POBLACION; MAASIM, SARANGANI PROVINCE21ME0014 · ₱2,609,951.45 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (NEW GYM), BRGY. T'BOLOK, T'BOLI, SOUTH COTABATO19MG0027 · ₱2,467,210.47 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (NEW GYM), CONCEPCION ELEMENTARY SCHOOL, BRGY. CONCEPTION, KORONADAL CITY, SOUTH COTABATO19MG0029 · ₱2,463,534.60 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), PUROK REYES, BRGY. MORALES, KORONADAL CITY, SOUTH COTABATO19MG0118 · ₱2,379,307.94 · mapped
- CONSTRUCTION OF LAMSALOME BHS, BRGY. LAMSALOME, T'BOLI, SOUTH COTABATO18MG0154 · ₱1,974,793.79 · mapped
- CONSTRUCTION OF LAMBULING BHS WITH BIRTHING FACILITY, BRGY. LAMBULING, T'BOLI, SOUTH COTABATO18MG0159 · ₱1,974,789.52 · mapped
- CONSTRUCTION (REPAIR) OF MULTI-PURPOSE BUILDING (SESSION HALL), BRGY. CONCEPCION, KORONADAL CITY, SOUTH COTABATO19MG0146 · ₱1,963,897.82 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, PUROK STA. CRUZ, BRGY. CANNERY SITE, POLOMOLOK, SOUTH COTABATO20MB0086 · ₱1,575,985.92 · mapped
- CONSTRUCTION OF SITIO UPPER LAMBUKAY LAMBA BHS, BRGY. LAMBA, BANGA, SOUTH COTABATO18MG0137 · ₱1,479,812.95 · mapped
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (GYM WITH STAGE/BLEACHERS), BARANGAY CABULING, TANTANGAN, SOUTH COTABATO21MG0016 · ₱1,455,314.96 · mapped
- CONSTRUCTION/REHABILITATION OF MULTI-PURPOSE BUILDING (GYM), BARANGAY MABINI, KORONADAL CITY, SOUTH COTABATO21MG0116 · ₱1,455,254.70 · mapped
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (GYM W/ BLEACHERS), BRGY. TASIMAN, LAKE SEBU, SOUTH COTABATO21MG0013 · ₱1,454,455.39 · mapped
- REHABILITATION OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BRGY. PARAISO, KORONADAL CITY, SOUTH COTABATO19MG0086 · ₱995,358.69 · mapped
- CONSTRUCTION (REPAIR) OF MULTI-PURPOSE BUILDING (SENIOR CITIZENS MODEL CENTER), LTO COMPOUND, BARANGAY ZONE IV, KORONADAL CITY, SOUTH COTABATO19MG0150 · ₱989,656.48 · mapped
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (GYM), SAN ANTONIO VILLAGE PHASE I, BARANGAY STA. CRUZ, KORONADAL CITY, SOUTH COTABATO21MG0023 · ₱988,740.09 · mapped
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (ELEMENTARY BUILDING), BARANGAY CARPENTER HILL, KORONADAL CITY, SOUTH COTABATO21MG0010 · ₱984,689.56 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (TRIBAL HOUSE) PUROK VALNABO, BARANGAY SAN ROQUE, KORONADAL CITY, SOUTH COTABATO18MG0123 · ₱597,059.96 · mapped
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, SAGOD IRRIGATORS ASSOCIATION OFFICE, PUROK DAISY, BRGY. AVANCEÑA, KORONADAL CITY, SOUTH COTABATO19MG0076 · ₱497,885.59 · mapped
Equipment & capacity
PCAB license
No PCAB license is linked to this record. It may be a joint venture, a foreign firm, or a name we could not match. Search PCAB.
Government performance ratings (CPES)
No CPES evaluation lists this contractor's PCAB license in the GPPB releases we loaded (34th–41st).
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →