EASTERN CONST CO INC is listed as a company organization in Philippine public procurement records on this site, with 6 linked DPWH project(s) totaling about ₱54,418,534.15. Recorded delivery grade C (from public DPWH project records — not a finding of wrongdoing).
EASTERN CONST CO INC
CGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 6
- Total value
- ₱54,418,534.15
- Published flags
- 0
- Region
- Rizal 2nd DEO · Region IV-A
Online presence
Google Maps: Eastern Construction Co., Inc. (ECCOI)★ 4 (1 reviews)Google Maps, 2026-10-22
H4JH+JRR St. Anthony subd, Santol, Cainta, 1900 Rizal
Licensed officers (PCAB)
- Reginaldo S. San Juan · Authorized Managing Officer (PCAB license 02225) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for EASTERN CONST CO INC — not an accusation or finding of wrongdoing.
Score: 74.10 / 100 · Projects in sample: 6 · As of Oct 22, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 66.7/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 66.7
- lateCompletedProjects
- 0
- onTimeCompletedProjects
- 4
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 5
- pastTargetOngoingProjects
- 1
- undatedCompletedProjectsExcluded
- 1
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 6
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 6
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 6
- componentScore
- —
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 6
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
4 geotagged projects — Open full map
- CONSTRUCTION OF FOUR (4) STOREY, EIGHT (8) CLASSROOM MARCELINO M. SANTOS NHS, ANTIPOLO CITY17DN0163 · ₱17,582,448.66
- CONSTRUCTION OF FOUR (4) STOREY, EIGHT (8) CLASSROOM OLD BOSO-BOSO NHS, ANTIPOLO CITY17DN0164 · ₱17,581,731.92
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-ACCESS ROADS AND/ OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES-CONSTRUCTION OF ROAD, PUROK 3, BARANGAY MAL-CAL, CARDONA, RIZAL25DO0105 · ₱4,900,500.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, SITIO B25DO0028 · ₱4,801,490.41 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, PHASE 125DO0039 · ₱4,781,589.24 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, SITIO H25DO0037 · ₱4,770,773.92 · mapped
Across government
No DepEd or DOH contract awards matched to this name in PhilGEPS records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
