G-RHINO CONST AND SUPPLY is listed as a company organization in Philippine public procurement records on this site, with 38 linked DPWH project(s) totaling about ₱141,190,623.37. Recorded delivery grade A (from public DPWH project records — not a finding of wrongdoing).
G-RHINO CONST AND SUPPLY
AGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 38
- Total value
- ₱141,190,623.37
- Published flags
- 0
- Region
- Bohol 2nd DEO · Region VII
Online presence
Google Maps: G-Rhino Construction & SupplyGoogle Maps, 2026-10-22
Inabanga, Bohol, Philippines
Licensed officers (PCAB)
- Gerino Fabrica Dela Torre · Authorized Managing Officer (PCAB license 40617) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for G-RHINO CONST AND SUPPLY — not an accusation or finding of wrongdoing.
Score: 91.50 / 100 · Projects in sample: 38 · As of Oct 22, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 94.7/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 94.7
- lateCompletedProjects
- 4
- onTimeCompletedProjects
- 34
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 38
- pastTargetOngoingProjects
- 0
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 38
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 38
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 38
- componentScore
- —
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 38
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
37 geotagged projects — Open full map
- CONCRETING OF BRGY. CAMBANSAG TO BRGY. CANSAGUE TO BRGY. BAUNOS FMR, BRGY. CAMBANSAG BRGY. CANSAGUE AND BRGY. BAUNOS, SAN ISIDRO, BOHOL23HC0102 · ₱14,924,981.82 · mapped
- BRIDGE REHABILITAION/MAJOR REPAIR OF PERMANENT BRIDGES KARAPAGAN BRIDGE (B00105BH) ALONG JCT.(TER) JAGNA SIERRA BULLONES ROAD, JAGNA BOHOL KO 070+74319HB0082 · ₱12,676,027.43 · mapped
- MODIFIED STANDARD DPWH-DEPED TWO (2) STOREY FOUR (4) CLASSROOM SCHOOL BUILDING (SCIENCE LABORATORY & ICT LABORATORY) AT SOUTHERN INABANGA HS, SAN JOSE, INABANGA, BOHOL18HC0119 · ₱10,173,476.09 · mapped
- BRIDGE RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES UNTAGA BRIDGE (B00099BH) ALONG JCT DAT-AN CARMEN SIERRA BULLONES PILAR ALICIA ROAD, ALICIA, BOHOL KO 091+24119HB0083 · ₱7,640,950.64 · mapped
- CONSTRUCTION OF (2) 1-STOREY/UNIQUE WORKSHOP BUILDING, 7.00M X 22.50M (MAINLAND) AT NAHAWAN NHS, CLARIN, BOHOL17HC0105 · ₱7,132,458.00 · mapped
- CONSTRUCTION OF EVACUATION CENTER, BRGY. MANSASA, TAGBILARAN CITY, BOHOL23HA0089 · ₱6,872,512.70 · mapped
- BRIDGE-RETROFITTING/STRENGTHENING OF PERMANENT BRIDGE BANBAN I (B00066BH) ALONG TAGBILARAN EAST ROAD (TAGBILARAN-JAGNA), LILA, BOHOL18HB0033 · ₱5,118,784.36 · mapped
- CONSTRUCTION OF MULTI-PURPOSE COVERED COURT AT BOHOL HABITAT CENTER, TAGBILARAN CITY, BOHOL19HA0163 · ₱4,910,807.80 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. TALOTO, TAGBILARAN CITY, BOHOL23HA0078 · ₱4,886,135.59 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) REHABILITATION OF ACCESS ROAD TO KINAHUGAN FALLS, BRGY. CABUNGA-AN, JAGNA, BOHOL23HB0102 · ₱4,878,751.84 · mapped
- CONSTRUCTION OF EVACUATION CENTER IN BARANGAY BOGTONGBOD, CLARIN, BOHOL19HC0098 · ₱4,655,000.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. DAMPAS, TAGBILARAN CITY, BOHOL. PROJECT ID: P00145824VS17HA0066 · ₱4,395,300.00 · mapped
- COMPLETION OF BUENAVISTA PUBLIC MARKET, BUENAVISTA, BOHOL18HC0087 · ₱4,142,301.45 · mapped
- CONSTRUCTION AND/OR REPAIR/REHABILITATION OF MULTI-PURPOSE BUILDING, BRGY. DEL CARMEN WESTE, BALILIHAN, BOHOL20HA0116 · ₱4,033,583.00 · mapped
- REHABILITATION OF MULTI-PURPOSE BUILDING (EVACUATION CENTER), BRGY. UBAY (ISLAND), TUBIGON, BOHOL21HA0077 · ₱3,953,386.32 · mapped
- CONSTRUCTION OF RAINWATER COLLECTOR SYSTEM (RWCS-17 UNITS) AT BOHOL 2ND DISTRICT17HC0056 · ₱3,182,570.00 · mapped
- CONSTRUCTION OF RAINWATER COLLECTOR SYSTEM (RWCS-10 UNITS), BOHOL 2ND DISTRICT18HC0095 · ₱3,118,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM BASIC INFRASTRUCTURE PROGRAM BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES CONSTRUCTION (COMPLETION) OF ROAD OF STA. CRUZ TO SITIO ILAUD, STA. CR23HB0111 · ₱2,940,394.70 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. POBLACION, INABANGA, BOHOL18HC0056 · ₱2,821,500.00 · mapped
- 001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE- REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES- HIBUNAWAN BR. (B00142BH) ALONG JCT. (LIR) BUENAVISTA-CARMEN-DANA0-JETAFE RD.. DANAO, BOHOL19HC0040 · ₱2,789,368.70 · mapped
- RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES OF JUBAY BRIDGE (B00001CB) ALONG CEBU NORTH HAGNAYA WHARF ROAD18HI0016 · ₱2,763,306.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BISU CLARIN CAMPUS, BRGY. POBLACION, CLARIN, BOHOL19HC0009 · ₱2,351,250.32 · mapped
- BRIDGE RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES CABUNGAAN BRIDGE (B00030BH) ALONG TAGBILARAN EAST ROAD, ALICIA, BOHOL KO157+65419HB0084 · ₱2,292,322.77 · mapped
- BRIDGE RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES PANGDAN I (B00050BH) ALONG TAGBILARAN EAST ROAD (TAGBILARAN-JAGNA), JAGNA, BOHOL KO 196+59819HB0121 · ₱2,203,689.16 · mapped
- CONSTRUCTION/REHABILITATION OF MULTI-PURPOSE BUILDING, BRGY. UBUJAN, TAGBILARAN CITY, BOHOL20HA0110 · ₱2,102,835.70 · mapped
- BRIDGE-RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, TAONGON BRIDGE (B00057BH), ALONG TAGBILARAN EAST ROAD (TAGBILARAN-JAGNA), VALENCIA, BOHOL, K0214+71419HB0030 · ₱1,936,471.81 · mapped
- BRIDGE - RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, ANAS BRIDGE (B00058BH) ALONG TAGBILARAN EAST ROAD (TAGBILARAN-JAGNA), VALENCIA, BOHOL, K0215+41319HB0021 · ₱1,936,418.38 · mapped
- BRIDGE-RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, GUINACOT BRIDGE (B00036BH) ALONG TAGBILARAN EAST ROAD, K00179+559, BOHOL PROVINCE18HB0028 · ₱1,902,818.30 · mapped
- BRIDGE - RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, CALINGAN BRIDGE (B00070BH) ALONG TAGBILARAN EAST ROAD (TAGBILARAN - JAGNA) LILA, BOHOL19HB0034 · ₱1,549,060.48 · mapped
- REHABILITATION OF MULTI-PURPOSE BUILDING, (BARANGAY HEALTH CENTER), BRGY. BACANI, CLARIN, BOHOL21HC0152 · ₱1,195,067.43 · mapped
- CONSTRUCTION/IMPROVEMENT OF MULTIPURPOSE BUILDING, SENTINELA, UBAY, BOHOL19HC0156 · ₱976,172.67 · mapped
- CONSTRUCTION/IMPROVEMENT OF MULTIPURPOSE BUILDING, SAN FRANCISCO, UBAY, BOHOL19HC0145 · ₱972,273.25 · mapped
- CONSTRUCTION OF ROAD AT PUROK 4, MAHAYAG ELEMENTARY SCHOOL, BARANGAY CENTRO MAHAYAG, SAN MIGUEL, BOHOL21HC0131 · ₱969,919.09 · mapped
- REHABILITATION OF MULTI-PURPOSE BUILDING, SAN ISIDRO, UBAY, BOHOL21HC0084 · ₱908,864.40 · mapped
- COMPLETION OF SCHOOL BUILDING 2 STOREY 6CL, CORELLA NATIONAL HIGH SCHOOL, CORELLA, BOHOL17HA0111 · ₱497,748.70 · mapped
- RECONSTRUCTION OF MULTI-PURPOSE BUILDING IN BARANGAY POBLACION II, SIKATUNA, BOHOL21HA0109 · ₱497,512.50 · mapped
- COMPLETION OF MULTI-PURPOSE BUILDING (MEAT PROCESSING CENTER/EVACUATION CENTER), POBLACION, CATIGBIAN, BOHOL17HA0071 · ₱490,000.00 · mapped
- COMPLETION OF SCHOOL BUILDING, 2-STOREY-4 CL, LOON SOUTH, NATIONAL HIGH SCHOOL, LOON, BOHOL17HA0079 · ₱398,601.97
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
