SNN BUILDERS AND CONST SUPPLY CORP is listed as a company organization in Philippine public procurement records on this site, with 7 linked DPWH project(s) totaling about ₱59,882,850.91. Recorded delivery grade C (from public DPWH project records — not a finding of wrongdoing).
SNN BUILDERS AND CONST SUPPLY CORP
CGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 7
- Total value
- ₱59,882,850.91
- Published flags
- 0
- Region
- Davao de Oro 1st DEO · Region XI
Licensed officers (PCAB)
- Noel E. Navarro Jr. · Authorized Managing Officer (PCAB license 47996) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for SNN BUILDERS AND CONST SUPPLY CORP — not an accusation or finding of wrongdoing.
Score: 72.70 / 100 · Projects in sample: 7 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 55.6/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 55.6
- lateCompletedProjects
- 0
- onTimeCompletedProjects
- 5
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 7
- pastTargetOngoingProjects
- 2
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 7
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 7
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 7
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 7
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
7 geotagged projects — Open full map · Download projects (CSV)
- COMPLETION OF MPB KOLEHIYO NG PANTUKAN (KNP) DAVAO DE ORO (PHASE 2)21LA0091 · ₱19,577,289.31 · mapped
- CONSTRUCTION OF BRIDGE, BARANGAY BAGONG SILANG, LAAK, DAVAO DE ORO24LA0114 · ₱9,890,000.01 · mapped
- CONSTRUCTION OF RETAINING WALL ALONG ASUNCION-LAAK-VERUELA ROAD, LIBUTON SECTION, LAAK, DAVAO DE ORO21LA0235 · ₱9,740,605.40 · mapped
- CONSTRUCTION OF MPB (BRGY. HALL) AGUINALDO, LAAK, DAVAO DE ORO21LA0139 · ₱6,859,678.16 · mapped
- Construction/Revetment of Piasusuan River, Brgy. Napnapan, Pantukan, Davao de Oro21LA0134 · ₱5,914,418.11 · mapped
- CONSTRUCTION OF FOOTBRIDGE, PIASUSUAN ES, BRGY. NAPNAPAN, PANTUKAN, DAVAO DE ORO21LA0099 · ₱3,950,874.18 · mapped
- REHABILITATION OF (COMPLETION) MULTI-PURPOSE BUILDING, BARANGAY BULLUCAN ELEMENTARY SCHOOL, LAAK, DAVAO DE ORO25LA0086 · ₱3,949,985.74 · mapped
Equipment & capacity
PCAB license
- License no.
- 47996
- Category
- C · Small B
- Minimum net worth for this category
- ₱6,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱30M
- License valid until
- Feb 26, 2027
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 47996); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
No CPES evaluation lists this contractor's PCAB license in the GPPB releases we loaded (34th–41st).
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
- DPWH Infrastructure: 7 awards · ₱59,862,778.76
- Municipality of Sto. Tomas, Davao Del Norte Infrastructure: 6 awards · ₱31,733,367.54
- Municipality of Maco, Compostela Valley Goods & services: 11 awards · ₱11,055,849.20
- Municipality of Maco, Compostela Valley Infrastructure: 3 awards · ₱8,607,546.47
- City of Tagum Goods & services: 4 awards · ₱921,340.20
- Municipality of Braulio Dujali, Davao Del Norte Goods & services: 2 awards · ₱187,003.00
- 25LA0086₱3,949,985.74· 2025-06-30· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - DAVAO DE ORO 1ST D
- Contract for the Construction of Slope Protection
- Contract for the Upgrading of Multi-Purpose Buildi
- Contract for the Construction of Multi-Purpose Hal
- CONSTRUCTION OF INTEGRATED SOLID WASTE MANAGEMENT
- Contract for the Rehab./Upgrading of Water System
- 24LA0114₱9,890,000.01· 2024-07-15· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - DAVAO DE ORO 1ST D
- Contract for the Upgrading of Multi-Purpose Buildi
- Construction of Balutan sa Maco Phase 3 (Materials, Labor & Equipment Rental) at Poblacion, Maco, Davao de Oro
- REPAIR & IMPROVEMENT OF GOVERNMENT FACILITIES
- Repair & Maintenance of Electrical Wirings (Materials) at Municipal Hall, Maco, Davao de Oro
- Construction of Maco de Oro College (Materials, Labor & Equipment Rental) at Hijo, Maco, Davao de Oro
- CONSTRUCTION OF DRAINAGE CANAL CARLOS RIMANDO ROAD
- Construction Materials for the Eco-bricks making a
- Materials for Rehabilitation of people's cultural
- CONSTRUCTION OF MACO DE ORO COLLEGE (PHASE 2) MATERIALS,LABOR & EQUIPMENT RENTAL AT HIJO,MACO DAVAO DE ORO
- CONSTRUCTION OF LEVEL 3 POTABLE WATER SYSTEM.
- const.of school building(makeshift building) (materials,labor & equipment rental at Panibasan National High School,Panibasan,Maco Davao de Oro
- Materials for Installation of Ware pipelines SHORELINES AND EASTERNLINES BARANGAYS
- Materials for Installation of Ware pipelines at Masara Line Barangays
- REPAIR & IMPROVEMENT OF GOVERNMENT FACILITIES
- Const. of MGADRC Office and Womens Livelihood Center (materials , labor and equipment rental at Ernand compound, Binuangan,Maco dAVAO DE oRO
- REHABILITATION OF HANGING BRIDGE (MATERIALS, LABOR & EQUIPMENT RENTAL) AT PRK. 4, PANIBASAN, MACO, DAVAO DE ORO
- Construction of Drainage Canal Lining (materials, labor & equipment rental) at Prk. 1 & 3, Lapu-Lapu, Maco, Davao de Oro
- CONSTRUCTION MATERIALS & SUPPLIES
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →