DIADEMA CONST AND ENT INC FORMERLY: DIADEMA ENT is listed as a company organization in Philippine public procurement records on this site, with 127 linked DPWH project(s) totaling about ₱3,819,440,526.94. Recorded delivery grade C (from public DPWH project records — not a finding of wrongdoing).
DIADEMA CONST AND ENT INC FORMERLY: DIADEMA ENT
CGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 127
- Total value
- ₱3,819,440,526.94
- Published flags
- 2
- Region
- Metro Manila 3rd DEO · National Capital Region
Public Record Grade
A transparent, data-derived summary of reported public records for DIADEMA CONST AND ENT INC FORMERLY: DIADEMA ENT — not an accusation or finding of wrongdoing.
Score: 72.00 / 100 · Projects in sample: 127 · As of Oct 28, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 41.5/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 41.5
- lateCompletedProjects
- 17
- onTimeCompletedProjects
- 57
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 116
- pastTargetOngoingProjects
- 42
- undatedCompletedProjectsExcluded
- 11
- Termination rate
Component score: 100/100 · Weight: 21%
- totalProjects
- 127
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 127
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 99.5/100 · Weight: 11%
- projects
- 127
- componentScore
- 99.5
- flagsPerProject
- 0.02
- publishedV2Flags
- 2
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 127
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 49 of 122 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- CONSTRUCTION OF SCHOOL BUILDING BIGNAY NATIONAL HIGH SCHOOL, BRGY. BIGNAY, VALENZUELA CITY25OD0338 · ₱106,917,520.84 · mapped
- REHABILITATION OF HANDEL STREET TO LISZT STREET, IDEAL, COMMONWEALTH, QUEZON CITY25OF0147 · ₱97,019,805.92 · mapped
- CONSTRUCTION OF FLOOD STRUCTURE ALONG MARIKINA RIVER, BARANGAY BAGONG SILANGAN, QUEZON CITY25OF0041 · ₱95,524,969.45 · mapped
- IMPROVEMENT OF FLOOD CONTROL RIVER WALL ALONG TULLAHAN RIVER, STA. 01+050 TO STA. 01+400, VALENZUELA CITY25OD0128 · ₱94,809,489.55 · mapped
- CONSTRUCTION OF FLOOD CONTROL WALL ALONG POLO RIVER (PHASE 12), VALENZUELA CITY25OD0054 · ₱94,808,880.04 · mapped
- CONSTRUCTION OF FLOOD CONTROL WALL ALONG POLO RIVER (PHASE 13), VALENZUELA CITY25OD0055 · ₱94,804,433.66 · mapped
- IMPROVEMENT OF FLOOD CONTROL RIVER WALL ALONG TULLAHAN RIVER, STA. 03+500 TO STA. 03+850, VALENZUELA CITY25OD0134 · ₱94,803,405.17 · mapped
- CONSTRUCTION OF FLOOD CONTROL WALL ALONG POLO RIVER (PHASE 14), VALENZUELA CITY25OD0056 · ₱94,801,235.31 · mapped
- CONSTRUCTION OF FLOOD CONTROL WALL ALONG POLO RIVER (PHASE 15), VALENZUELA CITY25OD0057 · ₱94,797,026.98 · mapped
- CONSTRUCTION OF FLOOD CONTROL WALL ALONG POLO RIVER (PHASE 7), VALENZUELA CITY24OD0051 · ₱94,089,630.45 · mapped
- CONSTRUCTION OF FLOOD CONTROL WALL ALONG POLO RIVER (PHASE 6), VALENZUELA CITY24OD0050 · ₱94,080,788.77 · mapped
- CONSTRUCTION OF FLOOD CONTROL WALL ALONG POLO RIVER (PHASE 8), VALENZUELA CITY24OD0052 · ₱94,079,101.13 · mapped
- CONSTRUCTION OF FLOOD CONTROL WALL ALONG POLO RIVER (PHASE 16), VALENZUELA CITY25OD0142 · ₱90,123,600.81 · mapped
- Construction of Flood Control Wall along Sampaguita Creek, Caloocan City23OD0074 · ₱89,280,149.46 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, (3S PINALAGAD BUILDING, FIRE, HEALTH AND DAYCARE) MALINTA, VALENZUELA CITY24OD0255 · ₱77,689,630.93 · mapped
- REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS, NOVALICHES-SN JOSE RD - K0026 + 737 - K0027 + 980, CALOOCAN CITY23OD0075 · ₱76,369,874.22 · mapped
- CONSTRUCTION OF SCHOOL BUILDING AT GEN. T. DE LEON NATIONAL HIGH SCHOOL, VALENZUELA CITY25OD0315 · ₱66,874,851.92 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (POOK PAG-ASA GYMNASIUM), BRGY. BATASAN HILLS, QUEZON CITY23OF0088 · ₱66,198,475.50 · mapped
- REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS MAC ARTHUR H-WAY - K0016 + 009 - K0016 + 52925OD0083 · ₱60,319,991.14 · mapped
- CONSTRUCTION OF SCHOOL BUILDING AT TAGALAG ELEMENTARY SCHOOL, BARANGAY TAGALAG, VALENZUELA CITY25OD0298 · ₱57,395,656.70 · mapped
- CONSTRUTION OF SCHOOL BUILDING AT DALANDANAN NATIONAL HIGH SCHOOL (BLDG 1), BRGY. DALANDANAN, VALENZUELA CITY25OD0300 · ₱57,394,372.50 · mapped
- CONSTRUCTION OF SCHOOL BUILDING AT DALANDANAN NATIONAL HIGH SCHOOL (BLDG 2), BRGY. DALANDANAN, VALENZUELA CITY25OD0299 · ₱57,392,344.15 · mapped
- Construction of Flood Control Wall along Orosco Creek, Phase 2, Valenzuela City23OD0001 · ₱57,081,541.95 · mapped
- CONSTRUCTION (COMPLETION) OF MULTI - PURPOSE BUILDING, BARANGAY NORTH FAIRVIEW (PHASE 2), QUEZON CITY23OF0045 · ₱56,718,718.18 · mapped
- CONSTRUCTION OF 4STY16CL, APOLONIA F. RAFAEL ELEMENTARY SCHOOL (PHASE I), CITY OF VALENZUELA24OD0296 · ₱51,886,474.07 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM CONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM - TIKAS) REHABILITATION OF PHILIPPINE ARMY CAMP, CARMEN, BOHOL23HB0116 · ₱48,999,999.81
- COMPLETION OF MULTI-PURPOSE BUILDING (3S CENTER BUILDING) AT BARANGAY VIENTE REALES, VALENZUELA CITY25OD0321 · ₱48,588,747.18 · mapped
- CONST. OF FLOOD CONTROL STRUCTURES ALONG LAGUNA DE BAY, STA. 0+000-A TO STA. 0+080-A, BRGY. ALABANG,18OI0038 · ₱48,525,578.28 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY BAESA, QUEZON CITY23OF0123 · ₱48,509,063.32 · mapped
- IMPROVEMENT OF ROAD, LIBIS 1 & 2, PHASE II, BARANGAY CANUMAY EAST, VALENZUELA CITY24OD0048 · ₱48,505,502.89 · mapped
- Construction of Flood Control Structure and Tributaries at Barangay Batasan Hills, Quezon City (Phase 8)23OF0035 · ₱48,440,881.00 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CREEKS OF AMPARO SUBDIVISION, BARANGAY 179, CALOOCAN CITY25OD0249 · ₱47,998,149.25 · mapped
- Construction of Flood Control Structure, Sta. 0 + 000 - Sta. 0 + 200, Barangay 178, Caloocan City24OD0181 · ₱47,851,161.52 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (SCHOOL BUILDING), PUNTURIN ELEMENTARY SCHOOL, PUNTURIN, VALENZUELA CITY24OD0171 · ₱46,638,351.71 · mapped
- CONSTRUCTION OF SCHOOL BUILDING AT DISIPLINA VILLAGE ELEMENTARY SCHOOL, BRGY. BIGNAY, VALENZUELA CITY25OD0330 · ₱45,917,062.36 · mapped
- CONSTRUCTION OF ACCESS ROAD LEADING TO SITIO MANGGAHAN AND BRGY. DARAITAN, TANAY, RIZAL22D00059 · ₱45,396,940.26 · mapped
- OFF-CARRIAGEWAY IMPROVMENT - SECONDARY ROADS MINDANAO AVE K0019 + (-309) - K0019 + 898, (S05631LZ) CHAINAGE 0 - CHAINAGE 598, (S05632LZ) CHAINAGE 0 - CHAINAGE 49724OD0088 · ₱44,280,340.21 · mapped
- CONSTRUCTION OF 4STY12CL, MANUEL L. QUEZON ES (PHASE I), CALOOCAN CITY24OD0298 · ₱44,083,387.04 · mapped
- CONSTRUCTION OF SCHOOL BUILDING AT COLOONG ELEMENTARY SCHOOL, BARANGAY COLOONG, VALENZUELA CITY25OD0303 · ₱43,046,693.15 · mapped
- CONSTRUCTION OF SCHOOL BUILDING AT POLO NATIONAL HIGH SCHOOL, BARANGAY PALASAN, VALENZUELA CITY25OD0304 · ₱43,031,938.25 · mapped
- Construction of Slope Protection Structure along Marikina River, Barangay Bagong Silangan, Quezon City23OF0036 · ₱42,762,228.48 · mapped
- REHABILITATION OF MULTI-PURPOSE FACILITY, GLORIETTA TALA, BRGY. 188, CALOOCAN CITY (PHASE 2)24OD0188 · ₱39,015,634.21 · mapped
- CONSTRUCTION OF MULTI-PURPOSE 4 STOREY-BUILDING, AGUINALDO ELEMENTARY SCHOOL, BRGY. SAN ROQUE, QUEZON CITY23OG0090 · ₱38,403,787.67 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (SCHOOL BUILDING), ROBERTA DE JESUS, ELEMENTARY SCHOOL, BIGNAY, VALENZUELA CITY24OD0168 · ₱33,989,976.66 · mapped
- CONSTRUCTION OF SCHOOL BUILDING AT DISIPLINA VILLAGE NATIONAL HIGH SCHOOL, BRGY. BIGNAY, VALENZUELA CITY25OD0319 · ₱33,476,962.10 · mapped
- LOCAL PROGRAM - NATIONAL BUILDING PROGRAM -BUILDINGS AND OTHER STRUCTURES - MULTI-PURPOSE FACILITIES - CONSTRUCTION OF QAS LABORATORY BUILDING, DPWH BOHOL 3RD DEO, GUINDULMAN, BOHOL24HB0074 · ₱29,399,999.94 · mapped
- LOCAL PROGRAM - NATIONAL BUILDING PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE / FACILITIES - CONSTRUCTION OF DPWH BOHOL 3RD DEO, ANNEX BUILDING, GUINDULMAN, BOHOL24HB0062 · ₱29,368,336.24 · mapped
- CONSTRUCTION OF NEW ADMINISTRATIVE BUILDING - UNIT 2, BUREAU OF ANIMAL INDUSTRY - DEPARTMENT OF AGRICULTURE (PHASE 2), MARULAS, VALENZUELA CITY24OD0081 · ₱29,194,493.91 · mapped
- CONSTRUCTION OF NEW ADMINISTRATIVE BUILDING - UNIT 1, BUREAU OF ANIMAL INDUSTRY - DEPARTMENT OF AGRICULTURE (PHASE 2), MARULAS, VALENZUELA CITY24OD0080 · ₱29,194,118.54 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CASILI CREEK, CALOOCAN CITY25OD0209 · ₱28,809,766.38 · mapped
Equipment & capacity
PCAB license
- License no.
- 16759
- Category
- A · Medium B
- Minimum net worth for this category
- ₱30,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱300M
- License valid until
- Jul 30, 2029
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 16759); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
5 evaluations listed across 3 GPPB CPES releases; average final rating 96.9% over 1 rated project; 5 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Jun 26, 2025 | DPWH | ₱29,368,336.00 | Completed | 99.4% | 96.9% | 40th, p. 79 |
| Jun 4, 2025 | DPWH | ₱29,399,999.00 | On-going | 94.0% | — | 40th, p. 79 |
| Jul 29, 2024 | DPWH | ₱94,080,790.00 | On-going | 94.8% | — | 38th, p. 59 |
| Feb 20, 2024 | NHA (JV) | ₱44,198,100.00 | On-going | 91.0% | — | 37th, p. 28 |
| Aug 29, 2019 | DPWH | ₱23,622,890.00 | On-going | 89.1% | — | 37th, p. 28 |
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →