ALTIUS TRADING is listed as a company organization in Philippine public procurement records on this site, with 63 linked DPWH project(s) totaling about ₱577,822,366.73. Recorded delivery grade C (from public DPWH project records — not a finding of wrongdoing).
ALTIUS TRADING
CGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 63
- Total value
- ₱577,822,366.73
- Published flags
- 0
- Region
- Quezon City 1st DEO · National Capital Region
Public Record Grade
A transparent, data-derived summary of reported public records for ALTIUS TRADING — not an accusation or finding of wrongdoing.
Score: 76.80 / 100 · Projects in sample: 63 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 60.4/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 60.4
- lateCompletedProjects
- 29
- onTimeCompletedProjects
- 26
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 61
- pastTargetOngoingProjects
- 6
- undatedCompletedProjectsExcluded
- 1
- Termination rate
Component score: 95.2/100 · Weight: 24%
- totalProjects
- 63
- componentScore
- 95.2
- terminatedProjects
- 1
- terminationRatePct
- 1.6
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 62
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 63
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 63
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 45 of 51 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- DRAINANGE IMPROVEMENT AND CONCRETING OF VARIOUS ROADS AT BARANGAY SANGANDAAN, QUEZON CITY25OF0214 · ₱48,019,896.90 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING AT CENTERVILLE (PHASE 2), BRGY. PASONG TAMO, QUEZON CITY24OF0219 · ₱29,402,986.28 · mapped
- REHABILITATION OF PASONG TAMO CREEK, BRGY. CULIAT, Q.C.19OF0059 · ₱24,548,833.00 · mapped
- CONSTRUCTION OF DRAINAGE SYSTEMS AT KAINGIN ROAD, BRGY. APOLONIO SAMSON, QUEZON CITY24OF0220 · ₱24,239,893.55 · mapped
- REHABILITATION OF MENDEZ CREEK, BARANGAY BAESA, QUEZON CITY21OF0149 · ₱24,005,918.81 · mapped
- CONSTRUCTION OF CONCRETE ROAD WITH DRAINAGE AT BARANGAY SAUYO, QUEZON CITY25OF0068 · ₱19,407,746.79 · mapped
- CONSTRUCTION OF DRAINAGE SYSTEMS AT CMP 1, BRGY. BAESA, QUEZON CITY24OF0073 · ₱19,374,496.50 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (PHASE II), BRGY. DEL MONTE, QUEZON CITY20OF0213 · ₱17,285,391.77 · mapped
- CONVERGENCE & SPECIAL SUPPORT PROGRAM-CONST./IMPR'VT. OF VARIOUS INFRASTRUCTURE IN SUPPORT OF NATIONAL SECURITY-CONST. OF GUAGUA MPS BUILDING, GUAGUA, PAMPANGA, PROVINCE OF PAMPANGA20C00026 · ₱14,590,101.44 · mapped
- REHABILITATION OF GOODWILL CREEK, BRGY. BAGBAG, QUEZON CITY19OF0054 · ₱14,480,000.00 · mapped
- CONSTRUCTION OF SLOPE PROTECTION GOODWILL CREEK, BRGY. BAGBAG, Q.C.18OF0109 · ₱13,818,000.00 · mapped
- REAHBILITATION OF GOODWILL CREEK WITH EXCEPTION AT BRGY. BAGBAG, QUEZON CITY17OF0107 · ₱13,739,630.00 · mapped
- CONSTRUCTION/ IMPROVEMENT OF ROADS AT AMBUKLAO STREET AT BARABGAY PASONG TAMO, QUEZON CITY22OF0144 · ₱12,859,000.00 · mapped
- COMPLETION OF SCHOOL BUILDING AT ADDITION HILLS INTEGRATED SCHOOL, BRGY. ADDITION HILLS, MANDALUYONG CITY16OB0036 · ₱11,209,435.00 · mapped
- CONSTRUCTION OF MPB (LIVELIHOOD COMMON FACILITY AREA) CASSANOVA BRGY. CULIAT, Q.C.16OF0056 · ₱11,000,765.12
- REHABILITATION OF MULTI-PURPOSE BUILDING, BARANGAY PALTOK, QUEZON CITY22OF0086 · ₱9,799,978.55 · mapped
- CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, BRGY. BALONBATO, QUEZON CITY24OF0109 · ₱9,798,989.98 · mapped
- REHABILITATION OF ROAD (PHASE 2) AT BARANGAY TALAYAN, QUEZON CITY25OF0022 · ₱9,750,055.39 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (RESCUE SATELITE OFFICE) AT BARANGAY SAUYO, QUEZON CITY22OF0129 · ₱9,515,324.90 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING AT PLEASANT VILLE, BRGY. TALIPAPA, QUEZON CITY20OF0222 · ₱9,506,000.00 · mapped
- CONSTRUCTION/ REHABILITATION OF MPB BRGY. PALTOK, Q.C.19OF0078 · ₱9,506,000.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING AT PLEASANT VILLE, BRGY. TALIPAPA, QUEZON CITY20OF0223 · ₱9,506,000.00 · mapped
- REHABILITATION OF GRIPO CREEK, BRGY. TANDANG SORA, Q.C.19OF0056 · ₱9,410,273.00 · mapped
- CONST. OF 4-STOREY, 32 CLASSROOM SCHOOL BUILDING (INCLUDING SITE DEVELOPMENT) AND COMPLETION OF FACILITIES AT MATAAS NA PAARALANG NEPTALI A. GONZALES, BARANGAY MAUWAY, MANDALUYONG CITY16OB0052 · ₱9,360,474.55 · mapped
- REHABILITATION OF MULTI-PURPOSE BUILDING, PHASE II, BARANGAY DEL MONTE, QUEZON CITY22OF0087 · ₱9,206,869.80 · mapped
- EXPANSION/CONSTRUCTION OF TB-DOST, TALIPAPA HEALTH CENTER, QUEZON CITY17OF0117 · ₱9,172,691.75 · mapped
- CONSTRUCTION OF ROADS, PATHWALKS AND DRAINAGE SYSTEM BARANGAY 176, CALOOCAN CITY19OD0037 · ₱8,578,289.81 · mapped
- CONSTRUCTION OF 4-STOREY, 20-CLASSROOM SCHOOL BUILDING AT HULO ELEMENTARY SCHOOL (INCLUDING SITE DEVELOPMENT), BRGY. HULO, MANDALUYONG CITY15OB0456 · ₱8,424,443.06 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING AT NPC, BRGY. TANDANG SORA, QUEZON CITY20OF0221 · ₱7,526,400.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING ZT VILLA FERENZE, CULIAT, QUEZON CITY20OF0132 · ₱6,757,100.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. TALIPAPA, Q.C.19OF0184 · ₱6,756,750.00 · mapped
- REPAIR/REHABILITATION OF SCHOOL BUILDING AND COMPLETION OF FACILITIES AT EULOGIO RODRIGUEZ INTEGRATED SCHOOL BARANGAY HAGDAN BATO ITAAS, MANDALUYONG CITY LD15OB0360 · ₱6,742,109.32 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING AT METRO HEIGHTS ADELFA, BRGY. CULIAT, QUEZON CITY21OF0095 · ₱6,722,024.64 · mapped
- REHABILITATION OF FERN VILLAGE ROAD (NARRA AVE. TO GATE), BRGY. PASONG TAMO, Q.C.19OF0113 · ₱6,651,929.00 · mapped
- CONSTRUCTION OF MULTI - PURPOSE BUILDING, BRGY. PHIL-AM, Q.C.18OF0177 · ₱6,306,153.00 · mapped
- CONSTRUCTION OF MPB AT TIERRA VERDE 2, BRGY. PASONG TAMO, Q.C.16OF0030 · ₱5,912,682.87
- REHABILITATION OF MULTI - PURPOSE BUILDING AT SAN JOSE ELEMENTARY SCHOOL, BRGY. SAN JOSE, Q.C.19OF0094 · ₱5,762,400.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING LELAND DRIVE BRGY. BALON-BATO, Q.C.17OF0020 · ₱5,702,352.00 · mapped
- CONSTRUCTION OF MPB AT MARCEL SUBD., BRGY. PASONG TAMO, Q.C16OF0029 · ₱5,442,180.48
- CONSTRUCTION OF MULTI - PURPOSE BUILDING AT SAN JOSE (H/S), Q.C.18OF0138 · ₱5,335,445.84 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING AT VILLA SABINA SUBDIVISION, BRGY. TALIPAPA, QUEZON CITY20OF0142 · ₱4,801,500.00 · mapped
- REHABILITATION OF MULTI-PURPOSE BUILDING, BARANGAY BAGONG PAG-ASA, QUEZON CITY21OF0147 · ₱4,801,500.00 · mapped
- CONSTRUCTION/ REHABILITATION OF MULTI-PURPOSE BUILDING AT BRGY. TALAYAN, QUEZON CITY21OF0073 · ₱4,800,550.86 · mapped
- CONSTRUCTION/ REHABILITATION OF MPB, BRGY. PALTOK, QUEZON CITY19OF0156 · ₱4,796,000.00 · mapped
- CONSTRUCTION/ REHABILITATION OF MULTI - PURPOSE BUILDING (COVERED COURT), BRGY. STA. CRUZ, Q.C.19OF0072 · ₱4,777,500.00 · mapped
- REHABILITATION OF MULTI-PURPOSE BUILDING AT BRGY. ALICIA, QUEZON CITY20OF0078 · ₱4,752,903.00 · mapped
- REHABILITATION OF MULTI-PURPOSE BUILDING AT BRGY. MANRESA, QUEZON CITY20OF0081 · ₱4,752,854.50 · mapped
- REHABILITATION OF MULTI-PURPOSE BUILDING AT BRGY. DEL MONTE, QUEZON CITY20OF0080 · ₱4,751,904.00 · mapped
- CONSTRUCTION OF 2-STOREY MULTI-PURPOSE BUILDING OF POPULATION COMMISSION, BARANGAY ADDITION HILLS, MANDALUYONG CITY16OB0104 · ₱4,648,452.85
- CONSTRUCTION OF MPB AT PUROK 4 CULIAT, Q.C.15OF0267 · ₱4,583,560.00
Equipment & capacity
PCAB license
No PCAB license is linked to this record. It may be a joint venture, a foreign firm, or a name we could not match. Search PCAB.
Government performance ratings (CPES)
No CPES evaluation lists this contractor's PCAB license in the GPPB releases we loaded (34th–41st).
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →