ROBI BUILDERS AND SUPPLY is listed as a company organization in Philippine public procurement records on this site, with 19 linked DPWH project(s) totaling about ₱95,061,748.01. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
ROBI BUILDERS AND SUPPLY
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 19
- Total value
- ₱95,061,748.01
- Published flags
- 0
- Region
- Malabon-Navotas DEO · National Capital Region
Online presence
Google Maps: Robig Builders and Development Corporation★ 5 (7 reviews)Google Maps, 2026-10-22
27 Santa Catalina St, Pasig, Metro Manila
Public Record Grade
A transparent, data-derived summary of reported public records for ROBI BUILDERS AND SUPPLY — not an accusation or finding of wrongdoing.
Score: 89.70 / 100 · Projects in sample: 19 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 100/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 100
- lateCompletedProjects
- 0
- onTimeCompletedProjects
- 19
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 19
- pastTargetOngoingProjects
- 0
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 19
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 19
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 19
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 19
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
19 geotagged projects — Open full map · Download projects (CSV)
- CONST. OF MULTI PURPOSE BLDG (MPB) BRGY. TONSUYA, MALABON CITY21OA0022 · ₱17,815,002.36 · mapped
- CONSTRUCTION OF TANONG MPB (BRGY. HALL) BRGY. TANONG, MALABON CITY20OA0047 · ₱11,877,614.95 · mapped
- CONSTRUCTION OF DRAINAGE SYSTEM, MAYON ST. AND BANAHAW ST., SITIO WAWA, BRGY. LIBIS BINANGONAN, RIZAL21DN0056 · ₱6,721,199.13 · mapped
- CONSTRUCTION OF LOCAL ROAD, CAPULONG ST., BARANGAY SAN RAFAEL VILLAGE, NAVOTAS CITY20OA0011 · ₱5,927,011.54 · mapped
- CONST. OF LOCAL ROAD, FELIX ST., BRGY. SAN RAFAEL VILLAGE, NAVOTAS CITY20OA0029 · ₱5,610,750.89 · mapped
- REHAB. OF ROAD, KARPA ALLEY (DALAGANG BUKID ST. TO DALAG ST.) BRGY. NBBS DAGAT-DAGATAN, NAV. CITY20OA0030 · ₱4,906,678.56 · mapped
- IMPROVEMENT OF LOCAL ROAD INCLUDING DRAINAGE, BONGA MENOR, BUSTOS, BULACAN20CC0283 · ₱4,825,000.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BLDG. BLK 14 BRGY. LONGOS, MALABON CITY19OA0058 · ₱4,796,437.89 · mapped
- RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, TALAMPAS BR. (B01719LZ) ALONG GENERAL ALEJO SANTOS HIGHWAY, BUSTOS, BULACAN20CC0071 · ₱4,763,134.00 · mapped
- RETROFFING/STRENGTHENING OF PERMANENT BRIDGE, UPPER BULI BRIDGE (WEST) (B01850LZ) ALONG SOUTH SUPER H-WAY WEST SERVICE RD, MUNTINLUPA CITY20OI0078 · ₱4,650,040.50 · mapped
- CONSTRUCTION/CONCRETING OF ROAD AT BRGY. BUISAN, BUSTOS, BULACAN20CC0155 · ₱3,880,545.77 · mapped
- CONSTRUCTION OF RAINWATER COLLECTOR SYSTEM (RWCS), PARAÑAQUE CITY AND MAKATI CITY, METRO MANILA19OC0211 · ₱3,681,926.24 · mapped
- REHABILITATION/UPGRADING AND DRAINAGE IMPROVEMENT OF BRIDAL BOUQUET STREET, AFRICAN DAISY STREET AND ITS VICINITY, BRGY. PEMBO,MAKATI CITY, METRO MANILA19OC0194 · ₱2,851,696.64 · mapped
- IMPROVEMENT OF MULTI-PURPOSE BUILDING, BRGY. SOCORRO, QUEZON CITY19OG0104 · ₱2,821,364.49 · mapped
- REHABILITATION OF MULTI-PURPOSE BUILDING, BRGY. QUIRINO 2B, QUEZON CITY19OG0103 · ₱2,820,598.52 · mapped
- RETROFITTING/STRENGTHENING OF PUBLIC BUILDING IN PREPARATION FOR THE 'BIG ONE', MUNTINLUPA NATIONAL HIGH SCHOOL ADMIN. BUILDING, POBLACION, MUNTINLUPA CITY20OI0147 · ₱2,383,410.75 · mapped
- REHABILITATION OF DRAINAGE CANAL AT BRGY. CORAZON, CALUMPIT, BULACAN20CC0015 · ₱1,930,101.21 · mapped
- RETROFFITING/STRENGTENING OF PERMANENT BRIDGE, UPPER BULI BRIDGE (EAST) (B01812LZ) ALONG SOUTH SUPER H-WAY EAST SERVICE, ROAD, MUNTINLUPA CITY20OI0077 · ₱1,860,034.01 · mapped
- REHABILITATION OF MULTI-PURPOSE BUILDING (COVERED COURT) BRGY. SAN JUAN, BALAGTAS, BULACAN19CC0073 · ₱939,200.56 · mapped
Equipment & capacity
PCAB license
No PCAB license is linked to this record. It may be a joint venture, a foreign firm, or a name we could not match. Search PCAB.
Government performance ratings (CPES)
No CPES evaluation lists this contractor's PCAB license in the GPPB releases we loaded (34th–41st).
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
- Various Office Supply
- Office Supplies and Devices
- Office Supplies and Devices
- 21OA0022₱17,446,901.00· 2021-03-04· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - MALABON-NAVOTAS SD
- 21DN0056₱6,721,199.13· 2021-02-09· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - RIZAL 1ST ED
- 20OI0147₱2,383,410.75· 2020-12-29· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - LAS PINAS- MUNTINL
- 20OI0133₱558,445.76· 2020-09-23· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - LAS PINAS- MUNTINL
- Bonga Menor, Bustos, Bulacan₱4,719,951.81· 2020-08-18· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BULACAN 1ST DEO
- 20OA0047₱11,634,062.90· 2020-02-20· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - MALABON-NAVOTAS SD
- 20OA0029₱5,546,668.21· 2020-01-31· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - MALABON-NAVOTAS SD
- 20OA0011₱5,815,113.43· 2020-01-31· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - MALABON-NAVOTAS SD
- 20OA0030₱4,845,903.65· 2020-01-31· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - MALABON-NAVOTAS SD
- 20OI0078₱4,650,040.50· 2020-01-30· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - LAS PINAS- MUNTINL
- 20OI0077₱1,860,034.01· 2020-01-30· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - LAS PINAS- MUNTINL
- Corazon, Calumpit, Bulacan₱1,930,101.21· 2020-01-28· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BULACAN 1ST DEO
- Talampas Br. (B01719LZ)₱4,763,134.00· 2020-01-27· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BULACAN 1ST DEO
- 19OI0175₱1,857,791.80· 2019-11-29· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - LAS PINAS- MUNTINL
- 19OI0173₱558,560.57· 2019-11-06· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - LAS PINAS- MUNTINL
- 19OI0171₱1,859,985.56· 2019-10-25· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - LAS PINAS- MUNTINL
- 19OI0174₱697,796.33· 2019-10-25· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - LAS PINAS- MUNTINL
- 19OI0169₱465,319.46· 2019-10-16· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - LAS PINAS- MUNTINL
- 19OI0168₱3,258,082.56· 2019-10-16· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - LAS PINAS- MUNTINL
- 19OI0170₱694,199.20· 2019-10-16· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - LAS PINAS- MUNTINL
- 19OI0167₱464,818.16· 2019-10-16· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - LAS PINAS- MUNTINL
- 19OI0156₱697,580.55· 2019-09-19· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - LAS PINAS- MUNTINL
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →