MAIR CONST AND GEN MERCHANDISE is listed as a company organization in Philippine public procurement records on this site, with 43 linked DPWH project(s) totaling about ₱473,437,515.51. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
MAIR CONST AND GEN MERCHANDISE
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 43
- Total value
- ₱473,437,515.51
- Published flags
- 0
- Region
- Agusan del Sur 1st DEO · Region XIII
Online presence
mairconstruction.comGoogle Maps business profile, 2026-10-22
Google Maps: MAIR CONSTRUCTION AND GENERAL MERCHANDISEGoogle Maps, 2026-10-22
P4-A, Poblacion, City of Bayugan, Agusan del Sur
Licensed officers (PCAB)
- Ian Pia Cabuntocan · Authorized Managing Officer (PCAB license 41232) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for MAIR CONST AND GEN MERCHANDISE — not an accusation or finding of wrongdoing.
Score: 81.00 / 100 · Projects in sample: 43 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 69/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 69
- lateCompletedProjects
- 3
- onTimeCompletedProjects
- 33
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 43
- pastTargetOngoingProjects
- 7
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 43
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 43
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 43
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 43
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
37 geotagged projects — Open full map · Download projects (CSV)
- CONSTRUCTION OF DUGMANON-TIWI ROAD SECTION, HINATUAN, SURIGAO DEL SUR25NI0051 · ₱48,889,611.41 · mapped
- CONCRETING OF NRJ DEL MONTE-KIDIJAY LIMOT ROAD LEADING TO CANYONEERING ADVENTURE, VERUELA, AGUSAN DEL SUR24NC0032 · ₱48,249,999.77 · mapped
- BUTUAN CITY-TALACOGON-LORETO-VERUELA-STA. JOSEFA RD K1281+955 - K1281+991, K1292+482 - K1292+495.70, ESPERANZA, AGUSAN DEL SUR25NB0029 · ₱24,494,212.36 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG GIBONG RIVER, BARANGAY POBLACION, PROSPERIDAD, AGUSAN DEL SUR, PROSPERIDAD, AGUSAN DEL SUR25NB0024 · ₱19,592,901.10 · mapped
- IMPROVEMENT OF FIRING RANGE (PISTOL AND KNOWN DISTANCE RANGE), 401ST INFANTRY (UNITE N FIGHT) BRIGADE, 4ID, PA, CAMP DATU LIPUS MAKAPANDONG, BRGY. AWA, PROSPERIDAD, AGUSAN DEL SUR25N00201 · ₱18,720,989.51
- REHABILITATION OF PAVED ROAD - DAANG MAHARLIKA (AGUSAN-DAVAO SECT) K1250+098.00 - K1250+589.50, SIBAGAT, AGUSAN DEL SUR23NB0062 · ₱15,635,889.18 · mapped
- CONCRETING OF BRGY. CAGBAS FMR, BRGY. CAGBAS, BAYUGAN CITY, AGUSAN DEL SUR24NB0059 · ₱14,919,150.11 · mapped
- CONCRETING OF NRJ DON ALEJANDRO TO BRGY. BAYLO FMR, SAN LUIS, AGUSAN DEL SUR24NB0058 · ₱14,914,763.41 · mapped
- CONSTRUCTION OF ROAD ALONG DON PEDRO, SAN LUIS, AGUSAN DEL SUR, SAN LUIS, AGUSAN DEL SUR24NB0071 · ₱14,837,026.95 · mapped
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATION, CABANTAO ROAD LEADING TO MAANGHIT CAVE & PANAGANGAN FALLS, ROSARIO, AGUSAN DEL SUR19NC0015 · ₱14,700,000.00 · mapped
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATION NRJ BRGY. 1 - BITAN-AGAN-DAS-AGAN, ROAD LEADING TO CAVE CITY/ANINGAW CAVE, STA. 1+150 - 1+220, BRGY. DAS-AGAN, SAN FRANCISCO, AGUSAN DEL SUR19NC0056 · ₱14,700,000.00 · mapped
- CONSTRUCTION OF SABO DAM, GIBONG RIS, PROSPERIDAD, AGUSAN DEL SUR, PROSPERIDAD, AGUSAN DEL SUR25NB0031 · ₱14,693,252.05 · mapped
- CONCRETING OF BRGY. ILIHAN, CANETE TO SINAI FMR, SIBAGAT, AGUSAN DEL SUR, SIBAGAT, AGUSAN DEL SUR25NB0055 · ₱14,624,447.31 · mapped
- RECONSTRUCTION TO CONCRETE PAVEMENT - ALONG DAANG MAHARLIKA (AGUSAN-DAVAO SECT) (S00446MN) K1244+671.00 - K1244+684.50, K1246+980.00 - K1247+030.00, K1247+260.00 - K1247+570.00, K1248+196.00 - K1248+256.00, K1248+378.00 - K1248+550.00, SIBAGAT, AGUSAN DEL22NB0051 · ₱14,011,053.48 · mapped
- CONCRETING OF PUROK 8, BRGY. HAMOGAWAY FMR, BRGY. HAMOGAWAY, BAYUGAN CITY, AGUSAN DEL SUR22NB0048 · ₱11,939,992.41 · mapped
- RETROFITTING/STRENGTHENING OF LOWER LUGOM BRIDGE (B01576MN) ALONG BUTUAN CITY-TALACOGON-LORETO-VERUELA-STA. JOSEFA ROAD K1391+709 - K1391+759.90, VERUELA, AGUSAN DEL SUR18NC0024 · ₱11,882,799.86 · mapped
- ACCESS ROAD LEADING TO CAGUYAO MANGROVE SITE, BRGY. CAGUYAO, BISLIG CITY, SURIGAO DEL SUR24NI0015 · ₱9,799,834.71 · mapped
- NRJ LEADING TO HINAYAGAN CAVE, BRGY. SAN VICENTE, BISLIG CITY, SURIGAO DEL SUR24NI0011 · ₱9,799,509.30 · mapped
- CONCRETING OF BRGY. LAWIGAN TO BRGY. VALENCIA FMR, BRGY. LAWIGAN AND BRGY. VALENCIA, LINGIG, SURIGAO DEL SUR21NI0065 · ₱9,648,427.32 · mapped
- CONSTRUCTION OF TWO REGULAR WORKSHOP, TWO-STOREY (4 CLASSROOMS) SCHOOL BUILDING @ TUNGAO NATIONAL HIGH SCHOOL, BUTUAN CITY18ND0137 · ₱9,582,383.83 · mapped
- REHABILITATION OF PAVED ROAD - NRJ AWA-LIANGA RD K1304+720.00 - K1305+000.00, PROSPERIDAD, AGUSAN DEL SUR24NB0010 · ₱9,580,250.30 · mapped
- CONSTRUCTION OF 1-UNIT 2 STOREY ICT LABORATORY BUILDING MANAMBIA INTEGRATED SECONDARY SCHOOL (317936) TAGBINA, SURIGAO DEL SUR17NI0146 · ₱9,233,445.05
- CONSTRUCTION OF 1-UNIT 2 STOREY BUILDING SCIENCE LABORATORY KAHAYAGAN NATIONAL HIGH SCHOOL (304880) TAGBINA, SURIGAO DEL SUR17NI0121 · ₱9,232,492.38
- RETROFITTING/STRENGTHENING OF BINONGAN BRIDGE (B00802MN) ALONG NRJ CUEVAS-SAMPAGUITA ROAD K1384+684 - K1384+671, VERUELA, AGUSAN DEL SUR18NC0028 · ₱8,800,294.62 · mapped
- PACKAGE 19- CONSTRUCTION OF MULTI-PURPOSE BUILDING (SCIENCE LABORATORY), BISLIG CENTRAL ELEMENTARY SCHOOL, BRGY. POBLACION, BISLIG CITY, SURIGAO DEL SUR- CONSTRUCTION OF MULTI-PURPOSE BUILDING IN GAMAON DISTRICT, BARANGAY MANGAGOY, BISLIG CITY, SDS19NI0057 · ₱8,265,397.19 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (EVACUATION CENTER), BRGY. POBLACION, SIBAGAT, AGUSAN DEL SUR22NB0020 · ₱6,929,994.38 · mapped
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BRGY. MAGSAYSAY, PROSPERIDAD, AGUSAN DEL SUR24NB0049 · ₱5,927,777.99 · mapped
- CONSTRUCTION OF SCHOOL BUILDING IN MAGKIANGKANG NATIONAL HIGH SCHOOL, BRGY. MAGKIANGKANG, BAYUGAN CITY, AGUSAN DEL SUR24NB0085 · ₱4,974,999.72 · mapped
- CONSTRUCTION OF SCHOOL BUILDING IN STA. FE ELEMENTARY SCHOOL, BRGY. STA. FE, ESPERANZA, AGUSAN DEL SUR24NB0079 · ₱4,973,713.09 · mapped
- CONSTRUCTION OF SCHOOL BUILDING IN SALUG NATIONAL HIGH SCHOOL, BRGY. SALUG, ESPERANZA, AGUSAN DEL SUR24NB0078 · ₱4,969,333.47 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT) @ VILLA PAZ, LA PAZ, AGUSAN DEL SUR19NC0003 · ₱4,950,000.00 · mapped
- CONSTRUCTION OF MAGSAYSAY WATER SYSTEM,BRGY. MAGSAYSAY, SIBAGAT, AGUSAN DEL SUR21NB0059 · ₱4,949,998.44 · mapped
- CONSTRUCTION (CONCRETING) OF ROAD, PUROK 2C TO PUROK 6A, BRGY. POBLACION LINGIG, SURIGAO DEL SUR (PACKAGE B)23NI0051 · ₱4,949,996.94 · mapped
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BRGY. STO. NIÑO, BAYUGAN CITY, AGUSAN DEL SUR23NB0011 · ₱4,949,815.67 · mapped
- MAHARLIKA HIGHWAY (AGUSAN-DAVAO SECT)- K1257+004 - K1257+12025N00023 · ₱4,173,843.93 · mapped
- CONST. OF ONE (1) STOREY-TWO (2) CLASSROOMS SCHOOL BUILDING WITH ATTACHED TOILET UNDER CY 2017 BASIC EDUCATIONAL FACILITIES FUND (BEFF) - BATCH 4 @ J.A. MORALES ELEMENTARY SCHOOL, ROSARIO, AGUSAN DEL SUR17NC0095 · ₱3,300,797.41
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, P-5, BRGY. MARCELINA, BAYUGAN CITY, AGUSAN DEL SUR23NB0034 · ₱2,969,177.01 · mapped
- CONCRETING OF ROAD, NRJ -STA. CRUZ NATIONAL HIGH SCHOOL 0+000.00 - 0+180, STA. CRUZ, ROSARIO, AGUSAN DEL SUR18NC0021 · ₱2,940,000.00 · mapped
- CONST. OF ONE (1) STOREY - TWO (2) CLASSROOM SCHOOL BUILDING UNDER BASIC EDUCATIONAL FACILITIES FUND (BEFF) - BATCH 4 @ LANGKILA-AN ELEMENTARY SCHOOL, TRENTO, AGUSAN DEL SUR17NC0071 · ₱2,659,892.04
- CONST. OF ONE (1) STOREY - TWO (2) CLASSROOM SCHOOL BUILDING UNDER BASIC EDUCATIONAL FACILITIES FUND (BEFF) - BATCH 4 @ MANAT ELEMENTARY SCHOOL, TRENTO, AGUSAN DEL SUR17NC0073 · ₱2,655,348.78
- CONSTRUCTION OF RAINWATER COLLECTOR SYSTEM (RWCS) CY - 202525NC0048 · ₱2,577,945.19 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (DAY CARE CENTER), BRGY. SANTO NIÑO, BUTUAN CITY, AGUSAN DEL NORTE19ND0073 · ₱1,931,472.30 · mapped
- CONST. OF MULTI-PURPOSE BUILDING, BRGY. MAGOBAWOK, BAYABAS, SURIGAO DEL SUR18NH0051 · ₱1,905,285.54 · mapped
Equipment & capacity
PCAB license
- License no.
- 41232
- Category
- B · Medium A
- Minimum net worth for this category
- ₱10,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱150M
- License valid until
- Dec 14, 2026
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 41232); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
6 evaluations listed across 2 GPPB CPES releases; average final rating 88.0% over 1 rated project; 6 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Jun 9, 2025 | DPWH | ₱19,593,087.00 | On-going | 94.3% | — | 40th, p. 196 |
| Jun 9, 2025 | DPWH | ₱14,693,253.00 | On-going | 85.8% | — | 40th, p. 196 |
| Mar 25, 2025 | DPWH | ₱14,837,027.00 | On-going | 92.8% | — | 39th (rev), p. 132 |
| Jun 3, 2024 | NIA | ₱9,222,216.00 | On-going | 82.1% | — | 39th (rev), p. 132 |
| Jun 3, 2024 | NIA | ₱6,468,043.00 | Completed | 88.0% | 88.0% | 39th (rev), p. 132 |
| Aug 24, 2019 | DPWH | ₱13,953,689.00 | On-going | 91.5% | — | 40th, p. 196 |
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →