AAA ROCK CONST CORP FORMERLY: DAVAO ROCK MIXER ENT is listed as a company organization in Philippine public procurement records on this site, with 29 linked DPWH project(s) totaling about ₱1,417,487,566.89. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
AAA ROCK CONST CORP FORMERLY: DAVAO ROCK MIXER ENT
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 29
- Total value
- ₱1,417,487,566.89
- Published flags
- 0
- Region
- Davao de Oro 1st DEO · Region XI
Online presence
Google Maps: AAA Rock Construction CorporationGoogle Maps, 2026-10-22
Davao Rock Building, 27 Lacson St, Obrero, Davao City, 8000 Davao del Sur
Public Record Grade
A transparent, data-derived summary of reported public records for AAA ROCK CONST CORP FORMERLY: DAVAO ROCK MIXER ENT — not an accusation or finding of wrongdoing.
Score: 87.60 / 100 · Projects in sample: 29 · As of Oct 22, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 87.9/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 87.9
- lateCompletedProjects
- 7
- onTimeCompletedProjects
- 22
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 29
- pastTargetOngoingProjects
- 0
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 29
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 29
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 29
- componentScore
- —
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 29
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
27 geotagged projects — Open full map
- WIDENING (2 TO 6 LANES) OF DAANG MAHARLIKA (MN) INCL. RROW (BRGY. RIZAL-BRGY. HAGUIMITAN SECT.), COM17L00006 · ₱190,655,744.03 · mapped
- ROAD WIDENING - DIGOS-MAKAR RD - K1613 + 996 - K1618 + 394, MALUNGON, SARANGANI24M00105 · ₱144,749,518.67 · mapped
- WIDENING OF BRIDGE-GLAN BR. (B01054MN) ALONG SARANGANI-DAVAO DEL SUR COASTAL ROAD, GLAN, SARANGANI22M00056 · ₱118,694,812.77 · mapped
- WIDENING OF BRIDGE - KABLACAN BR. (B01062MN) ALONG SARANGANI-SULTAN KUDARAT COASTAL RD, K1701+743 - K1701+843.78, SARANGANI23M00041 · ₱97,252,641.03 · mapped
- CONSTRUCTION OF SLOPE PROTECTION ALONG MANGGAHAN FLOODWAY (EASTBANK), PASIG CITY19OB0026 · ₱93,588,897.60 · mapped
- WIDENING OF HAGUIMITAN BRIDGE (B00063MN) INCLUDING APPROACHES AND RRW, MONKAYO ALONG DAANG MAHARLIKA (MN), COMPOSTELA VALLEY PROVINCE17LA0015 · ₱73,060,116.54 · mapped
- WIDENING (2 INTO 4 LANES)/RECONST. OF EXISTIG 2 LANES OF GUYON BRIDGE (B00072MN) & APPROACHES ALONG17L00061 · ₱72,649,658.12 · mapped
- REHABILITATION OF EAST BANK ROAD, MANGGAHAN FLOODWAY, BRGY. MANGGAHAN, PASIG CITY18OB0208 · ₱68,614,382.01 · mapped
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROLL-IT) CONSTRUCTION OF SOUTHERN BUKIDNON AGRI-INDUSTRIAL ECONOMIC ZONE, ROAD NETWORK DEVELOPMENT PROJECT (PACKAGE 3), DON CARLOS, BUKIDNON21K00167 · ₱66,612,588.19 · mapped
- RECHANNELING AND CONSTRUCTION OF REVETMENT ALONG BATUTU RIVER, BARANGAY FATIMA TO CAMANLANGAN, NEW BATAAN, COMPOSTELA VALLEY PROVINCE18LA0079 · ₱48,509,999.65 · mapped
- WIDENING/CONSTRUCTION OF SLOPE PROTECTION ALONG EAST BANK ROAD, MANGGAHAN FLOODWAY ROSARIO, PASIG CITY (PACKAGE 2)20OB0089 · ₱45,817,078.14 · mapped
- CONSTRUCTION OF HINAPOYAN BRIDGE, CARMEN, SURIGAO DEL SUR22NH0059 · ₱44,452,327.52 · mapped
- CONSTRUCTION OF GUYON BRIDGE 2 AND APPROACHES ALONG DAANG MAHARLIKA (MN), COMPOSTELA VALLEY15L00049 · ₱38,935,851.35 · mapped
- SURIGAO-DAVAO COASTAL RD - 1388+679-K1389+919, LIANGA, SURIGAO DEL SUR23NH0025 · ₱38,743,258.79 · mapped
- RECONSTRUCTION (PAVED TO CONCRETE) ALONG MONTEVISTA-COMPOSTELA-MATI BDRY. ROAD, LIBUTON SADDLE SECTION, NEW BATAAN, COMPOSTELA VALLEY PROVINCE18LA0118 · ₱34,299,904.88 · mapped
- ASPHALT OVERLAY - AT SPECIFIC LOCATIONS ALONG DAANG MAHARLIKA (MN) (S00126MN) MONKAYO, DAVAO DE ORO21LA0175 · ₱31,224,735.43 · mapped
- ROAD CONCRETING AT BARANGAY ATAN-AWE TO SIBULAN, TORIL DISTRICT, DAVAO CITY16LH0091 · ₱29,626,888.62
- CONSTRUCTION OF CONCRETE ROAD, ACCESS ROAD LEADING TO TRIBAL VILLAGE, TIBYUN CAVE, SAN MIGUEL CAVE & PARADISE CAVE NEW CORELLA, DAVAO DEL NORTE19LC0045 · ₱29,400,000.00 · mapped
- CONST. OF FLOOD CONTROL, BARANGAY SAN JUAN (UPPER LUMABAT RIVER), MALUNGON, SARANGANI PROVINCE19ME0051 · ₱29,394,162.25 · mapped
- ASSET PRESERVATION-CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROAD-TERTIARY ROAD-CAMP CRAME RD NETWORK-(S05562LZ) CHAINAGE 0- CHAINAGE 131-(S05563LZ) CHAINAGE 0-CHAINAGE 127, (S05564LZ) CHAINAGE 0-CHAINAGE 393, (S05566LZ)....18OG0082 · ₱20,732,747.40 · mapped
- CONSTRUCTION OF HINAPOYAN BRIDGE ABUTMENT AND DIKE, BARANGAY HINAPOYAN, CARMEN, SURIGAO DEL SUR22NH0073 · ₱19,479,898.96 · mapped
- REHABILITATION/IMPROVEMENT OF DRAINAGE SYSTEM ALONG EISENHOWER STREET, BRGY. GREENHILLS, SAN JUAN CITY17OB0197 · ₱18,363,645.60 · mapped
- CONCRETING OF PUROK 3, POBLACION - MACOPA FMR PHASE III, BRGY. POBLACION AND BRGY. MACOPA, LAAK, DAVAO DE ORO22LA0175 · ₱14,924,979.65 · mapped
- CONSTRUCTION/REHABILITATION OF SLOPE PROTECTION ALONG EAST BANK ROAD OPEN CHANNEL, BRGY. STA. LUCIA, PASIG CITY19OB0028 · ₱14,148,397.30 · mapped
- CONSTRUCTION OF DRAINAGE, BARANGAY POBLACION, NABUNTURAN, DAVAO DE ORO21LA0168 · ₱9,899,885.95 · mapped
- ROAD CONCRETING AT BRGY. SIBULAN, TORIL DISTRICT, DAVAO CITY16LH0027 · ₱9,684,891.89
- PREVENTIVE MAINTENANCE OF ROAD : ASPHALT OVERLAY-TOMAS MORATO-K0009+1173-K0009+1413, QUEZON CITY20OG0025 · ₱7,740,328.50 · mapped
- PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY NIA NORTH RD (S05149LZ) CHAINAGE 000 CHAINAGE 245, QUEZON CITY20OG0094 · ₱3,729,346.85 · mapped
- PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY NIA NORTH ROAD (S05149LZ) CHAINAGE 000 CHAINAGE 245, QUEZON CITY20OG0103 · ₱2,500,879.20 · mapped
Across government
No DepEd or DOH contract awards matched to this name in PhilGEPS records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
