LLM UNIFIED BUILDERS is listed as a company organization in Philippine public procurement records on this site, with 387 linked DPWH project(s) totaling about ₱2,886,314,271.83. Recorded delivery grade A (from public DPWH project records — not a finding of wrongdoing).
LLM UNIFIED BUILDERS
AGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 387
- Total value
- ₱2,886,314,271.83
- Published flags
- 0
- Region
- Davao del Norte DEO · Region XI
Online presence
Google Maps: LLM Unified Builders & Trading Corp.Google Maps, 2026-10-22
PUROK 26A BYPASS ROAD, MAA, Davao City, 8000 Davao del Sur
Public Record Grade
A transparent, data-derived summary of reported public records for LLM UNIFIED BUILDERS — not an accusation or finding of wrongdoing.
Score: 96.30 / 100 · Projects in sample: 387 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 94.4/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 94.4
- lateCompletedProjects
- 32
- onTimeCompletedProjects
- 352
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 387
- pastTargetOngoingProjects
- 3
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 387
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 387
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 387
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 387
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 44 of 311 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- CONSTRUCTION OF 3 STOREY 12 CLASSROOM SCHOOL BUILDING, DONA SOLEDAD DUTERTE HIGH SCHOOL, DAVAO CITY18LB0293 · ₱37,511,866.16 · mapped
- CONSTRUCTION OF TWO (2) UNITS, TWO (2) STOREY, EIGHT (8) CLASSROOM BUILDING @ DON VICENTE ROMUALDEZ NHS, LAAK, COMPOSTELA VALLEY PROVINCE17LA0381 · ₱36,965,244.40 · mapped
- CONSTRUCTION OF STANDARD 4 STOREY 16 CLASSROOMS BUILDING AT BINUGAO NATIONAL HIGH SCHOOL, TORIL DISTRICT, DAVAO CITY17LH0206 · ₱36,833,765.57
- CONSTRUCTION OF ONE (1) UNIT, FOUR (4) STOREY, SIXTEEN (16) CLASSROOM BUILDING @ NEW BATAAN NHS, NEW BATAAN, COMPOSTELA VALLEY PROVINCE17LA0228 · ₱34,032,979.26 · mapped
- CONSTRUCTION OF ONE (1) UNIT, THREE (3) STOREY, TWELVE (12) CLASSROOM BUILDING AT PALOC, MARAGUSAN, COMPOSTELA VALLEY PROVINCE17LA0220 · ₱33,345,434.76 · mapped
- CONSTRUCTION OF 2STY10CL, WITH ICT & SL, MACAMBOL NHS, MATI, DAVAO ORIENTAL23LG0120 · ₱32,511,069.35 · mapped
- CONSTRUCTION OF 3 STY - 12 CL SCHOOL BUILDING AT SAWATA ELEMENTARY SCHOOL, SAN ISIDRO, DAVAO DEL NORTE17LC0452 · ₱32,447,917.14 · mapped
- CONSTRUCTION OF TWO (2) UNITS, THREE (3) STOREY, NINE (9) CLASSROOM BUILDING AT MONTEVISTA NHS, MONTEVISTA, COMPOSTELA VALLEY PROVINCE16LA0278 · ₱32,150,960.91 · mapped
- CONSTRUCTION OF 4 STOREY 20 CLASSROOM SCHOOL BUILDING AT KAPALONG NHS, KAPALONG, DAVAO DEL NORTE16LC0109 · ₱31,052,191.58 · mapped
- CONSTRUCTION OF ONE (1) UNIT, TWO (2) STOREY, EIGHT (8) CLASSROOMS BUILDING AT CARAGAN ES, MARAGUSAN (SAN MARIANO), COMPOSTELA VALLEY PROVINCE18LA0337 · ₱30,216,005.28 · mapped
- CONSTRUCTION OF 4 STOREY 20 CLASSROOM SCHOOL BUILDING AT TAGUM NHS (ATTACHED TO 4 STOREY 12 CLASSROOM WITH ONE STAIRCASE AND FIRE EXIT), TAGUM CITY, DAVAO DEL NORTE16LC0043 · ₱30,091,537.12 · mapped
- CONSTRUCTION OF MABINI MUNICIPAL HALL, MABINI, COMPOSTELA VALLEY PROVINCE19LA0498 · ₱29,399,966.76 · mapped
- CONSTRUCTION OF MULTIPURPOSE BUILDING , CITY OF MATI , DAVAO ORIENTAL20LG0098 · ₱29,254,476.55 · mapped
- CONSTRUCTION OF ONE (1) UNIT, THREE (3) STOREY, TWELVE (12) CLASSROOM BUILDING @ LAAK NHS, LAAK, COMPOSTELA VALLEY PROVINCE17LA0336 · ₱29,116,684.16 · mapped
- CONSTRUCTION OF 4 STOREY 16 CLASSROOM SCHOOL BUILDING (CONST. OF 4 STOREY 12 CLASSROOM BUILDING AND 2 STOREY 4 CLASSROOM) AT NIEVES VILLARICA NATIONAL HIGH SCHOOL, IGACOS, DAVAO DEL NORTE16LC0081 · ₱28,934,555.86 · mapped
- REPAIR / REHABILITATION OF MULTI- PURPOSE BUILDING IN 23 BARANGAYS , MATI , DAVAO ORIENTAL20LG0099 · ₱28,900,000.00 · mapped
- CONSTRUCTION OF ONE (1) UNIT, THREE (3) STOREY, TWELVE (12) CLASSROOM BUILDING @ MELALE NHS, LAAK, COMPOSTELA VALLEY PROVINCE17LA0333 · ₱28,293,819.74 · mapped
- CONSTRUCTION OF ONE (1) UNIT, THREE (3) STOREY, TWELVE (12) CLASSROOM BUILDING @ ARAIBO NHS, PANTUKAN, COMPOSTELA VALLEY PROVINCE17LA0325 · ₱27,875,919.48 · mapped
- CONSTRUCTION OF 3 STY - 9 CL SCHOOL BUILDING AT BUSAON INTEGRATED SCHOOL, TAGUM CITY, DAVAO DEL NORTE17LC0558 · ₱27,275,434.51
- CONSTRUCTION OF CLASSROOMS, 3STY 9CL BANSALAN CES, BANSALAN, DAVAO DEL SUR17LD0103 · ₱26,542,537.00 · mapped
- CONSTRUCTION OF 3STY 18CL SCHOOL BUILDING, KALILANGAN NHS, CENTRAL POBLACION, KALILANGAN, BUKIDNON16KC0015 · ₱25,519,784.38 · mapped
- CONSTRUCTION OF STANDARD 3 STOREY 9 CLASSROOMS BUILDING AT LACSON ELEMENTARY SCHOOL, CALINAN DISTRICT, DAVAO CITY17LH0194 · ₱25,469,688.74
- CONSTRUCTION OF 2 UNITS 2 STY 10CL SCHOOL BUILDING, BAUNGON NATIONAL HIGH SCHOOL, IMBATUG, BAUNGON, BUKIDNON16KC0010 · ₱25,386,193.99 · mapped
- CONSTRUCTION OF 4 STY 12- CLR SCHOOL BUILDING, DAPA NHS (SCH. ID 304774), DAPA, SURIGAO DEL NORTE17NG0044 · ₱25,250,484.34 · mapped
- CONSTRUCTION OF 2STY 8CL WITH ICT & SL, MACAMBOL NHS, MATI, DAVAO ORIENTAL22LG0076 · ₱24,999,299.84 · mapped
- CONSTRUCTION OF ACADEMIC BUILDING, BANAYBANAY CAMPUS , POBLACION , BANAYBANAY , DAVAO ORIENTAL18LG0103 · ₱24,814,468.57 · mapped
- CONSTRUCTION OF 3 STOREY 15 CLASSROOM SCHOOL BUILDING AT ASUNCION NHS, ASUNCION, DAVAO DEL NORTE16LC0113 · ₱24,739,760.22
- CONSTRUCTION OF 2 STY 8 CL SCHOOL BUILDING AT KAPUTIAN NHS ISLAND GARDEN CITY OF SAMAL,DAVAO DEL NORTE18LC0219 · ₱24,500,181.51 · mapped
- CONSTRUCTION OF 3 STY - 9 CL SCHOOL BUILDING AT CANOCOTAN NATIONAL HIGH SCHOOL, TAGUM CITY, DAVAO DEL NORTE17LC0557 · ₱23,170,002.49
- CONSTRUCTION OF ONE (1) UNIT, THREE (3) STOREY, FIFTEEN (15) CLASSROOM BUILDING, MONKAYO NHS, MONKAYO, COMPOSTELA VALLEY PROVINCE16LA0219 · ₱23,041,608.62 · mapped
- CONSTRUCTION OF 1 UNIT, 2 STY - 10 CL SCHOOL BUILDING, MARAMAG CES, MARAMAG, BUKIDNON18KB0160 · ₱22,595,414.60 · mapped
- CONSTRUCTION OF ONE (1) UNIT, TWO (2) STOREY, TEN (10) CLASSROOM BUILDING @ CABINUANGAN CES, NEW BATAAN, COMPOSTELA VALLEY PROVINCE17LA0356 · ₱21,432,299.95 · mapped
- CONSTRUCTION OF THE NORTHERN BUKIDNON COMMUNITY COLLEGE ACADEMIC CENTER, PHASE 2, BRGY. TANKULAN, MANOLO FORTICH, BUKIDNON20KC0089 · ₱19,800,000.00 · mapped
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, (MAHAYAHAY ELEMENTARY SCHOOL), MAGSAYSAY, MISAMIS ORIENTAL24KK0069 · ₱19,800,000.00 · mapped
- CONSTRUCTION OF ONE (1) UNIT, THREE (3) STOREY, TWELVE (12) CLASSROOM BUILDING, LAAK NHS, LAAK (SAN VICENTE), COMPOSTELA VALLEY PROVINCE16LA0218 · ₱19,778,450.71 · mapped
- CONSTRUCTION OF 4 STOREY 12 CLASSROOM SCHOOL BUILDING AT TAGUM CITY NATIONAL HIGH SCHOOL, TAGUM CITY, DAVAO DEL NORTE16LC0050 · ₱19,602,111.95 · mapped
- COMPLETION OF NABUNTURAN NATIONAL COMPREHENSIVE HS GYM, NABUNTURAN, COMPOSTELA VALLEY PROVINCE18LA0309 · ₱19,599,999.08 · mapped
- IMPROVEMENT/REHABILITATION OF DRAINAGE (GROUTED RIPRAP) AT BRGY. TUGBOK (TO CARMELITE), TUGBOK DISTRICT, DAVAO CITY18LH0017 · ₱19,599,879.83 · mapped
- CONSTRUCTION OF SUPPORT SERVICES BUILDING (MAINTENANCE LAUNDRY-LINEN, WATCHERS UTILITY AND SUPPLY BLDG.) COMPLETION OF THE NEW 2-STOREY BUILDING FOR THE OR-DR COMPLEX, CSSR AND ICU COMPLEX INCLUDING FIRE PROTECTION SYSTEM AND MEDICAL GAS PIPELINES17LA0174 · ₱19,361,752.26 · mapped
- CONSTRUCTION OF ONE (1) UNIT, TWO (2) STOREY, EIGHT (8) CLASSROOM BUILDING @ KIDAWA NHS, LAAK, COMPOSTELA VALLEY PROVINCE17LA0304 · ₱19,266,184.74 · mapped
- CONSTRUCTION OF 7 UNITS TVL REGULAR WORKSHOP BUILDING/LAB. FOR SHS, NIEVES VILLARICA NHS, BABAK, ISLAND GARDEN CITY OF SAMAL, DAVAO DEL NORTE17LC0195 · ₱19,175,666.75 · mapped
- CONSTRUCTION OF ONE (1) UNIT, TWO (2) STOREY, EIGHT (8) CLASSROOM BUILDING @ MELALE NHS, LAAK, COMPOSTELA VALLEY PROVINCE17LA0311 · ₱19,042,309.30 · mapped
- PACKAGE 3 - CONSTRUCTION OF ONE (1) UNIT, ONE (1) STOREY, TWO (2) CLASSROOM BUILDING AT:CW1. BANBANON ES, LAAK; CW2. CANDIIS ES, LAAK; CW3. DATU AMPUNAN ES, LAAK; CW4. DATU DAVAO ES, LAAK; CW5. DOÑA JOSEFA ES, LAAK; CW6. EL KATIPUNAN ES, LAA17LA0225 · ₱19,002,506.96 · mapped
- CONSTRUCTION OF 2 UNITS, 2 STY - 4 CL SCHOOL BUILDING, SAN ANDRES NHS, KADINGILAN, BUKIDNON17KB0163 · ₱19,000,488.85 · mapped
- CONSTRUCTION OF ONE (1) UNIT, TWO (2) STOREY, EIGHT (8) CLASSROOM BUILDING @ CAMANLANGAN ES, NEW BATAAN, COMPOSTELA VALLEY PROVINCE17LA0306 · ₱18,918,929.45 · mapped
- CONST. OF THE FF. PROJECTS AT BRGY. MANUEL GUIANGA, TUGBOK DIST., D.C., LGSF-BPD, ELCAC (1) CONST. OF ROAD AT SITIO DIPAG II, BRGY. MANUEL GUIANGA, D.C. (2) CONST. OF WATER SUPPLY SYSTEM AT SITIO SARRO, BRGY. MANUEL GUIANGA, D.C.21LH0153 · ₱18,905,607.67 · mapped
- CONSTRUCTION OF ONE (1) UNIT, TWO (2) STOREY, EIGHT (8) CLASSROOM BUILDING @ SAN ANTONIO NHS, LAAK, COMPOSTELA VALLEY PROVINCE17LA0320 · ₱18,765,699.85 · mapped
- PACKAGE 2 - CONSTRUCTION OF ONE (1) UNIT, ONE (1) STOREY, TWO (2) CLASSROOM BUILDING AT:CW1. HINAGTUNGAN ES, LAAKCW2. IL PAPA ES, LAAKCW3. KIBAGUIO ES, LAAKCW4. MALINAO ES, LAAKCW5. MANGLOY ES, LAAKCW6. PANAMOREN ES, LAAKCOMPOSTELA VALLEY17LA0224 · ₱18,252,076.90 · mapped
- CONSTRUCTION OF THREE (3) STOREY-TWELVE (12) CLASSROOMS SCHOOL BUILDING UNDER BASIC EDUCATIONAL FACILITIES FUND (BEFF) - BATCH 11 @ BUNAWAN NHS, BUNAWAN, AGUSAN DEL SUR16NC0038 · ₱18,169,861.86
- CONSTRUCTION OF 2 UNITS, 2 STY-4 CLASSROOM SCHOOL BUILDING, DOLOGON NHS, MARAMAG, BUKIDNON17KB0136 · ₱17,827,934.32 · mapped
Equipment & capacity
PCAB license
No PCAB license is linked to this record. It may be a joint venture, a foreign firm, or a name we could not match. Search PCAB.
Government performance ratings (CPES)
No CPES evaluation lists this contractor's PCAB license in the GPPB releases we loaded (34th–41st).
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →