MFN BUILDERS is listed as a company organization in Philippine public procurement records on this site, with 74 linked DPWH project(s) totaling about ₱872,864,993.47. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
MFN BUILDERS
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 74
- Total value
- ₱872,864,993.47
- Published flags
- 1
- Region
- Sarangani DEO · Region XII
Licensed officers (PCAB)
- DOMINGO JANCILAN GUMBAN JR. · Authorized Managing Officer (PCAB license 36402) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for MFN BUILDERS — not an accusation or finding of wrongdoing.
Score: 87.10 / 100 · Projects in sample: 74 · As of Oct 28, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 77.8/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 77.8
- lateCompletedProjects
- 8
- onTimeCompletedProjects
- 59
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 74
- pastTargetOngoingProjects
- 7
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 21%
- totalProjects
- 74
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 74
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 99.6/100 · Weight: 11%
- projects
- 74
- componentScore
- 99.6
- flagsPerProject
- 0.01
- publishedV2Flags
- 1
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 74
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 45 of 59 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG MAITUM - LAKE SEBU ROAD,K1777+275 - K1777+426, K1777+446 - K1777+630, MAITUM, SARANGANI PROVINCE24ME0010 · ₱122,168,969.00 · mapped
- REHAB./RECONST. OF ROADS W/ SLOPE COLLAPSE AND LANDSLIDE ALONG MAITUM-LAKE SEBU ROAD - K1775+290-K1775+420, MAITUM, SARANGANI PROVINCE23ME0041 · ₱35,280,813.14 · mapped
- CONSTRUCTION OF 4 STOREY 16 CLASSROOM BUILDING @ GLAN PADIDU NHS; GLAN, SARANGANI PROVINCE.19ME0096 · ₱35,266,814.50 · mapped
- CONSTRUCTION OF 4-STOREY 16-CL BUILDING AT LEONARD YOUNG SR. NATIONAL HIGH SCHOOL; GLAN, SARANGANI PROVINCE.18ME0152 · ₱34,671,551.97 · mapped
- CONST. OF MPB (GOVERNMENT ECONOMIC ENTERPRISE BLDG.), PHASE V, MAITUM, SARANGANI PROVINCE22ME0139 · ₱34,650,000.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING-CONSTRUCTION (COMPLETION/UPGRADING) OF DPWH BUILDING, MULTI-PURPOSE BUILDING AND DPWH COMPOUND19MC0107 · ₱33,810,000.00 · mapped
- CONSTRUCTION OF 3 STOREY 12 CLASSROOM BUILDING @ BALITON NHS; GLAN, SARANGANI PROVINCE.19ME0095 · ₱29,359,267.25 · mapped
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BUILDING NO. 2, BARANGAY MALALAG, MAITUM, SARANGANI PROVINCE25ME0083 · ₱28,801,096.30 · mapped
- CONSTRUCTION OF MPB (PUBLIC MARKET), PHASE III; MAASIM, SARANGANI PROVINCE21ME0088 · ₱27,967,788.23 · mapped
- CONSTRUCTION OF ELEMENTARY AND SECONDARY CLASSROOMS 3 STOREY 12 CLASSROOMS AT BUAYAN NATIONAL HIGH SCHOOL, GENERAL SANTOS CITY17MB0159 · ₱27,878,289.30
- COMPLETION OFMULTI-PURPOSE BUILDING (MEDICAL ARTS BUILDING) MINDANAO STATE UNIVERSITY (GENERAL SANTOS CITY - MSU, GENERAL SANTOS CITY, SOUTH COTABATO23MB0144 · ₱19,778,930.31 · mapped
- CONCRETING OF ROAD, BRGY. SAN VICENTE-BRGY. CALPIDONG; GLAN, SAR. PROV.19ME0069 · ₱19,578,778.51 · mapped
- JUNCTION NATIONAL HIGHWAY TO SAN JOSE PROPER IN SUPPORT TO COCO COIR AND AQUAMARINE INDUSTRIES, GLAN, SARANGANI PROVINCE22ME0010 · ₱17,408,734.32 · mapped
- CONSTRUCTION OF MEDICAL LIBRARY AT MINDANAO STATE UNIVERSITY COLLEGE OF MEDICINE, GENERAL SANTOS CITY, SOUTH COTABATO21MB0089 · ₱16,660,000.00 · mapped
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BUILDING NO.1, BARANGAY MALALAG, MAITUM, SARANGANI PROVINCE25ME0082 · ₱15,362,023.24 · mapped
- CONCRETING OF BRGY. BATOMELONG FMR, BRGY. BATOMELONG, GENERAL SANTOS CITY24MB0082 · ₱14,922,894.20 · mapped
- BRGY. ALEGRIA PROPER (ALABEL-MALUNGON PRVL. ROAD JUNCTION) TO SITIO LIKON (ALABEL-MALUNGON ROAD), BRGY. DOMOLOK IN SUPPORT TO CACAO, COCONUT, MANGO AND BANANA AGRI-INDUSTRIES; ALABEL, SARANGANI PROVINCE.20ME0046 · ₱14,699,974.24 · mapped
- ROAD CONCRETING (COMPLETION) AT PUROK 2 G. ANTONINO ST., BRGY. LIGAYA, GENERAL SANTOS CITY19MB0062 · ₱14,699,919.77 · mapped
- REHAB./ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS ALONG SARANGANI-SULTAN KUDARAT COASTAL ROAD, K1749+560-K1749+825, K1749+863-K1750+058; KIAMBA, SARANGANI PROVINCE.20ME0025 · ₱14,696,222.20 · mapped
- Construction of Ala RIS Protection Works, Sto. Niño, South Cotabato25MG0034 · ₱14,689,979.39 · mapped
- CONSTRUCTION OF ROAD, BALAKAYO, BARANGAY OLYMPOG, GENERAL SANTOS CITY, SOUTH COTABATO23MB0120 · ₱14,644,338.55 · mapped
- CONST./UPGRADING/REHAB. OF DRAINAGE ALONG SDSCR - K1672+473-K1672+862, MALAPATAN, SARANGANI PROVINCE22ME0107 · ₱14,119,684.87 · mapped
- CONST. OF CONCRETE ROAD - JCT NATIONAL HIGHWAY TO KAWAS BEACH AND VARIOUS GOVERNMENT AGENCIES (PNP PROVINCIAL HQ, DOH REHABILITATION FACILITY); KAWAS , ALABEL, SAR. PROV.19ME0007 · ₱13,489,700.00 · mapped
- CONSTRUCTION OF CONCRETE ROAD -JCT. MATIGOL TO SITIO INAMONG ROAD LEADING TO MATIGOL FALLS, BRGY. DATU LADAYON, ARAKAN, NORTH COTABATO19MC0029 · ₱11,760,000.00 · mapped
- ROAD ALKIKAN-DATAL BATONG-DATAL BILA IN SUPPORT OF AGRO-INDUSTRIES, MALUNGON, SARANGANI PROVINCE21ME0067 · ₱10,044,127.20 · mapped
- CONCRETING OF BRGY. DAIG - BRGY. PARAISO FMR, BRGY. DAIG AND BRGY. PARAISO, TULUNAN, NORTH COTABATO19MC0156 · ₱9,948,700.00 · mapped
- CONCRETING OF BRGY. KATANGAWAN FMR, BRGY. KATANGAWAN, GENERAL SANTOS CITY, SOUTH COTABATO25MB0105 · ₱9,942,895.63 · mapped
- CONSTRUCTION/REHABILITATION/IMPROVEMENT OF MAKAR-MARBEL ROAD NATIONAL HIGHWAY JUNCTION SILWAY 7, KLINAN 6, STA.0+100-STA.1+009, POLOMOLOK, SOUTH COTABATO17MB0004 · ₱9,898,437.85
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (HEALTH CENTER), BRGY. PARAISO, ALABEL, SARANGANI PROVINCE24ME0084 · ₱9,829,668.66 · mapped
- CONSTRUCTION OF GLAN RIVER FLOOD CONTROL; GLAN, SARANGANI PROVINCE.19ME0037 · ₱9,799,201.12 · mapped
- CONST. OF BIG MARGUS RIVER FLOOD CONTROL; GLAN, SARANGANI PROVINCE.19ME0004 · ₱9,773,968.68 · mapped
- CONSTRUCTION OF SMALL MARGUS RIVER FLOOD CONTROL; GLAN, SARANGANI PROVINCE.20ME0056 · ₱9,554,269.53 · mapped
- CONSTRUCTION OF 1UNIT 2STOREY 4CLASSROOM BUILDING @ DAKOK TAMULON INTEGRATED SCHOOL; MALUNGON, SARANGANI PROVINCE.19ME0093 · ₱9,334,162.86 · mapped
- CONSTRUCTION OF 1UNIT 2STOREY 4CLASSROOM BUILDING AT JAMES ALFRED STRONG INTEGRATED SCHOOL; MAITUM, SARANGANI PROVINCE.19ME0094 · ₱9,304,144.59 · mapped
- CONCRETING OF BRGY. SULIT TRAVERSING, BRGY. BENTUNG AND KORONADAL PROPER FMR, BRGY. SULIT, POLOMOLOK, SOUTH COTABATO17MB0094 · ₱9,072,256.35
- CONSTRUCTION OF 1 UNIT-2STY 6CL AT AFLEK NHS-EDWARDS NHS ANNEX, T'BOLI, SOUTH COTABATO16MG0125 · ₱8,864,190.44 · mapped
- CONST. OF UPO RIVER FLOOD CONTROL, MAITUM, SARANGANI PROVINCE18ME0029 · ₱8,762,311.19 · mapped
- CONSTRUCTION OF SENIOR HIGH SCHOOL CLASSROOMS 2 STOREY 6 CL SCHOOL BUILDING AT MABUHAY ELEMENTARY SCHOOL, BRGY. MABUHAY, GENERAL SANTOS CITY16MB0076 · ₱8,128,919.67
- CONCRETING OF PUROK 6 TO PUROK 10 SPRING FARM TO MARKET ROAD; BRGY. SPRING , ALABEL, SARANGANI PROVINCE.16ME0036 · ₱7,918,849.13 · mapped
- CONSTRUCTION OF MALALAG MULTI-PURPOSE BUILDING, MALALAG, MAITUM, SARANGANI PROVINCE25ME0112 · ₱7,890,791.98 · mapped
- CONSTRUCTION OF ROAD WITH DRAINAGE, BARANGAY MABUHAY, GENERAL SANTOS CITY, SOUTH COTABATO23MB0123 · ₱5,937,385.02 · mapped
- CONSTRUCTION OF BATIAN MULTI-PURPOSE BUILDING (BARANGAY HALL), BATIAN, MAITUM, SARANGANI PROVINCE25ME0105 · ₱5,761,619.27 · mapped
- CONSTRUCTION OF MAGULING MULTI-PURPOSE BUILDING, MAGULING, MAITUM, SARANGANI PROVINCE25ME0099 · ₱5,751,531.39 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BRGY. KLING; KIAMBA, SARANGANI PROVINCE21ME0033 · ₱4,945,151.01 · mapped
- CONSTRUCTION OF NATIONAL HIGHWAY JCT. POBLACION TO UPPER MAINIT ROAD (UPPER MAINIT PROPER SECTION), UPPER MAINIT, MALUNGON, SARANGANI PROVINCE24ME0023 · ₱4,919,487.46 · mapped
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY CALUMPANG, GENERAL SANTOS CITY22MB0034 · ₱4,900,180.47 · mapped
- COMPLETION OF MULTI-PURPOSE BUILDING, LABANGAL NATIONAL HIGH SCHOOL, BARANGAY LABANGAL, GENERAL SANTOS CITY, SOUTH COTABATO25MB0113 · ₱4,801,411.28 · mapped
- CONST. OF TECHVOC FACILITIES/WORKSHOP BUILDING AT BANISIL NHS., BRGY. TAMBLER, GENERAL SANTOS CITY (UNITS)16MB0105 · ₱4,710,382.15
- CONST. OF (3) CL BLDG. @ BRGY. TANGO, GLAN, SARANGANI PROVINCE17ME0026 · ₱3,779,961.13 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, SITIO BLISS, BRGY. BALINDOG, KIDAPAWAN CITY, NORTH COTABATO19MC0054 · ₱3,465,000.00 · mapped
Equipment & capacity
PCAB license
- License no.
- 36402
- Category
- B · Medium A
- Minimum net worth for this category
- ₱10,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱150M
- License valid until
- Jan 9, 2028
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 36402); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
1 evaluation listed across 1 GPPB CPES release; average final rating 94.7% over 1 rated project; 1 site-visit rating. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Apr 25, 2024 | DPWH (JV) | ₱35,280,813.00 | Completed | 97.6% | 94.7% | 38th, p. 87 |
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
- DPWH Infrastructure: 114 awards · ₱1,119,391,565.32
- Province of Sarangani Infrastructure: 19 awards · ₱98,000,337.13
- DepEd Infrastructure: 3 awards · ₱57,083,555.41
- Province of South Cotabato Infrastructure: 7 awards · ₱22,850,888.19
- City of General Santos Infrastructure: 4 awards · ₱9,596,810.34
- Municipality of Alabel, Sarangani Province Infrastructure: 4 awards · ₱8,384,091.46
- Department of the Interior and Local Government Goods & services: 1 award · ₱4,688,344.83
- Municipality of Glan, Sarangani Province Infrastructure: 1 award · ₱1,993,071.27
- Municipality of Tupi, South Cotabato Infrastructure: 2 awards · ₱1,980,480.60
- DPWH Goods & services: 1 award · ₱485,100.00
- Barangays and Sangguniang Kabataan Infrastructure: 2 awards · ₱365,951.42
- 25ME0083₱28,801,096.30· 2025-07-15· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS SARANGANI DISTRICT E
- 25ME0099₱5,751,531.39· 2025-07-15· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS SARANGANI DISTRICT E
- 25ME0105₱5,761,619.27· 2025-07-15· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS SARANGANI DISTRICT E
- 25ME0082₱15,362,023.24· 2025-07-15· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS SARANGANI DISTRICT E
- 25ME0080₱38,023,383.33· 2025-06-30· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS SARANGANI DISTRICT E
- 25MB0105 - Concreting of Brgy. Katangawan FMR, Brg₱9,921,940.59· 2025-06-24· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - SOUTH COTABATO 1S
- INFRA 2025-80
- INFRA-2025-84
- 25ME0112₱7,890,791.98· 2025-04-08· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS SARANGANI DISTRICT E
- 25ME0048₱79,497,601.66· 2025-03-24· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS SARANGANI DISTRICT E
- 25MG0034₱14,689,979.39· 2025-02-10· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - SOUTH COTABATO 2ND
- 25MB0118 - Construction of Multi-Purpose Building₱2,873,908.14· 2025-01-09· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - SOUTH COTABATO 1S
- 25MB0113 - Completion of Multi-Purpose Building₱4,801,411.28· 2025-01-09· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - SOUTH COTABATO 1S
- INFRA 2024-66
- INFRA 2024-48-2ND
- 24CW-GSC-021 1LOT
- Construction of 2-Storey with Roof Deck at Divisio
- 24MB0112 – REPAIR/MAINTENANCE OF DILG BUILDING TRA₱1,489,911.64· 2024-05-23· Other repair· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - SOUTH COTABATO 1S
- 24ME0010₱120,986,181.56· 2024-05-07· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS SARANGANI DISTRICT E
- 24MB0082 - Concreting of Brgy. Batomelong FMR, Brg₱14,874,669.57· 2024-04-22· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - SOUTH COTABATO 1S
- 24ME0084₱9,829,668.66· 2024-04-17· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS SARANGANI DISTRICT E
- 24ME0023₱4,919,487.46· 2024-03-26· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS SARANGANI DISTRICT E
- INFRA 2024-05
- 23MB0144 - Completion of Multi-Purpose Building₱19,778,930.31· 2023-09-21· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - SOUTH COTABATO 1S
- ITB 058-2023
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →