LAHDETH CONST AND SUPPLY is listed as a company organization in Philippine public procurement records on this site, with 67 linked DPWH project(s) totaling about ₱353,011,794.88. Recorded delivery grade A (from public DPWH project records — not a finding of wrongdoing).
LAHDETH CONST AND SUPPLY
AGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 67
- Total value
- ₱353,011,794.88
- Published flags
- 0
- Region
- Camarines Sur 1st DEO · Region V
Licensed officers (PCAB)
- Odessa Abarro Reyes · Authorized Managing Officer (PCAB license 34833) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for LAHDETH CONST AND SUPPLY — not an accusation or finding of wrongdoing.
Score: 94.40 / 100 · Projects in sample: 67 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 96.3/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 96.3
- lateCompletedProjects
- 5
- onTimeCompletedProjects
- 62
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 67
- pastTargetOngoingProjects
- 0
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 67
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 67
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 67
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 67
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 44 of 59 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- CONSTRUCTION OF TWO (2) STOREY, TWO (2) SCIENCE LABORATORY & TWO (2) ICT BUILDING, SIMEON TYCANGCO MEMORIAL HIGH SCHOOL, RAGAY, CAMARINES SUR18FN0073 · ₱26,860,000.00 · mapped
- CONSTRUCTION/IMPROVEMENT/REPAIR OF FLOOD CONTROL STRUCTURE ALONG SIBAGUAN RIVER (P003228LZ)STA.0+223.00 - STA.0+573.00SAGÑAY, CAMARINES SUR19FF0090 · ₱18,596,475.00 · mapped
- 001-ENSURE SAFE & RELIABLE NATIONAL RD. SYSTEM BRIDGE PROGRAM-WIDENING OF PERMANENT BRIDGES PILI DIV. BR. 1(B01182LZ) ALONG PILI DIVERSION RD.(PHASE 2) PILI CAMARINES SUR21FF0003 · ₱14,404,982.21 · mapped
- CLUSTER IX: CONST. OF CLASSROOMS (BATCH 4) I. JUAN F. TRIVIÑO MHS (FORMERLY: PASACAO SCHOOL OF FISHERIES)(BLDG. 1), PASACAO, CS; II. JUAN F. TRIVIÑO MHS (FORMERLY: PASACAO SCHOOL OF FISHERIES)(BLDG. 2), PASACAO, CS; III. JUAN F. TRIVIÑO MHS (FORMERLY: PAS17FD0071 · ₱14,209,479.47 · mapped
- REBLOCKING/WIDENING OF ROAD, BANGA-TAGBAC, RAGAY, CAMARINES SUR18FN0081 · ₱13,751,226.14 · mapped
- CLUSTER I: CONST. OF CLASSROOMS (BATCH 4) I. GAINZA NHS, GAINZA, CS; II. BAL-FLOR ES, MILAOR, CS; III. MILAOR CS, MILAOR, CS; IV. MILAOR NHS, MILAOR, CS17FD0060 · ₱13,350,432.53 · mapped
- CLUSTER VIII: CONST. OF CLASSROOMS (BATCH 4) I. CARANAN ES (NORTH), PASACAO, CS; II. CARANAN ES (SOUTH), PASACAO, CS; III. CUCO ES, PASACAO, CS; IV. ITULAN ES, PASACAO, CS; V. ROLANDO R. ANDAYA SR. MHS, PASACAO, CS17FD0070 · ₱13,302,373.08 · mapped
- CONSTRUCTION OF TWO(2) STOREY BUILDING WITH ONE (1) SCIENCE (GF) AND ONE (1) SCIENCE (SF) LABORATORY UNITS (UNDER DEPED CY 2018 BEFF) MEDROSO-MENDOZA NHS, CALABANGA CAMARINES SUR18FE0093 · ₱12,560,000.00 · mapped
- CONSTRUCTION OF LOCAL ROAD, BRGY. TIGBINAN, LABO, CAMARINES NORTE23FC0070 · ₱9,899,991.59 · mapped
- CONCRETING OF LA PURISIMA FARM TO MARKET ROAD, BRGY. LA PURISIMA, NABUA, CAMARINES SUR (STA. 0+600.00 - STA. 1+671.00)20FN0117 · ₱9,701,250.00 · mapped
- CONSTRUCTION OF TWO (2) STOREY, FOUR (4) CLASSROOM SCHOOL BUILDING, RAGAY CENTRAL SCHOOL, RAGAY, CAMARINES SUR18FN0068 · ₱9,686,000.00 · mapped
- MFO2-FLOOD MANAGEMENT SERVICE, CONST/MAINT OF FLOOD CONTROL MITI. STRUCT. AND DRAINAGE SYS, ARMENIA17FJ0037 · ₱9,167,374.45 · mapped
- INDV. PROJECT - RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, MAMPUAG BRIDGE (B00467LZ) ALONG NABUA - BALATAN ROAD, NABUA, CAMARINES SUR17FG0019 · ₱8,801,709.78 · mapped
- RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, MANG-IT BR. (B00471LZ) ALONG NABUA, BALATAN RD (LZ), BALATAN, CAMARINES SUR (K0490+130)20FN0012 · ₱8,197,529.43 · mapped
- REPAIR/REHAB/IMPROV OF DRAINAGE STRUCT. & SLOPE PROT. ALONG MAS-CAT-PLA ROAD, DIMASALANG, MASBATE17FJ0057 · ₱7,607,492.70
- INDV. PROJ. RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, TAPAYAS BRIDGE (B00470LZ) ALONG NABUA-BALATAN ROAD, BALATAN, CAMARINES SUR17FG0026 · ₱7,548,424.00 · mapped
- CONSTRUCTION OF MPB, DEL ROSARIO HIGH SCHOOL, NAGA CITY19FE0074 · ₱7,504,196.00 · mapped
- CONSTRUCTION /REHABILITATION OF MULTI PURPOSE BUILDING (MUNICIPAL HALL), SAN ISIDRO MAGARAO CAMARINES SUR21FF0061 · ₱5,939,959.51 · mapped
- CONSTRUCTION OF MULTI PURPOSE BUILDING,BRGY, SAN ISIDRO MAGARAO CAMARINES SUR20FF0098 · ₱5,398,688.00 · mapped
- CONSTRUCTION OF CLASSROOMS, BICAL ES, SAN FERNANDO, CAMARINES SUR20FE0139 · ₱5,205,437.84 · mapped
- CONSTRUCTION OF CLASSROOMS, GÑARAN ES, SAN FERNANDO, CAMARINES SUR20FE0135 · ₱5,009,897.70 · mapped
- LP:BUILDINGS AND OTHER STRUCTURES-MULTIPURPOSE/FACILITIES-LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY QUITANG, PASACAO, CAMARINES SUR20FE0007 · ₱4,950,000.00 · mapped
- LP: BUILDINGS AND OTHER STRUCTURES-MULTIPURPOSE/FACILITIES-LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY DEL ROSARIO, MILAOR, CAMARINES SUR20FE0005 · ₱4,950,000.00 · mapped
- REHABILITATION OF SIPOCOT PUBLIC CEMETERY, BRGY. SAN ISIDRO, SIPOCOT, CAMARINES SUR19FN0188 · ₱4,798,000.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), SITIO INTRAMUROS, BRGY. PANAYTAYAN, RAGAY, CAMARINES SUR19FN0095 · ₱4,797,180.00 · mapped
- BIP;ACCESS ROADS & /OR BRIDGES FROM THE NATIONAL ROAD LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONST. OF ROAD BRGY. CARANGCANG MAGARAO-BRGY SAN FRANCISCO BOMBON CAMARINES SUR24FF0056 · ₱4,771,337.20 · mapped
- CONCRETING OF LOURDES YOUNG FMR, BRGY. LOURDES YOUNG, NABUA, CAMARINES SURSTA. 0+000.00 STA. 0+225 (SECTION A)STA. 0+342.00 STA. 0+373 (SECTION B)STA. 0+393.00 STA. 0+680 (SECTION C)18FG0060 · ₱4,721,598.49 · mapped
- INDV. PROJECT - CONCRETING OF SAN VICENTE-BACOLOD ROAD, BRGY. SAN VICENTE, BATO, CAMARINES SUR17FG0003 · ₱4,702,472.32
- CONSTRUCTION OF COVERED COURT AT BRGY. TAMBO, PAMPLONA, CAMARINES SUR18FD0002 · ₱4,697,744.65 · mapped
- INDIVIDUAL PROJECT - CONCRETING OF ROAD, BARANGAY TAMBO, BUHI, CAMARINES SUR - STA. 0+870-STA 1+49717FG0031 · ₱4,697,550.00 · mapped
- CONSTRUCTION OF MULTI PURPOSE BUILDING (COVERED COURT) CARIGSA MAGARAO CAMARINES SUR21FF0060 · ₱3,937,091.84 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BRGY. PANAYTAYAN NUEVO, RAGAY, CAMARINES SUR19FN0082 · ₱3,838,930.00 · mapped
- CONSTRUCTION OF FOOTBRIDGE, BRGY. CABADISAN, RAGAY, CAMARINES SUR19FN0099 · ₱3,761,762.76 · mapped
- CONTRACT PACKAGE-V(1-2) CONCRETING OF VARIOUS ROADS IN NABUA AND BATO, CAM. SUR1. CONC. OF ROAD, ZONE 4 & 5, BRGY. LOURDES YOUNG, NABUA, CAM. SUR 2. CONC. OF ROAD, ZONE 4 & 7, BRGY. SAN VICENTE, BATO, CAM. SUR18FG0010 · ₱3,757,508.41 · mapped
- PROJECT CLUSTER 2018-001-CONSTRUCTION OF RAINWATER COLLECTION SYSTEM CAMARINES SUR 3RD CONGRESSIONAL DISTRICT18FE0055 · ₱3,165,836.90 · mapped
- RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, AGDANGAN BR. (B00452LZ) ALONG DAANG MAHARLIKA (LZ) K0458+32120FN0011 · ₱3,151,391.10 · mapped
- CONSTRUCTION OF MULTI PURPOSE BUILDING, NEW SAN ROQUE PILI CAMARINES SUR21FF0065 · ₱2,969,734.77 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING PHASE II, BRGY. CATABANGAN PROPER, RAGAY, CAMARINES SUR17FN0008 · ₱2,880,000.00
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (DAY CARE), BRGY. IRAYA, RAGAY, CAMARINES SUR19FN0111 · ₱2,878,880.00 · mapped
- CONSTRUCTION OF ONE (1) STOREY TWO (2) CLASSROOM SCHOOL BUILDING (SITE 2), AT COLACLING ELEMENTARY SCHOOL, LUPI, CAMARINES SUR17FN0050 · ₱2,855,700.00
- CONCRETING OF BARANGAY ROAD, (AMLONGON), BRGY. F. SIMEON, RAGAY, CAMARINES SUR19FN0121 · ₱2,821,177.93 · mapped
- CONSTRUCTION OF ONE (1) STOREY TWO (2) CLASSROOM SCHOOL BUILDING AT LUPI CENTRAL SCHOOL, LUPI, CAMARINES SUR17FN0051 · ₱2,682,900.00
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BRGY. BAGONG SILANG, DEL GALLEGO, CAMARINES SUR19FN0114 · ₱1,919,310.00 · mapped
- CONSTRUCTION OF SCHOOL BUILDING, PAMPLONA ELEMENTARY SCHOOL, BRGY. PAMPLONA, DEL GALLEGO, CAMARINES SUR19FN0107 · ₱1,919,130.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY PAMPLONA, DEL GALLEGO, CAMARINES SUR19FN0119 · ₱1,918,410.00 · mapped
- REHABILITATION OF RAGAY CENTRAL SCHOOL MULTI-PURPOSE BUILDING (GRANDSTAND), BRGY. POBLACION ILAOD, RAGAY, CAMARINES SUR19FN0132 · ₱1,918,350.00 · mapped
- REHABILITATION OF MULTI-PURPOSE BUILDING (SK BUILDING), BRGY. IRAYA, RAGAY, CAMARINES SUR19FN0038 · ₱1,918,000.00 · mapped
- REHABILITATION OF MULTI-PURPOSE BUILDING (CULTURAL CENTER), BRGY. ILAOD, RAGAY, CAMARINES SUR19FN0037 · ₱1,918,000.00 · mapped
- CONCRETING OF BARANGAY ROAD AT BRGY. BARRERA JR., LUPI, CAM. SUR17FN0029 · ₱1,887,566.60
- CONCRETING OF BARANGAY ROAD, BRGY. UPPER STA. CRUZ, RAGAY, CAMARINES SUR19FN0126 · ₱1,880,693.82 · mapped
Equipment & capacity
PCAB license
- License no.
- 34833
- Category
- B · Medium A
- Minimum net worth for this category
- ₱10,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱150M
- License valid until
- Jan 10, 2028
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 34833); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
No CPES evaluation lists this contractor's PCAB license in the GPPB releases we loaded (34th–41st).
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →