JQM CONST AND TRADING is listed as a company organization in Philippine public procurement records on this site, with 30 linked DPWH project(s) totaling about ₱351,633,781.30. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
JQM CONST AND TRADING
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 30
- Total value
- ₱351,633,781.30
- Published flags
- 0
- Region
- Pampanga 2nd DEO · Region III
Licensed officers (PCAB)
- Jaime Quinto Manalansan · Authorized Managing Officer (PCAB license 36354) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for JQM CONST AND TRADING — not an accusation or finding of wrongdoing.
Score: 89.20 / 100 · Projects in sample: 30 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 91.7/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 91.7
- lateCompletedProjects
- 5
- onTimeCompletedProjects
- 25
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 30
- pastTargetOngoingProjects
- 0
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 30
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 29
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 30
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 30
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
24 geotagged projects — Open full map · Download projects (CSV)
- CONST. OF REVETMENT WALL ALONG AKLAN RIVER INCLUDING OTHER STRUCTURES/FACILITIES, LIBACAO, AKLAN17GA0026 · ₱48,999,574.81
- ASSET PRESERVATION PROGRAMS- REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT MANAGEMENT-4 (HDM-4)- TERTIARY ALONG MABINAY- AYUNGON ROAD, AYUNGON, NEGROS ORIENTAL 1ST LD18RF0009 · ₱40,766,592.10 · mapped
- CONSTRUCTION OF 3-STOREY, 6 CLASSROOM SCHOOL BUILDING PANGHULO ELEMENTARY SCHOOL, OBANDO, BULACAN19CD0339 · ₱23,463,768.51 · mapped
- CONSTRUCTION OF SLOPE PROTECTION/FLOOD CONTROL AT BANGAN SEAWALL, STA.0+365 - STA. 0+455, BOTOLAN, ZAMBALES19CL0091 · ₱18,815,999.15 · mapped
- WIDENING OF PERMANENT BRIDGES, SAN LORENZO BR. (B01423LZ) ALONG OLONGAPO-BUGALLON ROAD, MASINLOC, ZAMBALES20CL0043 · ₱18,447,929.79 · mapped
- CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS TERTIARY ROADS SN ANTONIO-FLORIDABLANCA RD - K0082+281 - K0083+000, K0087+500 - K0088+222.40, FLORIDABLANCA, PAMPANGA21CH0083 · ₱15,854,152.53 · mapped
- WIDENING OF PERMANENT BRIDGES, LONGOS BR. (B01400LZ) OLONGAPO-BUGALLON ROAD, CABANGAN, ZAMBALES20CL0042 · ₱15,428,965.84 · mapped
- MFO 1-CONST'N & MAINTENANCE OF BRIDGES ALONG NAT'L RDS:REHABILITATION/MAJOR REPAIR OF PERMANENT BRID16B00012 · ₱14,614,634.32
- PREVENTIVE MAINTENANCE-SECONDARY ROADS OLONGAPO-BUGALLON ROAD, K0 247+000-K0 247 + 814.720CL0002 · ₱13,770,493.17 · mapped
- WIDENING OF PERMANENT BRIDGES, INCLUDING ROW, DIRITA BR. (B01437LZ) ALONG SAN MARCELINO- SAN ANTONIO- SAN NARCISO ROAD, SAN ANTONIO, ZAMBALES18CL0043 · ₱10,347,543.21 · mapped
- ASSET PRESERVATION-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS ALONG JESUS STREET18OH0040 · ₱10,181,821.17 · mapped
- IMPROVEMENT OF ROADS AND DRAINAGE ALONG TATALON-STO. ROSARIO ST., BRGY. UGONG, VALENZUELA CITY18OD0103 · ₱9,874,144.70 · mapped
- CONSTRUCTION OF ROAD ZONE 5, LOURDES, LUBAO, PAMPANGA18CH0105 · ₱9,796,336.87 · mapped
- CONSTRUCTION/REHABILITATION OF MULTI-PURPOSE BUILDING, BRGY. NORTH SIGNAL VILLAGE, TAGUIG CITY17OB0369 · ₱9,691,982.14 · mapped
- CONCRETING OF ZONE 1, BRGY. SAN JUAN FMR, BRGY. SAN JUAN, STA. RITA, PAMPANGA20CH0089 · ₱9,451,832.50 · mapped
- WIDENING OF PERMANENT BRIDGES, INCLUDING ROW, BEDDING BR. (B01438LZ) ALONG SAN MARCELINO- SAN ANTONIO- SAN NARCISO ROAD, SAN NARCISO, ZAMBALES18CL0040 · ₱9,362,640.53 · mapped
- REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROAD - SN FERNANDO - LUBAO RD - K0085+460 - K0085+645, LUBAO, PAMPANGA22CH0051 · ₱8,675,072.76 · mapped
- UPGRADING OF ROADS WITH DRAINAGE SYSTEM CAPT. SAMANO ROAD, BRGY. 175 (ALTERNATE ROAD LEADING TO DEPARO-CAMARIN RD.), CALOOCAN CITY18OD0152 · ₱8,364,380.00 · mapped
- WIDENING OF PERMANENT BRIDGES, ALUSIIS BR. (B01392LZ) ALONG OLONGAPO-BUGALLON ROAD, SAN NARCISO, ZAMBALES20CL0041 · ₱7,103,123.94 · mapped
- ORGANIZATIONAL OUTCOME 1 - ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM BRIDGE PROGRAM RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES - MUELLE DELA INDUSTRIA BR. (BO2625LZ) ALONG MUELLE DELA INDUSTRIA18OE0221 · ₱6,961,747.42 · mapped
- PROPOSED DRAINAGE IMPROVEMENT ALONG AYALA BLVD.,CONCEPTION STREET TO SAN MARCELINO STREET,ERMITA,MAN18OH0025 · ₱5,433,166.85 · mapped
- UPGRADING/CONCRETING OF ROAD AT STO. NINO, GUAGUA, PAMPANGA19CH0104 · ₱4,947,713.01 · mapped
- CONSTRUCTION OF ROAD, BRGY. LUBAC, GUAGUA, PAMPANGA24CH0103 · ₱4,943,529.71 · mapped
- LOCALLY-FUNDED PROJECTS, LOCAL INFRASTRUCTURE PROGRAM, ROADS AND BRIDGES-LOCAL BRIDGES, CONSTRUCTION OF FOOTBRIDGE AT CAMIA ST., LIMAY, BATAAN17CB0094 · ₱4,905,916.36
- CONCRETING OF PUROK 3, PALA PALANG BATA, BRGY. PALA- PALA FMR, BRGY. PALA-PALA, SAN ILDEFONSO, BULACAN18CD0283 · ₱4,772,764.09 · mapped
- REHABILITATION OF ROADS WITH DRAINAGE IMPROVEMENT ALONG JOSEFINA ST., BRGY. 114, CALOOCAN CITY15OD0216 · ₱3,963,682.74 · mapped
- CONSTRUCTION OF 1 STOREY 3 CL W/ TOILET, VICTORIA EAST CS, VICTORIA, TARLAC17CJ0170 · ₱3,885,128.06
- CONSTRUCTION OF 1 STOREY 3 CL W/ TOILET, MASALASA ES, VICTORIA, TARLAC17CJ0169 · ₱3,885,128.06
- CONSTRUCTION OF MULTI-PURPOSE BUILDING/EVACUATION CENTER, BARANGAY GALOC, CULION, PALAWAN17EE0049 · ₱2,953,189.68
- IMPROVEMENT OF MULTI-PURPOSE BUILDING PUROK 2, LUBAO, PAMPANGA21CH0068 · ₱1,970,827.28 · mapped
Equipment & capacity
PCAB license
- License no.
- 36354
- Category
- B · Medium A
- Minimum net worth for this category
- ₱10,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱150M
- License valid until
- Dec 13, 2027
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 36354); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
1 evaluation listed across 1 GPPB CPES release; average final rating 92.6% over 1 rated project; 1 site-visit rating. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Jun 3, 2019 | DPWH | ₱9,870,238.00 | Completed | 92.6% | 92.6% | 40th, p. 169 |
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →