EDCL CONST AND SUPPLY is listed as a company organization in Philippine public procurement records on this site, with 75 linked DPWH project(s) totaling about ₱2,712,263,414.22. Recorded delivery grade C (from public DPWH project records — not a finding of wrongdoing).
EDCL CONST AND SUPPLY
CGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 75
- Total value
- ₱2,712,263,414.22
- Published flags
- 2
- Region
- Davao City DEO · Region XI
Licensed officers (PCAB)
- Erick Obtial Lajo · Authorized Managing Officer (PCAB license 39587) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for EDCL CONST AND SUPPLY — not an accusation or finding of wrongdoing.
Score: 79.40 / 100 · Projects in sample: 75 · As of Oct 28, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 59.2/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 59.2
- lateCompletedProjects
- 7
- onTimeCompletedProjects
- 51
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 75
- pastTargetOngoingProjects
- 17
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 21%
- totalProjects
- 75
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 75
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 99.6/100 · Weight: 11%
- projects
- 75
- componentScore
- 99.6
- flagsPerProject
- 0.01
- publishedV2Flags
- 1
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 75
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 50 of 75 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- DAVAO CITY COASTAL BYPASS ROAD AT JCT. DAVAO-COTABATO ROAD-BAGO APLAYA-TALOMO-MATINA APLAYA-ROXAS AV18L00105 · ₱240,091,075.53 · mapped
- CONSTRUCTION OF CONCRETE ROAD - ISLAND GARDEN CITY OF SAMAL (IGACOS) CIRCUMFERENTIAL ROAD, DAVAO DEL NORTE24L00099 · ₱152,108,122.77 · mapped
- CONSTRUCTION OF CONCRETE ROAD-ISLAND GARDEN CITY OF SAMAL (IGACOS) CIRCUMFERENTIAL ROAD, DAVAO DEL NORTE23L00045 · ₱139,700,153.17 · mapped
- PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY ON SPECIFIC LOCATIONS ALONG DAANG MAHARLIKA (MN) (S00001MN) K1499+1002-K1502+150 & (S01460MN) CHAINAGE 1201- CHAINAGE 1684, DAVAO CITY20L00033 · ₱101,320,399.95 · mapped
- WIDENING OF BRIDGE-PANGI BRIDGE (B01881MN) ALONG DAVAO CITY DIVERSION ROAD, DAVAO CITY19L00009 · ₱97,556,840.90 · mapped
- CONSTRUCTION OF ROAD AT BRGY. PANDAITAN TO PARADISE EMBAK, PAQUIBATO DISTRICT, DAVAO CITY22LB0444 · ₱96,500,000.00 · mapped
- CONSTRUCTION (COMPLETION) OF 4-STOREY BUILDING, DPWH REGIONAL OFFICE XI, ADMINISTRATIVE, MANPOWER DEVELOPMENT AND FINANCIAL BUILDING, R. MAGSAYSAY AVENUE COR. CHAVEZ ST., DAVAO CITY (PACKAGE 1 AND 2)22L00122 · ₱96,321,567.65 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE (CONCRETE REVETMENT) ISING RIVER, CARMEN, DAVAO DEL NORTE24L00246 · ₱95,534,520.72 · mapped
- REHABILITATION OF SASA CREEK, SASA SECTION, DAVAO CITY19LB0254 · ₱86,850,000.00 · mapped
- CONSTRUCTION OF DRAINAGE STRUCTURE ALONG ROAD DAVAO CITY DIV. RD(S0013MN) -K1505+225 GOING TO OUTFALL (DAVAO RIVER)19LB0178 · ₱86,087,650.00 · mapped
- CONCRETING OF NHW JCT. LUN PADIDU - DAAN SUYAN LEADING TO IP COMMUNITIES IN UPPER SUYAN, MALAPATAN, SARANGANI PROVINCE25ME0059 · ₱79,563,762.40 · mapped
- Construction of Concrete Revetment along Mintal Creek, Sitio Basak Mintal Section, Sta. 0 + 000 - Sta. 0 + 750, Davao City23LH0011 · ₱71,928,738.54 · mapped
- CONSTRUCTION OF DRAINAGE STRUCTURE - DACUDAO RD - K1507 + (-068) - K1507 + 81320LB0067 · ₱69,094,000.00 · mapped
- Construction of Concrete Revetment along Mintal Creek, Sitio Basak (Mintal Section), Sta. 0 + 000 - Sta. 0 + 750, Davao City24LH0028 · ₱68,509,429.13 · mapped
- CONSTRUCTION OF DRAINAGE STRUCTURE - DACUDAO RD - K1509+(-732) - K1509+13520LB0068 · ₱68,495,700.00 · mapped
- Construction of Concrete Revetment along Lipadas River, Crossing Bayabas Section - Sta. 0 + 000 - Sta. 0 + 750, Davao City24LH0013 · ₱67,779,661.61 · mapped
- CABASAGAN PARALLEL BR. ALONG SURIGAO DEL SUR BDRY - DAVAO OR COASTAL RD, BOSTON, DAVAO ORIENTAL23LF0088 · ₱58,434,727.69 · mapped
- CONSTRUCTION OF ROAD, BARANGAY 76-A, DAVAO CITY24LB0048 · ₱57,625,282.86 · mapped
- REHABILITATION OF SEA WALL, PUROK 8, BARANGAY POBLACION, MALAPATAN, SARANGANI PROVINCE25ME0116 · ₱57,616,886.24 · mapped
- SURIGAO DEL SUR BDRY-DAVAO OR COASTAL RD - K1626+047 - K1627+892, CARAGA, DAVAO ORIENTAL24LF0068 · ₱57,395,385.75 · mapped
- CONSTRUCTION OF DRAINAGE STRUCTURE - JCT. DAANG MAHARLIKA ROAD-PALM DRIVE-PAG-ASA ST.-DUMANLAS ROAD-JCT. DIVERSION ROAD, DAVAO CITY24LB0017 · ₱55,644,795.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, (MALAPATAN COLLEGE OF SCIENCE AND TECHNOLOGY), MALAPATAN, SARANGANI PROVINCE25ME0115 · ₱49,459,933.21 · mapped
- CONCRETING OF ROAD, BARANGAY SALUMAY (HILL'S VIEW TO SITIO PATAG), MARILOG DISTRICT, DAVAO CITY22LH0142 · ₱48,769,979.66 · mapped
- BENIGNO S. AQUINO JR. NATIONAL HIGHWAY - K1561+954 - K1563+096, CATEEL, DAVAO ORIENTAL24LF0022 · ₱44,099,455.87 · mapped
- CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - JCT. DAANG MAHARLIKA - ELIONG - JCT. ACACIA ROAD, DAVAO CITY25L00023 · ₱43,060,849.20 · mapped
- CONSTRUCTION OF CONCRETE ROAD - FATIMA - MALABOG ROAD (MALABOG - GUMITAN), PACKAGE J, DAVAO CITY25L00029 · ₱42,990,742.94 · mapped
- SURIGAO DEL SUR BDRY-DAVAO OR COASTAL RD-K1639+874 - K1640+035, CARAGA, DAVAO ORIENTAL24LF0058 · ₱30,104,344.17 · mapped
- CONSTRUCTION OF 3STY8CL, NORBERTO G. BACARO SR. NATIONAL HIGH SCHOOL, DAVAO CITY, DAVAO DEL SUR23LH0113 · ₱29,439,937.36 · mapped
- JUNCTION NATIONAL HIGHWAY TO BRGY. ALEGRIA PROPER TO BRGY. SAN VICENTE, CATEEL, DAVAO ORIENTAL CONNECTING CATEEL PUBLIC TRANSPORT TERMINAL TO COCONUT, RICE AND CORN PROCESSING IN BRGY. ALEGRIA AND BRGY. SAN VICENTE IN SUPPORT TO AGRIBUSINESS: COCONUT, RIC24LF0032 · ₱29,398,703.20 · mapped
- Construction of Malapatan Flood Mitigation Structure, Malapatan, Sarangani24ME0037 · ₱29,385,001.95 · mapped
- CONSTRUCTION OF WATER SUPPLY SYSTEM, BRGY. PATAG; MALAPATAN, SARANGANI PROVINCE21ME0113 · ₱27,436,051.69 · mapped
- SURIGAO DEL SUR BDRY-DAVAO OR COASTAL RD-K1516+708-K1517+686, BOSTON, DAVAO ORIENTAL24LF0064 · ₱26,529,281.73 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE PROTECTING DAANG MAHARLIKA UP TO BUHISAN OUTFALL, STA. 0+000 - STA. 0+250, STA. 0+000 - STA. 0+200, BARANGAY TIBUNGCO, DAVAO CITY22LB0121 · ₱26,460,000.00 · mapped
- CONSTRUCTION OF BRGY. FATIMA TO SITIO LATUNGAN FMR IN PAQUIBATO, DAVAO CITY22LB0456 · ₱23,704,238.11 · mapped
- CONSTRUCTION OF CUT-OFF WALL AT CALINAN CREEK, STA. 0+000-STA. 0+250, BRGY. CALINAN POBLACION, CALINAN DISTRICT, DAVAO CITY24LH0029 · ₱23,679,036.51 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - F. TORRES BRIDGE DOWNSTREAM STREAM SECTION, DAVAO RIVER, BRGY. 9-A, DAVAO CITY20LB0337 · ₱22,854,696.04 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, F. TORRES BRIDGE DOWNSTREAM SECTION, DAVAO RIVER, BRGY. 9-A, DAVAO CITY20LB0202 · ₱19,800,000.00 · mapped
- CONSTRUCTION OF REVETMENT ALONG DAVAO RIVER, BOLTON BRIDGE DOWNSTREAM, BOLTON ISLA SECTION, LEFT BANK, DAVAO CITY20LB0234 · ₱19,600,000.00 · mapped
- CONSTRUCTION OF CONCRETE ROAD - JCT. TAGUM - PANABO CIRCUMFERENTIAL ROAD - MALITBOG - KASILAK TO JCT. CONSOLACION, DAVAO DEL NORTE22L00113 · ₱19,430,613.21 · mapped
- ROAD WIDENING - BUHANGIN-LAPANDAY -K1505+500 - K1505+86622LB0439 · ₱14,700,000.00 · mapped
- BENIGNO S. AQUINO JR. NATIONAL HIGHWAY-K1569+408-K1569+568, CATEEL, DAVAO ORIENTAL24LF0054 · ₱13,248,024.85 · mapped
- CONCRETING OF BRGY. DAAN SUYAN TO SITIO TUKALABTONG FMR, BRGY. DAAN SUYAN; MALAPATAN, SARANGANI PROVINCE21ME0115 · ₱12,106,541.44 · mapped
- CONCRETING OF PRK. SUMILOP, BRGY. MARILOG PROPER FMR, BRGY. MARILOG PROPER, DAVAO CITY23LH0102 · ₱11,600,147.89 · mapped
- CONSTRUCTION OF ROAD AT 1ST AVENUE, JUNA SUBD., MATINA CROSSING, DAVAO CITY20LB0195 · ₱10,718,425.28 · mapped
- CONCRETING OF KINAM, FMR, BRGY. KINAM, MALAPATAN, SARANGANI PROVINCE22ME0129 · ₱9,949,420.73 · mapped
- CONCRETING OF ROAD IN DDF VILLAGE, BARANGAY MANDUG (MAGSAYSAY ST., SAN ANTONIO ST. AND BONIFACIO ST.), DAVAO CITY, DAVAO DEL SUR21LB0233 · ₱9,900,000.00 · mapped
- CONST. (CONCRETING)OF ROAD CONNECTING BARANGAY KIHAN AND UPPER SUYAN, MALAPATAN, SARANGANI PROVINCE23ME0045 · ₱9,899,757.14 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING FOR MALAPATAN COMMUNITY COLLEGE, LUN PADIDU, MALAPATAN, SARANGANI PROVINCE24ME0107 · ₱9,859,944.50 · mapped
- CONSTRUCTION OF WATER SUPPLY SYSTEM, PUROK 12 AND PUROK 13, SITIO KINSE-KINSE, BRGY. SALAPAWAN, PAQUIBATO DISTRICT, DAVAO CITY, DAVAO DEL SUR22LB0141 · ₱9,800,000.00 · mapped
- CONSTRUCTION OF SOLAR WATER SYSTEM, BARANGAY PARAISO, ALABEL, SARANGANI PROVINCE23ME0089 · ₱9,796,321.11 · mapped
Equipment & capacity
PCAB license
- License no.
- 39587
- Category
- A · Medium B
- Minimum net worth for this category
- ₱30,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱300M
- License valid until
- Nov 2, 2027
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 39587); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
7 evaluations listed across 4 GPPB CPES releases; average final rating 91.5% over 1 rated project; 7 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Jun 24, 2025 | DPWH | 55,644,795.000 (₱ thousands, as printed; flagged) | On-going | 95.4% | — | 40th, p. 90 |
| Mar 21, 2025 | DPWH | ₱68,509,429.00 | Completed | 95.8% | 91.5% | 39th (rev), p. 59 |
| Nov 13, 2024 | DPWH | ₱55,644,795.00 | On-going | 94.6% | — | 39th (rev), p. 59 |
| Nov 12, 2024 | DPWH | ₱57,625,283.00 | On-going | 85.4% | — | 39th (rev), p. 59 |
| Jul 30, 2024 | DPWH (JV) | ₱152,108,123.00 | On-going | 94.3% | — | 38th, p. 69 |
| Jul 26, 2024 | DPWH | ₱67,829,780.00 | On-going | 88.7% | — | 38th, p. 69 |
| Aug 22, 2023 | DPWH | ₱70,203,689.00 | On-going | 95.7% | — | 36th, p. 63 |
1 amount flagged: the printed value is implausible for a ₱-thousands column or disagrees with the DPWH award, so we show it as printed instead of converting it.
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →