DREAMBUILD CONST INC is listed as a company organization in Philippine public procurement records on this site, with 13 linked DPWH project(s) totaling about ₱107,331,716.13. Recorded delivery grade C (from public DPWH project records — not a finding of wrongdoing).
DREAMBUILD CONST INC
CGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 13
- Total value
- ₱107,331,716.13
- Published flags
- 0
- Region
- Davao de Oro 1st DEO · Region XI
Licensed officers (PCAB)
- Emmanuel Gelverio Ponce · Authorized Managing Officer (PCAB license 44987) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for DREAMBUILD CONST INC — not an accusation or finding of wrongdoing.
Score: 71.90 / 100 · Projects in sample: 13 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 50/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 50
- lateCompletedProjects
- 0
- onTimeCompletedProjects
- 8
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 12
- pastTargetOngoingProjects
- 4
- undatedCompletedProjectsExcluded
- 1
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 13
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 13
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 13
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 13
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
12 geotagged projects — Open full map · Download projects (CSV)
- DAANG MAHARLIKA (MN) MAWAB-NABUNTURAN, MAWAB SECTION, DAVAO DE ORO21LA0233 · ₱19,597,669.34 · mapped
- CONCRETING OF BRGY. KIOKMAY FMR PHASE II, BRGY. LAAK, DAVAO DE ORO24LA0112 · ₱14,914,020.98 · mapped
- CONCRETING OF BRGY. MIPANGI FMR, BRGY. MIPANGI, NABUNTURAN, DAVAO DE ORO25LA0072 · ₱14,875,178.36 · mapped
- CONSTRUCTION OF CONCRETE ROAD, BRGY. TAGNOCON NABUNTURAN COMPOSTELA VALLEY20LA0264 · ₱14,403,586.12 · mapped
- CONSTRUCTION OF CONCRETE ROAD, CABACUNGAN NABUNTURAN, COMPOSTELA VALLEY PROVINCE20LA0202 · ₱9,525,375.99 · mapped
- CONSTRUCTION OF BRIDGE, SITIO PANAMIN-GAMAY, ELIZALDE, MACO, DAVAO DE ORO24LA0116 · ₱4,937,427.00 · mapped
- CONSTRUCTION OF BRIDGE, SITIO LIBUAC, ELIZALDE, MACO, DAVAO DE ORO24LA0104 · ₱4,937,280.17 · mapped
- KAPALONG (LUNA ELEMENTARY SCHOOL) - KAPALONG (SAMPAO ROAD) - KAPALONG (MAMACAO ROAD) CONNECTING TAGUM - PANABO CIRCUMFERENTIAL ROAD AND BANANA INDUSTRIES AND RUBBER INDUSTRIES, KAPALONG, DAVAO DEL NORTE22LC0067 · ₱4,900,000.00 · mapped
- SITIO PANDULIAN, MABANTAO-FLORIDA-SUAON ROAD LEADING TO KAPALONG WOODLAND RESORT, KAPALONG, DAVAO DEL NORTE22LC0061 · ₱4,899,999.84 · mapped
- CONSTRUCTION OF MULTI PURPOSE BUILDING, BARANGAY GOLDEN VALLEY, MABINI, DAVAO DE ORO25LA0083 · ₱4,657,168.79
- CONSTRUCTION OF CONCRETING OF ROAD, POBLACION (PUBLIC CEMETERY), MAWAB COMPOSTELA VALLEY PROVINCE20LA0187 · ₱3,810,230.92 · mapped
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, TAGBAROS ES, MACO, DAVAO DE ORO23LA0090 · ₱2,954,720.45 · mapped
- CONCRETING OF ROAD FROM NATIONAL HIGH WAY JUNCTION TO SITIO TAGAYTAY, BARANGAY MIPANGI, NABUNTURAN, DAVAO DE ORO21LA0150 · ₱2,919,058.17 · mapped
Equipment & capacity
PCAB license
- License no.
- 44987
- Category
- D · Small B
- Minimum net worth for this category
- ₱2,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱30M
- License valid until
- Nov 16, 2026
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 44987); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
5 evaluations listed across 2 GPPB CPES releases; average final rating 94.4% over 3 rated projects; 5 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Mar 25, 2025 | DPWH | ₱4,937,280.00 | Completed | 98.8% | 94.9% | 40th, p. 83 |
| Nov 6, 2024 | DPWH Prov. of | ₱4,937,280.00 | On-going | 92.3% | — | 39th (rev), p. 53 |
| Aug 19, 2024 | Davao de Prov. of Oro | ₱14,656,814.00 | Completed | 96.2% | 94.7% | 39th (rev), p. 53 |
| Aug 16, 2024 | Davao de Prov. of Oro | ₱2,761,377.00 | Completed | 93.2% | 93.6% | 39th (rev), p. 53 |
| Mar 19, 2024 | Davao de Oro | ₱14,656,814.00 | On-going | 93.7% | — | 39th (rev), p. 53 |
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
- DPWH Infrastructure: 13 awards · ₱107,013,218.69
- Province of Davao De Oro Infrastructure: 11 awards · ₱37,378,344.91
- Province of Compostela Valley Infrastructure: 9 awards · ₱32,101,501.92
- Municipality of Nabunturan, Compostela Valley Infrastructure: 6 awards · ₱21,594,888.85
- Province of Davao De Oro Goods & services: 1 award · ₱5,105,344.00
- Municipality of Nabunturan, Compostela Valley Goods & services: 4 awards · ₱4,280,702.42
- Municipality of Kapalong, Davao Del Norte Infrastructure: 1 award · ₱3,419,618.15
- Province of Compostela Valley Goods & services: 12 awards · ₱2,450,010.90
- Province of Davao Del Norte Goods & services: 1 award · ₱136,000.00
- LBP Goods & services: 3 awards · ₱69,080.00
- Construction Project CW25-010
- Construction Project CW25-016
- Construction Project CW25-011
- Construction Project CW25-004
- Road Concreting at Sitio Tinago, Brgy. Mainit, Nab
- 25LA0083₱4,657,168.79· 2025-07-15· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - DAVAO DE ORO 1ST D
- 25LA0072₱14,875,178.36· 2025-05-15· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - DAVAO DE ORO 1ST D
- Construction Project CW25-034
- Construction Project CW25-005
- Construction Project CW25-021
- Concreting of Access Rd. to Bayabas NHS at
- Construction Project CW24-026
- Construction Project CW24-028
- Construction Materials B-24-0144
- 24LA0112₱14,914,020.98· 2024-07-24· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - DAVAO DE ORO 1ST D
- Concreting of Roads-p13 Pob. Nab., DdO
- 24LA0116₱4,937,427.00· 2024-06-26· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - DAVAO DE ORO 1ST D
- 24LA0104₱4,937,280.17· 2024-05-28· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - DAVAO DE ORO 1ST D
- Installation of Streetlights, Mapawa, Maragusan
- Installation of Streetlights, Poblacion, Monkayo
- PAPER MULTI COPY
- MARKER, PERMANENT
- PAPER MULTIPURPOSE
- Construction Project CW23-068
- PO2023114265
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →