MITCH CONST CORP is listed as a company organization in Philippine public procurement records on this site, with 36 linked DPWH project(s) totaling about ₱512,847,087.13. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
MITCH CONST CORP
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 36
- Total value
- ₱512,847,087.13
- Published flags
- 0
- Region
- Davao de Oro 2nd DEO · Region XI
Online presence
Google Maps: Mitch Construction CorpGoogle Maps, 2026-10-22
PUROK 3 DURIAN WEST, San Miguel (Camp 4), Tagum, 8100 Davao del Norte
Licensed officers (PCAB)
- MARISSA GATLABAYAN GOMITO · Authorized Managing Officer (PCAB license 53396) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for MITCH CONST CORP — not an accusation or finding of wrongdoing.
Score: 80.50 / 100 · Projects in sample: 36 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 69.2/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 69.2
- lateCompletedProjects
- 0
- onTimeCompletedProjects
- 27
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 33
- pastTargetOngoingProjects
- 6
- undatedCompletedProjectsExcluded
- 3
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 36
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 36
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 36
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 36
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
36 geotagged projects — Open full map · Download projects (CSV)
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (RHU BUILDING), PHASE 4, MONKAYO, DAVAO DE ORO24LI0135 · ₱39,204,580.77 · mapped
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (RHU BUILDING), PHASE 5, MONKAYO, DAVAO DE ORO25LI0035 · ₱39,203,071.67 · mapped
- CONSTRUCTION OF BATUTU RIVER IRRIGATION SYSTEM KATIPUNAN ROAD - MC EAST, NEW BATAAN, DAVAO DE ORO (KATUBIGAN-KALSADA TUNGO SA PATUBIGAN)24LI0019 · ₱27,435,987.48 · mapped
- CONSTRUCTION OF 2STY6CL, CAMANSI NATIONAL HIGH SCHOOL, MONTEVISTA, DAVAO DE ORO23LI0129 · ₱24,951,192.92 · mapped
- REHABILITATION OF MULTI-PURPOSE BUILDING (RHU BUILDING) MONKAYO, DAVAO DE ORO23LI0014 · ₱24,748,933.01 · mapped
- ROAD WIDENING - BENIGNO S. AQUINO JR. NATIONAL HIGHWAY - K 1414+(-401) - K1414+10924LI0032 · ₱21,489,735.51 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, MONKAYO CENTRAL ELEMENTARY SCHOOL, BARANGAY POBLACION, MONKAYO, DAVAO DE ORO24LI0050 · ₱19,799,953.05 · mapped
- REHABILITATION (COMPLETION) OF MULTI-PURPOSE BUILDING (RURAL HEALTH UNIT BUILDING), MONKAYO, DAVAO DE ORO24LI0035 · ₱19,798,890.52 · mapped
- REHABILITATION OF MULTI-PURPOSE BUILDING (MUNICIPAL HALL) MONKAYO, DAVAO DE ORO23LI0007 · ₱19,798,659.81 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (MUNICIPAL MAYOR'S BUILDING), MUNICIPAL GROUNDS, COMPOSTELA, DAVAO DE ORO23LI0132 · ₱19,599,916.85 · mapped
- CONSTRUCTION/COMPLETION OF MULTI-PURPOSE BUILDING (MUNICIPAL HALL) AT POBLACION, COMPOSTELA, DAVAO DE ORO23LI0116 · ₱19,599,900.69 · mapped
- TUBO-TUBO - MAMUNGA ROAD IN SUPPORT OF RICE, BANANA, AND OIL PALM PRODUCTION, MONKAYO, DAVAO DE ORO24LI0022 · ₱19,596,526.53 · mapped
- CONSTRUCTION OF BATUTU RIVER IRRIGATION SYSTEM KATIPUNAN ROAD - MC EAST, NEW BATAAN DAVAO DE ORO (KATUBIGAN - KALSADA TUNGO SA PATUBIGAN)23LI0004 · ₱17,333,919.62 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (MOTORPOOL), DAVAO DE ORO 2ND DEO, BARANGAY MAPARAT, COMPOSTELA, DAVAO DE ORO25LI0042 · ₱15,522,546.19 · mapped
- CONCRETING OF BRGY. PAMACAUN FMR, BRGY. PAMACAUN, ASUNCION, DAVAO DEL NORTE23LC0077 · ₱14,922,034.12 · mapped
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (MONKAYO MUNICIPAL DOME), POBLACION, MONKAYO, DAVAO DE ORO24LI0080 · ₱14,847,000.00 · mapped
- ROAD WIDENING - BENIGNO S. AQUINO JR. NATIONAL HIGHWAY - K1606+850 - K1607+00024LI0037 · ₱14,313,726.77 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (MUNICIPAL HALL) AT POBLACION, COMPOSTELA, DAVAO DE ORO23LI0013 · ₱12,869,765.88 · mapped
- CONCRETING OF BRGY. NEW DALAGUETE FMR, BRGY. NEW DALAGUETE, MONTEVISTA, DAVAO DE ORO23LI0119 · ₱11,939,310.78 · mapped
- CONSTRUCTION OF ROAD FROM PRK 18 TO PRK 19 TO PRK 19-A, BRGY. MESAOY, NEW CORELLA, DAVAO DEL NORTE23LC0069 · ₱9,900,000.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY POBLACION, COMPOSTELA, DAVAO DE ORO24LI0034 · ₱9,899,812.56 · mapped
- CONSTRUCTION OF SOLAR WATER SYSTEM, COMPOSTELA, DAVAO DE ORO23LI0096 · ₱9,799,689.60 · mapped
- CONSTRUCTION OF SOLAR WATER SYSTEM, NEW BATAAN, DAVAO DE ORO23LI0089 · ₱9,799,313.85 · mapped
- REHABILITATION OF MULTI-PURPOSE BUILDING (RHU BUILDING), MONKAYO, DAVAO DE ORO24LI0115 · ₱9,719,624.66 · mapped
- CONSTRUCTION OF BATUTU RIVER IRRIGATION SYSTEM LAGAB ROAD - LATERAL C EAST, COMPOSTELA, DAVAO DE ORO (KATUBIGAN - KALSADA TUNGO SA PATUBIGAN)23LI0006 · ₱8,929,726.95 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT) AT PUROK 2A, BARANGAY SAMPAO, KAPALONG, DAVAO DEL NORTE23LC0041 · ₱5,939,963.30 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BARANGAY CAPUNGAGAN, KAPALONG, DAVAO DEL NORTE23LC0042 · ₱5,939,421.40 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT) AT PUROK 2, BARANGAY FLORIDA, KAPALONG, DAVAO DEL NORTE23LC0043 · ₱5,939,087.86 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (HALL OF JUSTICE), TAGUM CITY, DAVAO DEL NORTE23LC0047 · ₱5,932,548.27 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BARANGAY SONLON, ASUNCION, DAVAO DEL NORTE23LC0049 · ₱5,850,971.33 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (BRGY. HALL), BARANGAY DATU BALONG, SAN ISIDRO, DAVAO DEL NORTE23LC0086 · ₱5,789,751.60 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BRGY. SAN ISIDRO, TAGUM CITY, DAVAO DEL NORTE23LC0088 · ₱5,767,932.10 · mapped
- REHABILITATION OF MULTI-PURPOSE BUILDING (CONGRESSIONAL), BARANGAY POBLACION, COMPOSTELA, DAVAO DE ORO24LI0094 · ₱4,949,930.44 · mapped
- REHABILITATION OF MULTI-PURPOSE BUILDING (MONKAYO MUNICIPAL DOME) PHASE IV, BARANGAY POBLACION, MONKAYO, DAVAO DE ORO25LI0031 · ₱4,933,960.84 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT, EVACUATION BLDG.) BRGY. CAMONING, ASUNCION, DAVAO DEL NORTE23LC0092 · ₱4,819,850.20 · mapped
- IMPROVEMENT (COMPLETION ) OF MULTI-PURPOSE BUILDING (MONKAYO MUNICIPAL DOME), POBLACION MONKAYO, DAVAO DE ORO23LI0065 · ₱1,959,850.00 · mapped
Equipment & capacity
PCAB license
- License no.
- 53396
- Category
- B · Medium A
- Minimum net worth for this category
- ₱10,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱150M
- License valid until
- Sep 16, 2027
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 53396); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
3 evaluations listed across 2 GPPB CPES releases; average final rating 96.1% over 2 rated projects; 3 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Jul 23, 2024 | DPWH | ₱21,215,724.00 | On-going | 95.4% | — | 38th, p. 164 |
| Jan 31, 2024 | NIA | ₱9,435,660.00 | Completed | 95.3% | 95.3% | 37th, p. 71 |
| Dec 1, 2023 | DPWH 11/17/2023 NHA 49,610.000 210 O 0.348 0.192 - 0.030 0.040 - #VALUE! - On-Going | ₱5,932,548.00 | Completed | 96.8% | 96.8% | 37th, p. 71 |
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
- DPWH Infrastructure: 37 awards · ₱477,577,454.36
- Province of Davao Del Norte Infrastructure: 9 awards · ₱49,671,438.09
- DPWH Goods & services: 12 awards · ₱29,836,125.72
- Municipality of Compostela, Compostela Valley Infrastructure: 4 awards · ₱14,928,905.33
- Davao de Oro State College Goods & services: 2 awards · ₱9,944,004.15
- NIA Goods & services: 1 award · ₱9,435,659.98
- DepEd Infrastructure: 1 award · ₱3,244,092.42
- Municipality of Compostela, Compostela Valley Goods & services: 1 award · ₱1,585,000.00
- Municipality of Monkayo, Compostela Valley Infrastructure: 1 award · ₱1,363,381.73
- Municipality of Katipunan, Zamboanga Del Norte Goods & services: 1 award · ₱1,269,992.00
- Province of Davao Del Norte Goods & services: 3 awards · ₱422,705.00
- Province of Davao De Oro Goods & services: 2 awards · ₱140,081.00
- B20251539/2025010213
- 25LC0081 Repair/Maintenance of Drainage Structure₱1,985,929.79· 2025-07-17· Other repair· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - DAVAO DEL NORTE DE
- 25GNE0022 (Re-Ad)
- B20250047/2024126917
- PO2025030419
- 25LC0080 Repair/Maintenance of DILG Building
- 25LI0042₱15,522,546.92· 2025-03-24· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - DAVAO DE ORO 2ND D
- 24LI0135₱39,204,580.77· 2025-03-24· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - DAVAO DE ORO 2ND D
- B20250025/2024126925
- Powerhouse
- B20246147/2024126921
- B20246138/2024126912
- B20245748/2024106495
- 25LI0035₱39,203,071.67· 2025-02-10· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - DAVAO DE ORO 2ND D
- OUTDOOR FITNESS & PLAYGROUND EQUIPMENT
- 24GL00052 P.R. No. 2024-10-170 DATED 10/04/2024
- TLS CONSTRUCTION₱3,244,092.42· 2024-11-21· School building / classroom· DEPARTMENT OF EDUCATION - DIVISION OF COMPOSTELA VALLEY
- 24LC0096 Rehabilitation of Damaged/Collapsed/
- 2024-07-0085 Supply and Delivery of spare parts
- 2024-07-0074 Category 10 (71x)
- 2024-07-0072 Category 12 (41x)
- 2024-06-0054 Supply and Delivery of Spare Parts
- 2024-06-0053 Supply and Delivery of Spare Parts
- 2024-06-0059 Purchase and Delivery of Materials
- 24LI0115₱9,719,624.66· 2024-06-24· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - DAVAO DE ORO 2ND D
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →