HENSCHA PHILS INC is listed as a company organization in Philippine public procurement records on this site, with 55 linked DPWH project(s) totaling about ₱1,806,642,264.25. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
HENSCHA PHILS INC
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 55
- Total value
- ₱1,806,642,264.25
- Published flags
- 0
- Region
- Metro Manila 1st DEO · National Capital Region
Online presence
Licensed officers (PCAB)
- Danilo Osorio Flores · Authorized Managing Officer (PCAB license 34164) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for HENSCHA PHILS INC — not an accusation or finding of wrongdoing.
Score: 87.00 / 100 · Projects in sample: 55 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 81.3/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 81.3
- lateCompletedProjects
- 17
- onTimeCompletedProjects
- 37
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 55
- pastTargetOngoingProjects
- 1
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 55
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 55
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 55
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 55
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 44 of 49 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- REHAB./RECONST. OF NAT'L RD WITH SLOPE COLLAPSE & LANDSLIDE INCL. RD UPGRADING17L00156 · ₱144,749,737.86 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, IMPROVEMENT/REHABILITATION OF FLOOD CONTROL STRUCTURE AT CANSAGA RIVER, PHASE III,CONSOLACION, CEBU PROVINCE17H00023 · ₱96,499,958.70
- REHAB./RECONST./UPGRADING OF DAMAGED PNR INCL. DRAINAGE OROQ.CITY-PLARIDEL-CALAMBA-SAPANG DALAGA RD,15K00225 · ₱89,909,482.45 · mapped
- CONSTRUCTION OF RIVER CONTROL ALONG PANAY RIVER BASIN, BARANGAY POBLACION ILAYA, DUMALAG, CAPIZ24GP0031 · ₱78,527,280.87 · mapped
- CONSTRUCTION OF FOUR (4) STOREY, THIRTY SIX (36) CLASSROOM, SAN PERFECTO ELEMENTARY SCHOOL, CITY OF SAN JUAN CITY17OB0445 · ₱67,061,862.90
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG JIBATANG RIVER (UPSTREAM), CALBAYOG CITY, SAMAR18IJ0020 · ₱65,213,982.07 · mapped
- REHAB./RECONST./UPGRADING OF DAMAGED PNR INCL. DRAINAGE BASED ON PMS/HDM-4,OZAMIS CITY-OROQ.CITY RD17K00052 · ₱55,487,447.08 · mapped
- CONSTRUCTION OF FOUR (4) STOREY, TWENTY FOUR (24) CLASSROOM, CIPRIANO P. STA. TERESA ELEMENTARY SCHOOL, TAGUIG CITY17OB0463 · ₱55,341,609.35 · mapped
- CONSTRUCTION OF FOUR (4) STOREY TWELVE (12) CLASSROOM WITH ROOFDECK, TIPAS NATIONAL HIGH SCHOOL, TAGUIG CITY19OB0443 · ₱54,468,931.74 · mapped
- CONSTRUCTION OF FOUR (4) STOREY, SIXTEEN (16) CLASSROOM, PATEROS ELEMENTARY SCHOOL, PATEROS, METRO MANILA17OB0444 · ₱47,100,010.94 · mapped
- BANK IMPROVEMENT/PROTECTION ALONG PATEROS RIVER, BRGY.TABACALERA, PATEROS, METRO MANILA18OB0212 · ₱45,813,215.20 · mapped
- BANK IMPROVEMENT/PROTECTION ALONG PATEROS RIVER, BRGY. STO. ROSARIO-KANLURAN, PATEROS, METRO MANILA18OB0211 · ₱45,789,090.29 · mapped
- CONSTRUCTION OF CONCRETE REVETMENT ALONG TALOMO RIVER, RIVERSIDE-TUGBOK SECTION, TUGBOK, DAVAO CITY20LH0034 · ₱45,596,921.73 · mapped
- BANK IMPROVEMENT/PROTECTION ALONG PATEROS RIVER, (PHASE II), BRGY. STO. ROSARIO-KANLURAN PATEROS, METRO MANILA19OB0121 · ₱45,596,121.36 · mapped
- BANK IMPROVEMENT/PROTECTION ALONG PATEROS RIVER, (PHASE II),BRGY. AGUHO, PATEROS, METRO MANILA19OB0123 · ₱45,571,698.91 · mapped
- BANK IMPROVEMENT/PROTECTION ALONG PATEROS RIVER, (PHASE II), BRGY. TABACALERA PATEROS, METRO MANILA19OB0122 · ₱45,547,772.37 · mapped
- BANK IMPROVEMENT/PROTECTION ALONG PATEROS RIVER (PHASE VIII) BRGY. MARTIREZ, PATEROS, METRO MANILA19OB0337 · ₱45,451,198.67 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF RIVER CONTROL ALONG TANGYAN RIVER, IGBARAS, ILOILO19GF0022 · ₱42,800,241.24 · mapped
- CONSTRUCTION OF 2-UNIT 3 STOREY 15 CLASSROOM SCHOOL BUILDING AT ANTIQUE VOCATIONAL SCHOOL, BUGASONG,16GB0229 · ₱41,954,403.96 · mapped
- CONSTRUCTION / REHABILITATION OF OROQUIETA CITY - SEBUCAL - MANSAWAN - DON VICTORIANO ROAD, OROQUIETA CITY, STA. 00+000 - STA. 00+621 (SECTION 1) STA. 13+673 - STA. 15+052 (SECTION 2)16KI0010 · ₱41,087,162.68
- CONSTRUCTION OF FOUR (4) STOREY, TWENTY (20) STOREY CLASSROOM, BAGONG ILOG ELEMENTARY SCHOOL, PASIG CITY17OB0384 · ₱40,945,557.80 · mapped
- CONSTRUCTION OF FOUR (4) STOREY, TWELVE (12) CLASSROOM, MAYBUNGA ELEMENTARY SCHOOL, PASIG CITY18OB0460 · ₱40,078,679.38 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. KALUMPANG, MARIKINA CITY19OB0214 · ₱38,376,691.10 · mapped
- CONSTRUCTION OF TANGYAN RIVER CONTROL, IGBARAS, ILOILO20GF0023 · ₱35,218,556.95 · mapped
- CONSTRUCTION OF EVACUATION CENTER, UBAY, BOHOL PROVINCE17H00038 · ₱34,739,570.79 · mapped
- CONSTRUCTION OF FOUR (4) STOREY, TWELVE (12) CLASSROOM, CIRIACO P. TINGA ELEMENTARY SCHOOL, TAGUIG CITY17OB0448 · ₱30,975,710.29 · mapped
- CONSTRUCTION OF GUIMBAL FLOOD CONTROL PROJECT, MANCILLAS, GUIMBAL, ILOILO18GF0007 · ₱28,918,985.56 · mapped
- REHABILITATION/CONSTRUCTION OF GABION REVETMENT NAUJAN, (MAG - ASAWANG TUBIG) BRGY. TAGUMPAY, NAUJAN, ORIENTAL MINDORO18ED0037 · ₱28,114,411.77 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BRGY. KAPITOLYO, PASIG CITY16OB0214 · ₱27,937,238.95
- CONSTRUCTION OF CLASSROOMS AT PARAÑAQUE NATIONAL HIGH SCHOOL-DON GALO ANNEXPARAÑAQUE CITY, METRO MANILA16OC0065 · ₱27,483,507.46 · mapped
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, SAN PERFECTO ELEMENTARY SCHOOL, SAN JUAN CITY22OB0249 · ₱21,751,088.25 · mapped
- RENOVATION/CONSTRUCTION OF TWO (2) STOREY BUILDING (PLANNING AND CONSTRUCTION) METRO MANILA 1 DISTRICT ENGINEERING OFFICE (MM1DEO), BRGY. ROSARIO, PASIG CITY18OB0216 · ₱21,457,102.56 · mapped
- CONSTRUCTION OF FOUR (4) STOREY, EIGHT (8) CLASSROOM, RICARDO P. CRUZ SR. ELEMENTARY SCHOOL, NEW LOWER BICUTAN, TAGUIG CITY17OB0435 · ₱20,392,741.36 · mapped
- CONSTRUCTION OF TANGYAN RIVER CONTROL, IGBARAS, ILOILO18GF0008 · ₱19,564,305.90 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (INCLUDING ROOF DECK AND FACILITIES), SAN PERFECTO ELEMENTARY SCHOOL, SAN JUAN CITY18OB0330 · ₱19,203,077.63 · mapped
- CONSTRUCTION OF RIVER CONTROL ALONG BRGY. EVANGELISTA, NAUJAN, ORIENTAL MINDORO18ED0050 · ₱18,707,233.32 · mapped
- CONSTRUCTION OF SLOPE PROTECTION AND DRAINAGE OUTFALL INCLUDING LATERALS, STO. ROSARIO RIVER, BRGY. STO. ROSARIO KANLURAN, PATEROS, METRO MANILA18OB0174 · ₱18,334,889.47 · mapped
- CONSTRUCTION OF FOUR (4) STOREY, SEVEN (7) CLASSROOM, BAGUMBAYAN NATIONAL HIGH SCHOOL, TAGUIG CITY17OB0437 · ₱16,390,673.98 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEM OF JARAO RIVER, GUIMBAL, ILOILO17GF0046 · ₱15,804,507.67
- CONSTRUCTION OF TWO (2) STOREY BUILDING OF QUALITY ASSURANCE OFFICE INCLUDING LABORATORIES, DPWH METRO MANILA 1ST ENGINEERING OFFICE, BRGY. ROSARIO, PASIG CITY19OB0031 · ₱14,248,322.09 · mapped
- CONSTRUCTION OF RETAINING WALL AND REHABILITATION OF STA. ANA RIVER AT BRGY. SAN ROQUE, PATREROS, TAGUIG CITY18OB0263 · ₱13,736,653.52 · mapped
- CONSTRUCTION OF STO. ROSARIO RIVER DRAINAGE OUTFALL INCLUDING LATERALS, BRGY. STA. ANA, TAGUIG CITY18OB0176 · ₱13,729,158.03 · mapped
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING INCLUDING FIRE PROTECTION AND FACILITIES, SAN PERFECTO ELEMENTARY SCHOOL, SAN JUAN CITY21OB0004 · ₱11,348,337.89 · mapped
- CONCRETING OF BRGY. BIASONG, BRGY. BIASONG, LOPEZ JAENA15KI0093 · ₱9,787,836.03 · mapped
- REHABILITATION OF DRAINAGE SYSTEM INCLUDING CURBS & GUTTER, AMANG RODRIGUEZ AVE., PASIG CITY20OB0083 · ₱9,298,927.60 · mapped
- REPAIR/REHABILITATION OF 4-STOREY MULTI-PURPOSE BUILDING AT BRGY. SAGAD, PASIG CITY20OB0191 · ₱4,740,721.06 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING ,BAYANAN ELEM. SCHOOL UNIT -1, MUNTINLUPA CITY17OI0057 · ₱4,555,282.28
- CONSTRUCTION/COMPLETION OF MULTI-PURPOSE BUILDING (PHASE 2) BRGY. CALUMPANG, MARIKINA CITY19OB0205 · ₱3,837,393.40 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. KALUMPANG, MARIKINA CITY18OB0204 · ₱3,835,199.14 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. MAYBUNGA, PASIG CITY19OB0034 · ₱3,799,939.06 · mapped
Equipment & capacity
PCAB license
- License no.
- 34164
- Category
- AAA · Large B
- Minimum net worth for this category
- ₱180,000,000.00
- Allowable range of contract cost (ARCC)
- ₱450M or above (no published ceiling)
- License valid until
- Nov 4, 2027
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 34164); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
2 evaluations listed across 2 GPPB CPES releases; 2 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Mar 20, 2025 | DPWH (JV) | ₱78,527,280.00 | On-going | 93.6% | — | 39th (rev), p. 85 |
| Aug 29, 2019 | DPWH | ₱45,547,792.00 | On-going | 69.9% | — | 40th, p. 132 |
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →