THUNDERHEADS CONST CORP is listed as a company organization in Philippine public procurement records on this site, with 18 linked DPWH project(s) totaling about ₱200,330,613.25. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
THUNDERHEADS CONST CORP
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 18
- Total value
- ₱200,330,613.25
- Published flags
- 0
- Region
- Southern Mindoro DEO · Region IV-B
Licensed officers (PCAB)
- Mariphe Morillo Goco · Authorized Managing Officer (PCAB license 22420) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for THUNDERHEADS CONST CORP — not an accusation or finding of wrongdoing.
Score: 89.20 / 100 · Projects in sample: 18 · As of Oct 28, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 100/100 · Weight: 50%
- graceDays
- 30
- componentScore
- 100
- lateCompletedProjects
- 0
- onTimeCompletedProjects
- 18
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 18
- pastTargetOngoingProjects
- 0
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 22%
- totalProjects
- 18
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 22%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 18
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 18
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
Component score: 98.6/100 · Weight: 6%
- projects
- 18
- componentScore
- 98.6
- linkedObservations
- 1
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
14 geotagged projects — Open full map · Download projects (CSV)
- OFF - CARRIAGEWAY IMPROVEMENT: SHOULDER PAVING CALAPAN SOUTH ROAD - K0085+737 - K0085+938, K0090+750 - K0090+803, K0144+537 - K0144+835, K0147+063 - K0147+240, K0147+380 - K0148+568, K0148+980 - K0149+120, K0149+400 - K0149+680, K0149+900 - K0149+960, K0118EI0083 · ₱53,176,078.45 · mapped
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS, LEADING TO PINAMALAYAN AIRPORT ROAD, PINAMALAYAN, ORIENTAL MINDORO17EI0051 · ₱23,808,734.24
- CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO AIRPORTS (KALSADA TUNGO SA PALIPARAN) PINAMALAYAN AIRPORT ROAD, PINAMALAYAN, ORIENTAL MINDORO21EI0041 · ₱19,599,917.16 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, CONSTRUCTION OF BANSUD RIVER CONTROL, BANSUD, ORIENTAL MINDORO20EI0094 · ₱14,699,153.69 · mapped
- CONSTRUCTION/IMPROVEMENT/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS SECONDARY ROAD - CALAPAN SOUTH ROAD - K0068 + 643 - K0069 + 060, PINAMALAYAN, ORIENTAL MINDORO21EI0034 · ₱13,654,665.61 · mapped
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO AIRPORTS: AGOS II BRIDGE ALONG PINAMALAYAN AIRPORT ROAD, PINAMALAYAN, ORIENTAL MINDORO17EI0063 · ₱11,992,554.83
- CONST./REP./REHAB./IMPV'T. OF VARIOUS FLOOD CONTROL & DRAINAGE STRUCTURE, CONSTRUCTION OF FLOOD CONTROL, BAROC RIVER, ROXAS, ORIENTAL MINDORO17EI0006 · ₱9,525,645.16
- CONCRETING OF BARANGAY ROADS BRGY. DUONGAN - MALABO - SAN NARCISO ROAD, VICTORIA, ORIENTAL MINDORO19ED0087 · ₱9,496,877.99 · mapped
- CONCRETING OF SITIO STA. MARIA FMR, BRGY. SALCEDO, BANSUD, ORIENTAL MINDORO18EI0116 · ₱9,445,321.18 · mapped
- ROAD WIDENING ALONG CALAPAN NORTH RD K0008+575 - K0009+000, K0019+000 - K0019+277, CALAPAN CITY AND BACO, ORIENTAL MINDORO21ED0069 · ₱7,675,356.67 · mapped
- CONCRETING OF SITIO QUINABAN IN BARANGAY SAN JOSE, BONGABONG, ORIENTAL MINDORO19EI0143 · ₱4,947,636.61 · mapped
- CONSTRUCTION OF MULTI - PURPOSE BUILDING (SENIOR CITIZEN CENTER), GLORIA, ORIENTAL MINDORO19EI0151 · ₱4,821,967.25 · mapped
- CONSTRUCTION MULTI - PURPOSE BUILDING AT BARANGAY CACAWAN, PINAMALAYAN, ORIENTAL MINDORO21EI0009 · ₱3,959,963.33 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BRGY. PROPER BANSUD, BANSUD, ORIENTAL MINDORO19EI0011 · ₱2,949,418.92 · mapped
- CONCRETING OF ROAD, BRGY. NABUSLOT & BRGY. PALAYAN ROAD, PINAMALAYAN, ORIENTAL MINDORO18EI0038 · ₱2,925,004.75 · mapped
- CONSTRUCTION OF MULTI - PURPOSE BUILDING (COVERED COURT), BARANGAY MALO, BANSUD, ORIENTAL MINDORO19EI0133 · ₱2,900,334.94 · mapped
- CONSTRUCTION OF MULTI - PURPOSE BUILDING (COVERED COURT), BARANGAY SITE, TIGUISAN BANSUD, ORIENTAL MINDORO19EI0131 · ₱2,870,999.74 · mapped
- CONCRETING OF BRGY. CALINGAG FARM TO MARKET ROAD, BRGY. CALINGAG, PINAMALAYAN, ORIENTAL MINDORO16EI0034 · ₱1,880,982.73
Equipment & capacity
PCAB license
- License no.
- 22420
- Category
- D · Small B
- Minimum net worth for this category
- ₱2,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱30M
- License valid until
- Jan 31, 2027
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 22420); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
1 evaluation listed across 1 GPPB CPES release; average final rating 90.0% over 1 rated project; 1 site-visit rating. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Nov 23, 2022 | NIA | ₱21,578,666.00 | Completed | 90.0% | 90.0% | 35th, p. 172 |
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
- NIA Infrastructure: 28 awards · ₱165,220,027.71
- DPWH Infrastructure: 29 awards · ₱123,807,037.32
- Province of Oriental Mindoro Infrastructure: 25 awards · ₱23,652,155.80
- NIA Goods & services: 2 awards · ₱2,201,140.42
- Province of Oriental Mindoro Goods & services: 1 award · ₱256,576.00
- PB MOMARO-011-2022
- PB MOMARO-018-2021
- PB MOMARO-022-2021
- PB MOMARO-021-2021
- PBMOMARO-007-2021
- Improvement of Multi-Purpose Building at Zone IV,
- Construction of Barangay Stage at Bacungan, Pinama
- PB MOMARO-0029-2020
- PPB MOMARO-013-2020
- 20EI0094 - Construction of Bansud River Control, B₱14,174,071.92· 2020-01-31· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - SOUTHERN MINDORO D
- PB MOMARO-021-A-2019
- CONSTRUCTION OF BONGABONG RIP SUPPLEMENAL POW (CON
- 19EI0151 - Construction of MPB (Senior Citizen Cen₱4,821,967.25· 2019-07-08· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - SOUTHERN MINDORO E
- Concreting of Barangay Roads Brgy. Duongan – Malab₱9,496,877.99· 2019-07-05· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - MINDORO ORIENTAL D
- 19EI0143-Conc of Sitio Quinaban in Barangay San Jo₱2,785,120.66· 2019-06-27· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - SOUTHERN MINDORO E
- 19EI0133-Const of MPB(CC), Barangay Malo, Bansud,₱2,800,334.94· 2019-06-24· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - SOUTHERN MINDORO E
- 19EI0131-Const of MPB(CC),Barangay Site, Tiguisan₱2,802,324.43· 2019-06-24· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - SOUTHERN MINDORO E
- 19EI0011-Const of MPB(CC), Brgy. Proper Bansud, Ba₱2,816,862.18· 2019-05-24· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - SOUTHERN MINDORO E
- PB MOMARO-008-2019
- Concreting of Road at Brgy. Polusahi, Bongabong, O
- Concreting of Mayabig-Mangangan Road, Baco, Orient
- PB MOMARO-060-2018
- Construction of Stage at Carmundo NHS, Bongabong,
- PB MOMARO-005-2018
- PB MOMARO-009-B-2018
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →