WILLIAM UY CONST CORP 560 is listed as a company organization in Philippine public procurement records on this site, with 10 linked DPWH project(s) totaling about ₱1,354,544,778.12. Recorded delivery grade C (from public DPWH project records — not a finding of wrongdoing).
WILLIAM UY CONST CORP 560
CGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 10
- Total value
- ₱1,354,544,778.12
- Published flags
- 0
- Region
- Region II · Region II
Public Record Grade
A transparent, data-derived summary of reported public records for WILLIAM UY CONST CORP 560 — not an accusation or finding of wrongdoing.
Score: 74.00 / 100 · Projects in sample: 10 · As of Oct 22, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 58.3/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 58.3
- lateCompletedProjects
- 2
- onTimeCompletedProjects
- 6
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 10
- pastTargetOngoingProjects
- 2
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 10
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 10
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 10
- componentScore
- —
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 10
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
10 geotagged projects — Open full map
- OO 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM: REPLACEMENT OF PERMANENT WEAK BRIDGES: SAN PEDRO BRIDGE (B04450LZ) ALONG NRJ VILLA SUR-SAN PEDRO-CABUA-AN-YSMAEL-DISIMUNGAL ROAD, MADDELA, QUIRINO19B00043 · ₱538,743,981.34 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS SECONDARY ROADS NUEVA VIZCAYA IFUGAO RD K0283+ (-463)- K0283+073, K0284+365-K0289+01024BI0098 · ₱144,750,000.00 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE TERTIARY ROADS BAMBANG KASIBU - SOLANO RD K0250+1192 K0254+00025BI0067 · ₱143,240,775.17 · mapped
- MFO 1: NAT'L ROAD NETWORK SERVICES: CONST'N AND MAINTENANCE OF BRIDGES ALONG NAT'L ROADS REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES PRIMARY REHABILITATION/MAJOR REPAIR OF BRIDGE, BUNTUN BRIDGE (B01926LZ), ALONG CAGAYAN-APAYAO ROAD, K0486+280, TUGUEG17B00039 · ₱125,449,751.35 · mapped
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR, ROADS THAT TRAVERSE) - REHABILITATION/MAJOR REPAIR OF BUNTUN BRIDGE ALONG CAGAYAN-APAYAO ROAD (SOLANA SECTION)22BD0110 · ₱101,325,000.00 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS MAHARLIKA HIGHWAY - K0211+000 - K0211+520, K0212+625 - K0213+168, K0218+138 - K0218+758, K0218+758 - K0218+810, K0218+810 - K0218+960,25B00076 · ₱96,354,426.22 · mapped
- BRIDGE PROGRAM - REPLACEMENT OF PERMANENT WEAK BRIDGES - NALUNGTUTAN BR. (B04452LZ) ALONG JCT. ABBAG-GUINGIN BDRY RD, K0384+309, NAGTIPUNAN, QUIRINO19BK0046 · ₱88,779,995.15 · mapped
- WIDENING OF PERMANENT BRIDGE17BH0009 · ₱59,251,000.00 · mapped
- WIDENING OF PERMANENT BRIDGES: BUDBURAN BR. (B00233MR) ALONG CALAPAN SOUTH ROAD, MANSALAY, ORIENTAL MINDORO24EI0068 · ₱48,994,043.27 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER 11239: INSTALLATION/APPLICATION OF SIGNAGE-WARNING, ADVISORY AND REGULATORY SIGNS AND PAVEMENT MARKINGS ALONG DAANG (LZ) - K0262+360 - K0263+700, BAYOMB24B00099 · ₱7,655,805.62 · mapped
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
