TRIPLE S BUILDERS INC is listed as a company organization in Philippine public procurement records on this site, with 70 linked DPWH project(s) totaling about ₱1,360,303,457.84. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
TRIPLE S BUILDERS INC
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 70
- Total value
- ₱1,360,303,457.84
- Published flags
- 2
- Region
- Nueva Ecija 2nd DEO · Region XI
Licensed officers (PCAB)
- ARJAY G. HERMOSO · Authorized Managing Officer (PCAB license 43634) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for TRIPLE S BUILDERS INC — not an accusation or finding of wrongdoing.
Score: 82.20 / 100 · Projects in sample: 70 · As of Oct 28, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 66.5/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 66.5
- lateCompletedProjects
- 1
- onTimeCompletedProjects
- 52
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 66
- pastTargetOngoingProjects
- 13
- undatedCompletedProjectsExcluded
- 4
- Termination rate
Component score: 100/100 · Weight: 21%
- totalProjects
- 70
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0.1
- componentScore
- 100
- projectsWithAbcAndCost
- 70
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 99.1/100 · Weight: 11%
- projects
- 70
- componentScore
- 99.1
- flagsPerProject
- 0.03
- publishedV2Flags
- 2
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 70
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 49 of 69 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY-DAVAO-COTABATO RD (JCT DIGOS-COTABATO SECT.)-K1579+093-K1580+625, DAVAO DEL SUR25LD0202 · ₱95,531,740.90 · mapped
- PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY-MONTEVISTA-COMPOSTELA-MATI-BDRY. RD-K1480+000-K1483+905, K1484+940-K1486+01724LI0128 · ₱95,516,512.51 · mapped
- TAGUM - PANABO CIRCUM RD. - K1498+075 - K1499+61525LJ0001 · ₱86,130,963.30 · mapped
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS) REHABILITATION/IMPROVEMENT OF JAEN-STA. ROSA ROAD, JAEN, NUEVA ECIJA25CF0080 · ₱72,015,498.12 · mapped
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTION) REHABILITATION/IMPROVEMENT OF SAN LEONARDO - JAEN - SAN ISIDRO BYPASS ROAD, NUEVA ECIJA25CF0082 · ₱72,014,815.26 · mapped
- CONSTRUCTION OF ROAD, BARANGAY ELIZALDE - BARANGAY NEW BARILI - BARANGAY GOLDEN VALLEY, MABINI, DAVAO DE ORO24LA0100 · ₱66,774,875.33 · mapped
- PREVENTIVE MAINTENANCE OF ROAD:ASPHALT OVERLAY PRES DIOSDADO P. MACAPAGAL NATL HI-WAY-K1750+142-K1751+000, LUPON, DAVAO ORIENTAL24LG0025 · ₱47,767,500.00 · mapped
- PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - PRES. DIOSDADO P.MACAPAGAL NAT'L HI-WAY - K1732 + 150 - K1733 + 00024LG0117 · ₱47,735,958.38 · mapped
- PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - DAANG MAHARLIKA (MN) (S00126MN) - K1420+567-K1420+987, DAVAO DE ORO24L00036 · ₱47,726,818.71 · mapped
- PREVENTIVE MAINTENANCE - PRIMARY ROADS ALONG MAHARLIKA HIGHWAY - K1403+897 - K1405+713, DAVAO DE ORO25L00052 · ₱43,434,204.04 · mapped
- ASUNCION-SAN ISIDRO-LAAK-VERUELA RD K1515+895.000 - K1518+000.000, LAAK, DAVAO DE ORO24LA0119 · ₱39,187,086.03 · mapped
- Construction of Flood Mitigation Structure along Pampanga River, Barangay Calaba, San Isidro, Nueva Ecija25CF0004 · ₱34,128,123.18 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF BUNGO - MACABACLAY ROAD,25CF0023 · ₱33,783,688.85 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD AT BARANGAY MAKABAC25CF0022 · ₱28,958,837.84 · mapped
- CONSTRUCTION OF TWO (2) UNITS, TWO STOREY, FOUR (4) CLASSROOM BUILDING AT BONGBONG ES, PANTUKAN, COMPOSTELA VALLEY PROVINCE18LA0352 · ₱28,718,223.00 · mapped
- PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - PRES. DIOSDADO P. MACAPAGAL NATIONAL HI-WAY - K1712 + 856 - K1713 + 23823LG0083 · ₱24,230,500.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (PDEA PROVINCIAL OFFICE), EPARK, APOKON, TAGUM CITY, DAVAO DEL NORTE24LC0074 · ₱22,763,140.02 · mapped
- BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD AT CARANGLAAN, BRGY. CARLOS, PEÑARANDA, NUEVA ECIJA25CF0127 · ₱21,671,652.40 · mapped
- CONSTRUCTION OF ONE (1) UNIT, TWO (2) STOREY, FOUR (4) CLASSROOM SCHOOL BUILDING AT BON-TEMPLE ES, PANTUKAN, COMPOSTELA VALLEY20LA0352 · ₱18,001,259.43 · mapped
- CONSTRUCTION OF ONE (1) UNIT, TWO (2) STOREY, FOUR (4) CLASSROOM SCHOOL BUILDING AT NAGAS ES, PANTUKAN, COMPOSTELA VALLEY20LA0347 · ₱17,950,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION / IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - SAN ISIDRO - PULO - BULUALTO BYPASS ROAD, SAN ISIDRO AND GAPAN CITY, NUEVA ECIJA25CF0013 · ₱17,375,354.37 · mapped
- CONCRETING OF VARIOUS BRGY. ROAD, MACO COMPOSTELA VALLEY PROVINCE20LA0091 · ₱16,982,843.92 · mapped
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES STRUCTURAL AND RESILIENCE PROGRAM - CONSTRUCTION OF MULTI-PURPOSE BUILDING (SCHOOL BUILDING), IMBUNIA ELEMENTARY SCHOOL, BARANGAY IMBUNIA, JAEN, NUE25CF0101 · ₱16,567,764.35 · mapped
- BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, GAPAN CITY, NUEVA ECIJA24CF0132 · ₱15,680,614.02 · mapped
- CONCRETING OF BRGY. MAKABACLAY FMR, BRGY. MAKABACLAY, GAPAN CITY, NUEVA ECIJA24CF0064 · ₱14,700,321.08 · mapped
- CONSTRUCTION OF CONCRETING ROAD, KING-KING, PANTUKAN, DAVAO DE ORO21LA0120 · ₱14,698,155.24 · mapped
- CONCRETING OF ROAD NATIONAL HIGHWAY JUNCTION TO CAMPO 4, PINDASAN, MABINI, COMPOSTELA VALLEY PROVINCE19LA0413 · ₱14,576,283.84 · mapped
- CONCRETING OF ROAD, BRGY. CABUYUAN TO CUAMBOG, MABINI, COMPOSTELA VALLEY PROVINCE19LA0329 · ₱14,552,950.36 · mapped
- CONSTRUCTION OF ROAD, CADUNAN NATIONAL HIGHWAY - SITIO KAPOC, CADUNAN, MABINI, DAVAO DE ORO24LA0073 · ₱14,552,057.75 · mapped
- CONSTRUCTION OF ROAD, SITIO VACA, BARANGAY DEL PILAR - BARANGAY PANGIBIRAN, MABINI, DAVAO DE ORO24LA0120 · ₱14,551,758.34 · mapped
- CONCRETING OF BRGY. STO. CRISTO FMR, BRGY. STO. CRISTO, SAN ISIDRO, NUEVA ECIJA23CF0097 · ₱11,734,684.37 · mapped
- CONCRETING OF BRGY. BUNGO FMR, BRGY. BUNGO, GAPAN CITY, NUEVA ECIJA23CF0093 · ₱11,733,526.97
- CONSTRUCTION OF ONE (1) UNIT, ONE (1) STOREY, FOUR (4) CLASSROOM SCHOOL BUILDING AT DOROTEO DE CASTRO ES, PANTUKAN, COMPOSTELA VALLEY20LA0345 · ₱10,000,000.00 · mapped
- PREVENTIVE MAINTENANCE - ASPHALT OVERLAY - DAANG MAHARLIKA (MN) - K1489+ 857 - K1490 + 00023LB0084 · ₱9,800,000.00 · mapped
- CONCRETING OF ROAD SITIO MENDOZA, BRGY. KINGKING, PANTUKAN, COMPOSTELA VALLEY PROVINCE19LA0474 · ₱9,799,930.46 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING PANTUKAN NHS, PANTUKAN, COMPOSTELA VALLEY PROVINCE19LA0456 · ₱9,799,882.09 · mapped
- CONCRETING OF ROAD, BRGY. SAN ANTONIO ROAD, MABINI, COMPOSTELA VALLEY PROVINCE19LA0328 · ₱9,702,854.18 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS - WATER SUPPLY SYSTEM CONSTRUCTION OF SOLAR WATER SYSTEM, SAN ISIDRO, NUEVA ECIJA23CF0117 · ₱9,652,265.43 · mapped
- REPAIR/REHABILITATION OF CROSS DRAINAGE STRUCTURE ALONG MAHARLIKA HIGHWAY (S00126MN) STA. K1424+200, POBLACION NABUNTURAN, DAVAO DE ORO24LA0128 · ₱9,557,725.43 · mapped
- CONSTRUCTION/ REHABILITATION OF SAMPAGUITA ST., BRGY. PASONG TAMO, QUEZON CITY20OF0204 · ₱9,507,000.00 · mapped
- CONSTRUCTION / REHABILITATION OF MANILA ST., BRGY. PASONG TAMO, QUEZON CITY20OF0202 · ₱9,505,575.00 · mapped
- RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES QUEZON BR. (B03195LZ) ALONG QUEZON BLVD EXTN21O00082 · ₱8,664,722.98 · mapped
- PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - MARIA CLARA - K0006+(-174) - K0006+452, QUEZON CITY21OF0004 · ₱8,100,431.03 · mapped
- BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BARANGAY MARAWA, JAEN, NUEVA ECIJA25CF0126 · ₱7,877,152.59 · mapped
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF ROAD WITH DRAINAGE AT BARANGAY BAYANIHAN, GAPAN CITY, NUEVA ECIJ24CF0067 · ₱7,722,734.22 · mapped
- CONCRETING OF PUROK 1, BRGY. MAPAANG FMR, BRGY. MAPAANG, MACO, COMPOSTELA VALLEY PROVINCE19LA0487 · ₱6,955,837.36 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY AMPAWID, LAAK, DAVAO DE ORO22LA0025 · ₱6,929,964.87 · mapped
- BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (DAY CARE CENTER), BARANGAY KAPALANGAN, GAPAN CITY, NUEVA ECIJA25CF0114 · ₱6,402,282.62 · mapped
- PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - AGHAM ROAD, K0011+(-252) - K0011+059, QUEZON CITY21OF0010 · ₱6,063,298.21 · mapped
- BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (HEALTH CENTER), BARANGAY KAPALANGAN, GAPAN CITY, NUEVA ECIJA25CF0115 · ₱5,909,147.28 · mapped
Equipment & capacity
PCAB license
- License no.
- 43634
- Category
- A · Medium B
- Minimum net worth for this category
- ₱30,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱300M
- License valid until
- Feb 14, 2027
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 43634); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
8 evaluations listed across 3 GPPB CPES releases; average final rating 86.2% over 3 rated projects; 8 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Nov 3, 2025 | NIA | ₱11,567,102.00 | On-going | 89.5% | — | 40th, p. 308 |
| Jun 26, 2025 | DPWH | 66,774,875.330 (₱ thousands, as printed; flagged) | On-going | 96.0% | — | 40th, p. 308 |
| Jun 25, 2025 | DPWH | 22,763,140.020 (₱ thousands, as printed; flagged) | Completed | 96.0% | 89.0% | 40th, p. 308 |
| May 26, 2025 | NIA | ₱12,864,757.00 | Completed | 85.3% | 85.3% | 40th, p. 308 |
| Nov 11, 2024 | DPWH | ₱22,763,140.00 | On-going | 86.0% | — | 39th (rev), p. 214 |
| Nov 6, 2024 | DPWH | ₱66,774,875.00 | On-going | 94.5% | — | 39th (rev), p. 214 |
| Jun 23, 2024 | NIA | ₱12,864,758.00 | On-going | 82.3% | — | 38th, p. 245 |
| Jun 23, 2024 | NIA | ₱14,469,771.00 | Completed | 84.4% | 84.4% | 38th, p. 245 |
2 amounts flagged: the printed value is implausible for a ₱-thousands column or disagrees with the DPWH award, so we show it as printed instead of converting it.
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
- DPWH Infrastructure: 78 awards · ₱1,411,542,995.09
- NIA Infrastructure: 6 awards · ₱56,317,190.08
- City of Gapan Infrastructure: 6 awards · ₱22,326,309.48
- 25LD0202-NOA, NTP & CONTRACT₱95,531,740.90· 2025-08-22· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - DAVAO DEL SUR DIST
- 25L00052 ROA, NOA, Contract & Notice to Proceed
- 25CF0080₱72,015,498.12· 2025-05-15· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - NUEVA ECIJA 2ND DE
- 25CF0114₱6,402,282.62· 2025-05-15· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - NUEVA ECIJA 2ND DE
- 25CF0126₱7,877,152.59· 2025-05-15· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - NUEVA ECIJA 2ND DE
- 25CF0127₱21,671,652.40· 2025-05-15· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - NUEVA ECIJA 2ND DE
- 25CF0115₱5,909,147.28· 2025-05-15· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - NUEVA ECIJA 2ND DE
- 25CF0082₱72,014,815.26· 2025-05-15· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - NUEVA ECIJA 2ND DE
- 25CF0101₱16,567,764.35· 2025-05-15· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - NUEVA ECIJA 2ND DE
- Maintenance and Improvement
- CONSTRUCTION OF CHB LINING LATERAL C-8₱11,567,102.29· 2025-03-20· Other construction· NATIONAL IRRIGATION ADMINISTRATION - UPRIIS, DIVISION 4
- 25LJ0001 Tagum – Panabo₱86,130,963.30· 2025-03-19· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - DAVAO DEL NORTE 2N
- 25CF0013₱17,375,354.37· 2025-03-07· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - NUEVA ECIJA 2ND DE
- 25CF0023₱33,783,688.85· 2025-01-30· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - NUEVA ECIJA 2ND DE
- 25CF0022₱28,958,837.84· 2025-01-30· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - NUEVA ECIJA 2ND DE
- 25CF0035₱4,874,808.76· 2025-01-30· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - NUEVA ECIJA 2ND DE
- 25CF0004₱34,128,123.18· 2025-01-30· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - NUEVA ECIJA 2ND DE
- 24LG0117₱47,735,958.38· 2025-01-23· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - DAVAO ORIENTAL 2ND
- 24LI0128₱95,516,512.51· 2024-12-23· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - DAVAO DE ORO 2ND D
- 23CL0198 - REHABILITATION OF SCHOOL BUILDING₱13,513,844.53· 2024-09-23· Other repair· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - ZAMBALES 1ST DEO
- 23CL0197 -REHABILITATION OF SCHOOL BUILDING₱11,992,384.47· 2024-09-23· Other repair· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - ZAMBALES 1ST DEO
- 24LA0128₱9,462,620.82· 2024-09-17· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - DAVAO DE ORO 1ST D
- 24CF0132₱15,680,614.02· 2024-08-28· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - NUEVA ECIJA 2ND DE
- Construction of Multi-Purpose Gym
- 24L00036 ROA, NOA, Contract & Notice to Proceed
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →