NORTHERN COTABATO CONST is listed as a company organization in Philippine public procurement records on this site, with 25 linked DPWH project(s) totaling about ₱166,140,822.58. Recorded delivery grade B (pattern summary from public DPWH/PhilGEPS links — not a finding of wrongdoing).
NORTHERN COTABATO CONST
BRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 25
- Total value
- ₱166,140,822.58
- Published flags
- 0
- Region
- Cotabato 1st DEO · Region XII
Public Record Grade
A transparent, data-derived summary of reported public records for NORTHERN COTABATO CONST — not an accusation or finding of wrongdoing.
Score: 88.40 / 100 · Projects in sample: 25 · As of Oct 22, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 92/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 92
- lateCompletedProjects
- 4
- onTimeCompletedProjects
- 21
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 25
- pastTargetOngoingProjects
- 0
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 25
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0.1
- componentScore
- 100
- projectsWithAbcAndCost
- 25
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 25
- componentScore
- —
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 25
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH, PhilGEPS and COA records, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
24 geotagged projects — Open full map
- CONSTRUCTION/IMPROVEMENT OF RANZO - TACUPAN ROAD IN SUPPORT TO PALM OIL MILL PROJECT (BOI REGISTERED), CARMEN, COTABATO22MI0011 · ₱29,399,968.70 · mapped
- CONSTRUCTION OF CONCRETE ROAD-RANZO-TACUPAN- ROAD IN SUPPORT TO PALM OIL MILL PROJECT (BOI REGISTERED), CARMEN, COTABATO21MI0053 · ₱19,299,985.69 · mapped
- CONCRETING OF ROAD IN BARANGAY TACUPAN TO BARANGAY RANZO, CARMEN, NORTH COTABATO20M00114 · ₱15,978,709.46 · mapped
- CONSTRUCTION OF CONCRETE ROAD ALONG RANZO-TACUPAN ROAD IN SUPPORT TO PALM OIL MILL PROJECT (BOI REGISTERED), CARMEN, COTABATO20M00128 · ₱13,961,381.45 · mapped
- CONCRETING OF ROAD IN BARANGAY TACUPAN (GOING NEW BARANGAY HALL SITE), CARMEN, COTABATO22MI0057 · ₱9,773,176.70 · mapped
- CONCRETING OF ROAD, BARANGAY POBLACION (BOUGAINVILLEA STREET), CARMEN, COTABATO21MI0075 · ₱9,401,911.12 · mapped
- CONCRETING OF ROAD IN BARANGAY KIMADZIL TO BARANGAY KILABAO, CARMEN, NORTH COTABATO20M00112 · ₱9,401,489.51 · mapped
- CONCRETING OF CROSSING GALAY TO SITIO PEGA FMR, BRGY. NASAPIAN, COTABATO17MD0094 · ₱7,719,856.90 · mapped
- CONCRETING OF ROAD, BRGY. LILIONGAN (ROAD NETWORK), CARMEN, COTABATO17MD0069 · ₱5,653,631.90 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING COVERED COURT IN BARANGAY KIBENES, (ELEMENTARY SCHOOL), CARMEN, COTABATO22MI0062 · ₱4,900,776.90 · mapped
- SAYRE ROAD-SITIO TAWAGON-KILAMBAY, BRGY. KIBUDTUNGAN CONNECTING TO SALAMA, BANISILAN ROAD IN SUPPORT OF COCONUT PROCESSING INDUSTRY (TREE LIFE ORGANIC COCO SUGAR), CARMEN, COTABATO22MI0059 · ₱4,717,541.11 · mapped
- REHAB/RECONST OF NATIONAL RDS W/SLIPS, SLOPE COLLAPSE, & LANDSLIDE ALONG BUK-COT RD, CARMEN,17MD0074 · ₱4,566,394.60 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (OFFICE BUILDING) IN CAMP ROBERT EDWARD M. LUCERO, HEADQUARTERS 602ND BRIGADE BRGY. NASAPIAN, CARMEN, COTABATO20M00177 · ₱3,783,707.33 · mapped
- CONST. OF 1UNIT UNIQUE WORKSHOP BUILDING, CARMEN NHS, CARMEN, COTABATO17MD0244 · ₱3,174,599.81 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING IN BARANGAY KIBUDTUNGAN, CARMEN, NORTH COTABATO20M00134 · ₱2,865,936.26 · mapped
- CONST. OF 1STY 2CL SB (TOILET ATTACHED) MALUGASA ES, CARMEN, COTABATO17MD0103 · ₱2,582,529.42 · mapped
- CONST. OF 1STY 2CL SB (TOILET ATTACHED), KILABAO ES, CARMEN, COTABATO17MD0106 · ₱2,577,710.67 · mapped
- CONST. OF 1STY 2CL SB (TOILET ATTACHED), C. NORTHWEST ES, CARMEN, COTABATO17MD0102 · ₱2,494,776.63 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING 602ND BRIGADE, CAMP LUCERO (RESERVIST), BARANGAY NASAPIAN, CARMEN, NORTH COTABATO19MD0030 · ₱2,350,573.65 · mapped
- CONSTRUCTION OF WATER SUPPLY LEVEL II IN KIBENES ELEMENTARY SCHOOL, BARANGAY KIBENES, CARMEN, NORTH COTABATO20M00132 · ₱1,953,912.02 · mapped
- CONSTRUCTION OF WATER SUPPLY LEVEL II, MALAPAG CENTRAL ELEMENTARY SCHOOL, BRGY. MALAPAG, CARMEN, NORTH COTABATO20M00119 · ₱1,953,159.01 · mapped
- CONSTRUCTION OF WATER SUPPLY LEVEL II, BARANGAY TACUPAN, CARMEN, NORTH COTABATO20M00118 · ₱1,945,941.72 · mapped
- CONSTRUCTION OF WATER SUPPLY-LEVEL II, PUROK 6, BARANGAY POBLACION, CARMEN, NORTH COTABATO21MI0043 · ₱1,931,082.24 · mapped
- CONST. OF MULTI-PURPOSE BUILDING, KITULAAN, CARMEN, COTABATO18MD0066 · ₱1,880,870.13 · mapped
- CONST. OF MP BLDG (COVERED COURT), MANILI ES, CARMEN, COTABATO17MD0002 · ₱1,871,199.65
Across government
No DepEd or DOH contract awards matched to this name in PhilGEPS records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
