E K C CONST AND AGGREGATES is listed as a company organization in Philippine public procurement records on this site, with 15 linked DPWH project(s) totaling about ₱592,033,844.58. Recorded delivery grade C (from public DPWH project records — not a finding of wrongdoing).
E K C CONST AND AGGREGATES
CGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 15
- Total value
- ₱592,033,844.58
- Published flags
- 0
- Region
- Benguet 1st DEO · Cordillera Administrative Region
Online presence
Google Maps: E.K.C. Construction and Agreggates★ 3 (3 reviews)Google Maps, 2026-10-22
OB-170 Boted,Tawang, La Trinidad, Benguet, La Trinidad, Benguet
Public Record Grade
A transparent, data-derived summary of reported public records for E K C CONST AND AGGREGATES — not an accusation or finding of wrongdoing.
Score: 78.10 / 100 · Projects in sample: 15 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 78.6/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 78.6
- lateCompletedProjects
- 6
- onTimeCompletedProjects
- 8
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 14
- pastTargetOngoingProjects
- 0
- undatedCompletedProjectsExcluded
- 1
- Termination rate
Component score: 80/100 · Weight: 24%
- totalProjects
- 15
- componentScore
- 80
- terminatedProjects
- 1
- terminationRatePct
- 6.7
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0.2
- componentScore
- 100
- projectsWithAbcAndCost
- 15
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 15
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 15
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
15 geotagged projects — Open full map · Download projects (CSV)
- ROAD UPGRADING (UNPAVED TO PAVED) ACOP - KAPANGAN - KIBUNGAN - BAKUN ROAD, K0330+238 - K0333+97915P00057 · ₱146,248,930.72 · mapped
- ROAD UPGRADING (UNPAVED TO PAVED) APAYAO - ILOCOS NORTE ROAD K0619+01216PC0008 · ₱80,622,555.18 · mapped
- ASSET PRESERVATION OF NATIONAL ROAD, REHAB/RECONST OF NATL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDES, BENGUET-NUEVA VIZCAYA ROAD, K0254+236-K0254+338, K0257+810 -K0257+825, K0271+650 - K0271+990, K0290+948-K0290+979,K0291+515 - K0291+551, K0293+312-16P00042 · ₱70,960,037.88 · mapped
- AP REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SOIL COLLAPSE, AND LANDSLIDE TERTIARY ROADS, CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURES GOV. BADO DANGWA NATIONAL ROAD, K0320+442-K0320+482,K0329+100-K0329+153, K0329+627-K0329+64421PF0037 · ₱52,598,061.62 · mapped
- REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGED BASED ON PAVEMENT MANAGEMENT SYSTEM HIGHWAY - 4, BAGUIO - BONTOC ROAD, K0258+178-K0259+000, K0259+380-K0259+531,K0259+832-K0260+015, K0260+500-K0261+982, BENGUET15P00072 · ₱47,862,061.19 · mapped
- NETWORK DEV'T: OFF-CARRIAGEWAY IMPVT INC. DRAINAGE ALONG B-B ROAD K0266+000 - K0270+541 & K0319+00016PF0002 · ₱47,705,032.10 · mapped
- CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS - REPLACEMENT OF PERMANENT WEAK BRIDGES-MONGGAYANG BRIDGE (B03435LZ) ALONG UBAO-TAANG ROAD, AGUINALDO, IFUGAO16PJ0024 · ₱38,284,165.65 · mapped
- REPLACEMENT OF BRIDGES FROM TEMPORARY TO PERMANENT, ANAPOL BRIDGE (B04278LZ) ALONG ASIN (KM.8)-NANGALISAN-SAN PASCUAL, K0275+2029, TUBA, BENGUET15PE0032 · ₱24,038,963.53 · mapped
- CONSTRUCTION OF LOO FLOOD CONTROL ALONG AGNO RIVER,STA.0+000-STA2+565(I.S.),LOO,BUGUIAS,BENGUET16PF0011 · ₱23,348,830.29 · mapped
- ROAD UPGRADING BASED ON HDM-4 PROJECT ANALYSIS FOR G-B-K-B-A ROAD, K0352+880 - K0353+26316PF0004 · ₱19,027,878.33 · mapped
- CLUSTERED REHAB./RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND SLIDE ALONG VARIOUS NATIONAL ROADS WITHIN BENGUET FIRST DISTRICT15PE0025 · ₱16,522,094.94 · mapped
- CONSTRUCTION OF CONCRETE PAVEMENT - ALONG POBLACION-KARAO-EKIP ACCESS ROAD LEADING TO MOUNT PURGATORY, BOKOD, BENGUET20PE0037 · ₱9,673,255.53 · mapped
- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF DEKKAN PAYKEK FLOOD CONTROL20PF0021 · ₱7,532,458.75 · mapped
- CLUSTERED IMPROVEMENT & REHABILITATION PROJECT (LIP) ALONG VARIOUS ROADS WITHIN BENGUET FIRST DISTRICT15PE0028 · ₱4,677,004.99 · mapped
- CLUSTERED FLOOD CONTROL PROJECT (LIP) ALONG GUMATDANG, ITOGON AND AMBUCLAO, BOKOD, BENGUET16PE0002 · ₱2,932,513.88 · mapped
Equipment & capacity
PCAB license
- License no.
- 14833
- Category
- B · Medium A
- Minimum net worth for this category
- ₱10,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱150M
- License valid until
- Feb 26, 2027
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 14833); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
No CPES evaluation lists this contractor's PCAB license in the GPPB releases we loaded (34th–41st).
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →