GMO CONST is listed as a company organization in Philippine public procurement records on this site, with 46 linked DPWH project(s) totaling about ₱857,174,907.68. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
GMO CONST
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 46
- Total value
- ₱857,174,907.68
- Published flags
- 0
- Region
- Pampanga 3rd DEO · Region III
Licensed officers (PCAB)
- Glenn Faustino Orteza · Authorized Managing Officer (PCAB license 43912) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for GMO CONST — not an accusation or finding of wrongdoing.
Score: 88.00 / 100 · Projects in sample: 46 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 84.7/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 84.7
- lateCompletedProjects
- 3
- onTimeCompletedProjects
- 40
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 46
- pastTargetOngoingProjects
- 3
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 46
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 46
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 46
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 46
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
46 geotagged projects — Open full map · Download projects (CSV)
- CONSTRUCTION OF 4 (FOUR) STOREY, 16 (SIXTEEN) CLASSROOM SCHOOL BUILDING UMINGAN CENTRAL NATIONAL HIGH SCHOOL, UMINGAN, PANGASINAN24AI0243 · ₱54,654,857.33 · mapped
- CONSTRUCTION OF 4STY12CL STO. CRISTO IS, CITY OF TARLAC, TARLAC24CJ0324 · ₱51,342,000.00 · mapped
- CONSTRUCTION OF FOUR (4) STOREY, SIXTEEN (16) CLASSROOMS SCHOOL BUILDING TAYUG NATIONAL HIGH SCHOOL, TAYUG, PANGASINAN23AI0193 · ₱50,218,553.84 · mapped
- CONSTRUCTION OF 3STY12CL, RAMOS23CJ0298 · ₱44,774,028.00 · mapped
- CONSTRUCTION OF 4STY 12CL, AMSIC INTEGRATED SCHOOL, ANGELES CITY24CI0003 · ₱42,783,192.39 · mapped
- CONSTRUCTION OF 4STY 12CL, M. NEPOMOCENO ELEMENTARY SCHOOL, ANGELES CITY24CI0098 · ₱41,509,302.26 · mapped
- CONSTRUCTION OF 4STY8CL, BALAGTAS HEIGHTS ELEMENTARY SCHOOL, BALAGTAS (BIGAA), BULACAN24CC0566 · ₱35,819,057.64 · mapped
- CONSTRUCTION OF TWO (2) STOREY EIGHT (8) CLASSROOM SCHOOL BUILDING AT PINTUNG BUKAWE ES, SAN MATEO, RIZAL18DO0156 · ₱28,882,982.73 · mapped
- DPWH STANDARD 2-STOREY 8 CLASSROOM SCHOOL BUILDING, ANDRES M. LUCIANO HIGH SCHOOL, MAGALANG, PAMPANGA22CI0133 · ₱25,090,868.84 · mapped
- Construction of Flood Mitigation Structures and Groundsill at Moonwalk Creek - Merville Creek Junction, District 2, Parañaque City22OC0148 · ₱24,499,855.40 · mapped
- CONSTRUCTION OF 2 STOREY 6 CLASSROOM PACO ELEMENTARY SCHOOL, SAN RAFAEL, BULACAN20CD0176 · ₱24,383,839.28 · mapped
- CONSTRUCTION OF 2 STOREY 8 CLASSROOM A.S. DE GUZMAN ES (TABOC ES), ANGAT, BULACAN20CD0170 · ₱22,109,256.48 · mapped
- CONSTRUCTION OF 2STY6CL, DALDALAYAP ES23CJ0300 · ₱21,712,874.94 · mapped
- CONSTRUCTION OF 2-STOREY, 6-CLASSROOM SCHOOL BUILDING SIBUL ELEMENTARY SCHOOL, SAN MIGUEL, BULACAN19CD0328 · ₱18,892,458.53 · mapped
- CONSTRUCTION OF 2-STOREY, 6-CLASSROOM, BULIRAN ELEMENTARY SCHOOL, SAN MIGUEL, BULACAN22CD0224 · ₱18,000,000.00 · mapped
- CONSTRUCTION OF TWO (2) STOREY, SIX (6) CLASSROOM SCHOOL BUILDING, ALCALA CENTRAL SCHOOL AT ALCALA, PANGASINAN20AI0180 · ₱16,204,711.80 · mapped
- CONSTRUCTION OF TWO (2) STOREY SIX (6) CLASSROOM SCHOOL BUILDING PINDANGAN WEST ELEMENTARY SCHOOL AT ALCALA, PANGASINAN20AI0181 · ₱16,204,711.80 · mapped
- CONSTRUCTION OF 2STY4CL, DOCLONG 2ND23CJ0291 · ₱16,132,110.00 · mapped
- CONSTRUCTION OF 2STY4CL, DOCLONG 1ST23CJ0290 · ₱15,864,891.00 · mapped
- COMPLETE CONSTRUCTION OF DPWH STANDARD 2-STOREY, 4 CLASSROOM SCHOOL BUILDING AT BALITUCAN ELEMENTARY SCHOOL, MAGALANG, PAMPANGA21CI0085 · ₱15,247,221.08 · mapped
- CONCRETING OF CADANGLAAN PRK. 7 FMR, BRGY. CADANGLAAN, PURA, TARLAC23CJ0264 · ₱14,925,000.00 · mapped
- CONCRETING OF MAPANDAN FMR, BRGY. MAPANDAN, MAYANTOC, TARLAC23CJ0266 · ₱14,925,000.00 · mapped
- CONSTRUCTION OF 2 STOREY 4 CLASSROOM, MAPINA ELEMENTARY SCHOOL, MAGALANG, PAMPANGA24CI0099 · ₱14,920,736.36 · mapped
- DPWH STANDARD TWO-STOREY (4-CLASSROOM) SCHOOL BUILDING, MINING ELEMENTARY SCHOOL, ANGELES CITY23CI0164 · ₱14,869,431.15 · mapped
- DPWH STANDARD TWO-STOREY (4-CLASSROOM) SCHOOL BUILDING, EPZA RESETTLEMENT ELEMENTARY SCHOOL, ANGELES CITY23CI0165 · ₱14,696,936.80 · mapped
- CONSTRUCTION OF TWO (2) STOREY FOUR (4) CLASSROOM SCHOOL BUILDING AT PINTUNG BUKAWE NATIONAL HIGH SCHOOL, SAN MATEO, RIZAL18DO0119 · ₱14,056,309.47 · mapped
- CONSTRUCTION/COMPLETION OF 2-STOREY 4-CLASSROOM CALAWITAN ELEMENTARY SCHOOL, SAN ILDEFONSO, BULACAN21CD0200 · ₱13,708,724.66 · mapped
- CONSTN OF TWO STOREY FOUR CLASSROOM SCHOOL BUILDING CABOLUAN E/S, STA. MARIA, PANGASINAN18AI0344 · ₱13,007,522.49 · mapped
- COMPLETE CONSTRUCTION OF DPWH STANDARD TWO-STOREY FOUR CLASSROOM SCHOOL BUILDING AT BALITUKAN NATIONAL HIGH SCHOOL, MAGALANG,PAMPANGA20CI0098 · ₱12,667,145.96 · mapped
- COMPLETE CONSTRUCTION OF DPWH STANDARD TWO-STOREY FOUR CLASSROOM SCHOOL BUILDING AT MAGALANG CENTRAL SCHOOL, MAGALANG, PAMPANGA20CI0097 · ₱12,611,354.51 · mapped
- CONCRETING OF DAGUILISEN ROAD, BRGY. SAN JOSE SOUTH FMR, BRGY. SAN JOSE SOUTH, ANAO, TARLAC23CJ0265 · ₱11,940,000.00 · mapped
- CONSTRUCTION OF (2) STOREY, FOUR (4) CLASSROOM SCHOOL BUILDING, CAL-LITANG ELEMENTARY SCHOOL, STA. MARIA, PANGASINAN20AI0176 · ₱11,620,337.67 · mapped
- COMPLETE CONSTRUCTION OF 2-STOREY 4-CLASSROOM SCHOOL BUILDING AT ESCALER ELEM SCHOOL, MAGALANG,PAMPANGA19CI0150 · ₱11,341,599.21 · mapped
- COMPLETE CONSTRUCTION OF 2-STOREY 4-CLASSROOM SCHOOL BUILDING AT SAN VICENTE ELEMENTARY SCHOOL, MAGALANG,PAMPANGA19CI0148 · ₱11,198,128.89 · mapped
- CONSTRUCTION OF TWO (2) STOREY FOUR (4) CLASSROOMS SCHOOL BUILDING DALAYAP ELEMENTARY SCHOOL, STA. MARIA, PANGASINAN19AI0329 · ₱11,048,387.54 · mapped
- COMPLETE CONSTRUCTION OF 2-STOREY 4-CLASSROOM BUILDING AT AYALA ELEMENTARY SCHOOL,MAGALANG,PAMPANGA19CI0149 · ₱10,850,342.24 · mapped
- CONSTRUCTION OF TWO UNITS UNIQUE WORKSHOP EASTERN PANGASINAN AGRICULTURAL COLLEGE, STA. MARIA, PANGA18AI0345 · ₱10,247,678.11 · mapped
- CONSTRUCTION OF ROAD INCLDING DRAINAGE SYSTEM, BARANGAY 38, 41 AND 42, CALOOCAN CITY24OD0069 · ₱9,696,745.00 · mapped
- CONSTRUCTION OF REINFORCED CONCRETE BOX CULVERT ALONG BARANGAY 86, 87, AND 94, (PHASE 3), CALOOCAN CITY25OD0049 · ₱9,620,764.00 · mapped
- CONSTRUCTION/COMPLETION OF 4STY8CL, F. SERRANO SR. ES, PARAÑAQUE CITY, METRO MANILA21OC0179 · ₱8,000,000.00 · mapped
- CONSTRUCTION/COMPLETION OF 3STY3CL, SUN VALLEY ES, PARAÑAQUE CITY, METRO MANILA21OC0180 · ₱7,500,000.00 · mapped
- CONSTRUCTION/COMPLETION OF 4STY8CL, DR. ARCADIO SANTOS NHS-MAIN,PARAÑAQUE CITY, METRO MANILA21OC0181 · ₱6,000,000.00 · mapped
- REHABILITATION OF MULTI-PURPOSE BUILDING, ANNEX 17-27-36 BETTER LIVING, BRGY. DON BOSCO,PARAÑAQUE CITY, METRO MANILA22OC0151 · ₱4,950,000.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDINGS, STA. MARIA, PANGASINAN22AI0130 · ₱4,900,238.22 · mapped
- CONSTRUCTION/COMPLETION(UPGRADING OF ELECTRICAL FACILITIES), STA MARIA EAST INTEGRATED SCHOOL, STA. MARIA, PANGASINAN21AI0174 · ₱1,773,412.52 · mapped
- CONSTRUCTION/COMPLETION (UPGRADING OF ELECTRICAL FACILITIES), EASTERN PANGASINAN AGRICULTURAL COLLEGE AT STA. MARIA, PANGASINAN21AI0175 · ₱1,772,339.54 · mapped
Equipment & capacity
PCAB license
- License no.
- 43912
- Category
- A · Medium B
- Minimum net worth for this category
- ₱30,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱300M
- License valid until
- Apr 19, 2027
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 43912); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
5 evaluations listed across 3 GPPB CPES releases; average final rating 92.4% over 3 rated projects; 5 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Jul 7, 2025 | NIA | ₱43,912,000.00 | Completed | 87.5% | 87.5% | 40th, p. 125 |
| Jun 29, 2025 | DPWH | ₱42,783,192.00 | Completed | 93.3% | 94.7% | 40th, p. 125 |
| Oct 15, 2024 | DPWH | ₱42,531,389.00 | On-going | 95.3% | — | 39th (rev), p. 80 |
| Mar 16, 2024 | DPWH | ₱14,608,848.00 | Completed | 99.8% | 94.9% | 37th, p. 43 |
| Mar 8, 2024 | DPWH | ₱49,743,554.00 | On-going | 91.9% | — | 37th, p. 43 |
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →