LOC CONST AND SUPPLY is listed as a company organization in Philippine public procurement records on this site, with 16 linked DPWH project(s) totaling about ₱64,744,255.71. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
LOC CONST AND SUPPLY
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 16
- Total value
- ₱64,744,255.71
- Published flags
- 0
- Region
- Benguet 1st DEO · Cordillera Administrative Region
Licensed officers (PCAB)
- Leonarda Olat Capegsan · Authorized Managing Officer (PCAB license 34764) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for LOC CONST AND SUPPLY — not an accusation or finding of wrongdoing.
Score: 88.50 / 100 · Projects in sample: 16 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 100/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 100
- lateCompletedProjects
- 0
- onTimeCompletedProjects
- 16
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 16
- pastTargetOngoingProjects
- 0
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 16
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0.1
- componentScore
- 100
- projectsWithAbcAndCost
- 16
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 16
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 16
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
14 geotagged projects — Open full map · Download projects (CSV)
- RESTORATION OF ROAD CUT ALONG KENNON ROAD, K0 239+276.20 - K0 239+349.00, CAMP 6, TUBA, BENGUET18PE0109 · ₱11,056,803.00 · mapped
- RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, CAMP 6 BRIDGE (B02183LZ) ALONG KENNON ROAD, K0237+011, TUBA, BENGUET17PE0019 · ₱10,310,833.60 · mapped
- RESTORATION OF ROAD CUT ALONG KENNON ROAD, K0 239+276.20 - K0 239+349.00, CAMP 6, TUBA, BENGUET19PE0106 · ₱7,313,735.00 · mapped
- RESTORATION OF ROAD CUT ALONG KENNON ROAD, K0 216+090 - K0 216+137, CAMP 1, TUBA, BENGUET19PE0107 · ₱5,925,100.00 · mapped
- REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - QUIRINO HIGHWAY (BAGUIO - BAUANG), K0301+690 - K0301+705 (RIGHT SIDE). K0302+285 - K0302+350 (RIGHT SIDE), BAGUIO CITY15P00081 · ₱4,798,241.67 · mapped
- IMPROVEMENT OF TWIN PEAKS BARANGAY ROAD, STA.0 + 000 - STA.0 + 800 (VARIOUS SECTIONS), TUBA, BENGUET18PE0056 · ₱4,626,404.19 · mapped
- REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - BAGUIO-BAUANG ROAD, K0288+710-K0288+730, SABLAN, BENGUET15P00080 · ₱3,860,122.22 · mapped
- LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF ROAD AT LOWER PUROK 6 IN BETWEEN THE CLOA AWARDED AREA AND THE BALILI RIVER, ST. JOSEPH VILLAGE, NAVY BASE, BAGUIO CITY21PD0062 · ₱2,970,000.00 · mapped
- CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS - RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES: LOO BRIDGE (B02677LZ) ALONG GUREL-BOKOD-KABAYAN-BUGUIAS-ABATAN ROAD.17PF0007 · ₱2,802,940.30 · mapped
- LOCAL INFRASTRUCTURE PROGRAM - IMPROVEMENT OF STO. NINO ROAD, AMBASSADOR, TUBLAY, BENGUET17PF0030 · ₱1,938,847.88 · mapped
- LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF FLOOD CONTROL ALONG SAGUDIN RIVER, BROOKSIDE, BAGUIO CITY, BENGUET17PD0002 · ₱1,898,727.26
- CONSTRUCTION OF FOOTBRIDGE SITIO COLORADO TO TWIN PEAKS NORTE, TUBA, BENGUET18PE0054 · ₱1,873,797.70 · mapped
- LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF INCOME GENERATING PARKING SPACE AT PUROK 7, PINSAO PILO PROJECT, BAGUIO CITY LONE DISTRICT15PD0065 · ₱1,867,862.21
- CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS - RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES: TUBO BRIDGE (B02160LZ) ALONG ABATAN-MANKAYAN-CERVANTES ROAD.17PF0008 · ₱1,407,811.92 · mapped
- REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - CAMP 6 BRIDGE (B02183LZ) ALONG KENNON ROAD, CAMP 6, TUBA, BENGUET15P00079 · ₱1,123,481.60 · mapped
- REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - COLORADO BRIDGE (B02170LZ) ALONG KENNON ROAD15P00062 · ₱969,547.16 · mapped
Equipment & capacity
PCAB license
- License no.
- 34764
- Category
- D · Small B
- Minimum net worth for this category
- ₱2,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱30M
- License valid until
- Jan 10, 2028
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 34764); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
1 evaluation listed across 1 GPPB CPES release; average final rating 91.4% over 1 rated project; 1 site-visit rating. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Jun 5, 2019 | DPWH | ₱11,056,803.00 | Completed | 91.4% | 91.4% | 40th, p. 188 |
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →