PISTOL CONST AND SUPPLY is listed as a company organization in Philippine public procurement records on this site, with 15 linked DPWH project(s) totaling about ₱172,561,947.48. Recorded delivery grade C (from public DPWH project records — not a finding of wrongdoing).
PISTOL CONST AND SUPPLY
CGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 15
- Total value
- ₱172,561,947.48
- Published flags
- 0
- Region
- Las Piñas-Muntinlupa DEO · National Capital Region
Licensed officers (PCAB)
- Jenila Carlos Roque · Authorized Managing Officer (PCAB license 43485) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for PISTOL CONST AND SUPPLY — not an accusation or finding of wrongdoing.
Score: 76.50 / 100 · Projects in sample: 15 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 63.9/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 63.9
- lateCompletedProjects
- 1
- onTimeCompletedProjects
- 11
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 15
- pastTargetOngoingProjects
- 3
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 15
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 15
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 15
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 15
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
15 geotagged projects — Open full map · Download projects (CSV)
- REHABILITATION OF ROAD DRAINAGE SYSTEM AT EL PUENTEBELLO, BARANGAY SAN ANTONIO,PARAÑAQUE CITY, METRO MANILA25OC0071 · ₱24,009,949.02 · mapped
- REHABILITATION OF DRAINAGE SYSTEM WITHIN HAWAII CIRCLE, BARANGAY DON BOSCO,PARAÑAQUE CITY, METRO MANILA25OC0142 · ₱24,009,174.69 · mapped
- CONSTRUCTION OF BOX CULVERT AT ELIZALDE AVE., BARANGAY B.F. HOMES,PARAÑAQUE CITY, METRO MANILA25OC0141 · ₱19,208,307.09 · mapped
- CONCRETING OF RARES, BRGY. CUYAMBAY FMR, BRGY. CUYAMBAY, TANAY, RIZAL22DO0065 · ₱16,417,500.00 · mapped
- CONSTRUCTION OFN ROAD INCLUDING DRAINAGE SYSTEM OF SAN JOSE ROAD, NBP ROAD, BRGY. POBLACION, MUNTINL18OI0069 · ₱14,699,926.84 · mapped
- LOCAL PROGRAM-CONSTRUCTION/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - LOCAL ROADS AND BRIDGES - LOCAL ROADS - CONCRETING OF ROAD BRGY. CUYAMBAY TANAY RIZAL20DO0070 · ₱14,575,156.10 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE IN SUPPORT OF NATIONAL SECURITY - CONSTRUCTION OF CENTRAL BARRACKS, CAMP CAPINPIN, TANAY, RIZAL20DO0054 · ₱14,063,106.33 · mapped
- CONSTRUCTION OF ROAD, BARANGAY POBLACION, MUNTINLUPA CITY18OI0082 · ₱9,751,401.58 · mapped
- CONSTRUCTION OF DRAINAGE SYSTEM PAMANTASAN NG LUNGSOD NG MUNTINLUPA CITY18OI0083 · ₱9,702,146.76 · mapped
- UPGRADING OF ROAD/DRAINAGE SYSTEM ALONG SCOTLAND ST., NAYONG MAHARLIKA 2, BRGY. DON BOSCO, PARAÑAQUE CITY, METRO MANILA18OC0079 · ₱9,310,178.93 · mapped
- Construction of Drainage System, Barangay Dulongbayan - I, San Mateo, Rizal23DO0049 · ₱4,950,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY DULONGBAYAN I, SAN MATEO, RIZAL23DO0040 · ₱4,950,000.00 · mapped
- CONCRETING OF CUPANG SENIOR HIGH SCHOOL, MUNTINLUPA CITY19OI0102 · ₱2,956,796.90 · mapped
- COMPLETION OF MUNTINLUPA NATIONAL HIGH SCHOOL, TUNASAN ANNEX, TUNASAN, MUNTINLUPA CITY19OI0078 · ₱1,979,996.11 · mapped
- REHABILITATION OF BAYANAN ELEM. MAIN, BRGY. BAYANAN, MUNTINLUPA CITY19OI0093 · ₱1,978,307.13 · mapped
Equipment & capacity
PCAB license
- License no.
- 43485
- Category
- C · Small B
- Minimum net worth for this category
- ₱6,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱30M
- License valid until
- Jan 22, 2027
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 43485); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
2 evaluations listed across 2 GPPB CPES releases; average final rating 87.5% over 1 rated project; 2 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Aug 19, 2019 | DPWH | ₱9,751,402.00 | Completed | 92.2% | 87.5% | 37th, p. 82 |
| May 28, 2019 | DPWH | ₱9,779,514.00 | On-going | 84.3% | — | 40th, p. 237 |
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →