LIMAR CONST is listed as a company organization in Philippine public procurement records on this site, with 27 linked DPWH project(s) totaling about ₱86,295,785.37. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
LIMAR CONST
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 27
- Total value
- ₱86,295,785.37
- Published flags
- 0
- Region
- Tacloban City DEO · Region VIII
Online presence
Google Maps: Limar ConstructionGoogle Maps, 2026-10-22
Tacloban City, Leyte, Philippines
Licensed officers (PCAB)
- Angelito C. Canete · Authorized Managing Officer (PCAB license 10203) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for LIMAR CONST — not an accusation or finding of wrongdoing.
Score: 86.60 / 100 · Projects in sample: 27 · As of Oct 22, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 86.2/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 86.2
- lateCompletedProjects
- 0
- onTimeCompletedProjects
- 25
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 27
- pastTargetOngoingProjects
- 2
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 27
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 27
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 27
- componentScore
- —
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 27
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
20 geotagged projects — Open full map
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY BELEN, PALOMPON, LEYTE24IF0144 · ₱6,910,987.15 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY BALUGO, ALBUERA, LEYTE23IF0064 · ₱6,860,662.49 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. SAN ISIDRO, TANAUAN, LEYTE22IC0041 · ₱5,929,164.32 · mapped
- Construction of Spillway, Barangay Tambis, Palompon, Leyte24IF0029 · ₱5,821,084.15 · mapped
- REHABILITATION OF ROAD, BRGY. 103, PHASE 2, PALANOG, TACLOBAN CITY22IM0026 · ₱4,899,911.00 · mapped
- CONSTRUCTION OF CONCRETE ROAD,BARANGAY CANCARAJA-BARANGAY ARABUNOG,PASTRANA,LEYTE25ID0055 · ₱4,888,400.31 · mapped
- REPLACEMENT OF 1-STOREY 3-CLASSROOM ACABAN ELEMENTARY SCHOOL (BATCH 10), CULABA, PROVINCE OF BILIRAN17IA0102 · ₱4,474,884.11
- CONST. OF RAIN WATER COLLECTION SYSTEM (RWCS) IN: 1. PEÑALOSA ELEM. SCHOOL, BRGY. PEÑALOSA, ALANGALANG, LEYTE, 2. CANVERTUDES PRIMARY SCHOOL, BRGY. CANVERTUDES, ALANGALANG, LEYTE, 3. P. BARRANTES COMMUNITY SCHOOL, BRGY. P. BARRANTES, ALANGALANG, LEYTE21IC0061 · ₱4,398,866.15 · mapped
- CONSTRUCTION OF RAINWATER COLLECTION SYSTEM-CITY CENTRAL ELEMENTARY SCHOOL, CAIBAAN ELEMENTARY SCHOOL, MARASBARAS NATIONAL HIGH SCHOOL, DR. A.P. BAÑEZ MEMORIAL ELEMENTARY SCHOOL, UTAP ELEMENTARY SCHOOL, BASPER ELEMENTARY SCHOOL, PALANOG RESETTLEMENT......19IM0058 · ₱3,823,464.06 · mapped
- CONCRETING OF ROAD, BRGY. SAN AGUSTIN, PALO, LEYTE17IC0048 · ₱3,606,219.36
- CONSTRUCTION OF RAINWATER COLLECTION SYSTEM - 1. MERCY VILLE ELEMENTARY SCHOOL 2. BAGACAY ELEMENTARY SCHOOL 3. CAMANSIHAY ELEMENTARY SCHOOL 4. SAN ROQUE ELEMENTARY SCHOOL 5. SCANDINAVIAN ELEMENTARY SCHOOL 6. TACLOBAN CITY DISTRICT ENGINEERING OFFICE......18IM0023 · ₱3,149,111.05 · mapped
- CONST. OF RAIN WATER COLLECTION SYSTEM (RWCS) IN: 1. BAHAY ELEM. SCHOOL, BRGY. BAHAY, SAN MIGUEL, LEYTE, 2. SAN ANDRES ELEM. SCHOOL, BRGY. SAN ANDRES, SAN MIGUEL, LEYTE, 3. SAN JUAN ELEM. SCHOOL BRGY. SAN JUAN, STA. FE, LEYTE, 4. KATIPUNAN ELEM. SCHOOL22IC0096 · ₱3,119,630.70 · mapped
- REPLACEMENT OF 1-STOREY 2-CLASSROOM ACABAN ELEMENTARY SCHOOL (TOILET ATTACHED) CULABA, BILIRAN LONE DISTRICT17IA0124 · ₱3,072,622.94
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. 94 TIGBAO, TACLOBAN CITY18IM0040 · ₱2,821,245.65 · mapped
- CONSTRUCTION OF ROAD, BRGY. 87, TACLOBAN CITY19IM0023 · ₱2,818,819.64 · mapped
- CONSTRUCTION OF UNIQUE WORKSHOP (7.00M X 22.5M) LEYTE NATIONAL HIGH SCHOOL, TACLOBAN CITY17IM0085 · ₱2,779,193.35
- CONST. OF SINGLE STY. COMP. (ICT) LAB. BLDG. (7MX18M), MALIBAGO NATIONAL HIGH SCHOOL, MALIBAGO, BABATNGON, LEYTE17IC0118 · ₱2,575,069.25
- CONSTRUCTION OF SCHOOL BUILDING TECH VOC LABORATORIES, V & G NATIONAL HIGH SCHOOL, TACLOBAN CITY17IM0040 · ₱2,273,178.29
- REHABILITATION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY 86 SAN JOSE, TACLOBAN CITY21IM0043 · ₱1,886,366.04 · mapped
- REHABILITATION OF MULTI-PURPOSE BUILDING, BARANGAY 23-A, TACLOBAN CITY20IM0012 · ₱1,884,578.05 · mapped
- REHABILITATION OF MULTI-PURPOSE BUILDING (LIGA NG MGA BARANGAY BLDG.), TACLOBAN CITY19IM0055 · ₱1,881,180.77 · mapped
- REHABILITATION/RECONSTRUCTION OF NATIONAL ROAD WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG MAINIT - SAN MIGUEL - SANTOL ROAD, S00061LT, KO936+(-498) - KO936+(-289), ALANGALANG, LEYTE15IC0083 · ₱1,486,455.65 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (SK HALL), BRGY. 54, TACLOBAN CITY19IM0053 · ₱1,413,388.40 · mapped
- ROAD REHABILITATION, BARANGAY 77, P.C. VILLAGE TO TAGUIKTIK, TACLOBAN CITY16IM0016 · ₱1,054,275.13
- CONSTRUCTION OF SUSPENDED CONCRETE BRIDGE IN GREGORIO C. CATENZA NATIONAL HIGH SCHOOL,BRGY. SAN PEDRO,TUNGA,LEYTE19ID0088 · ₱984,984.32 · mapped
- CONSTRUCTION OF RAINWATER COLLECTION SYSTEM STO. NIÑO ELEM. SCHOOL, BRGY. 106, STO. NIÑO, CABALAWAN ELEMENTARY SCHOOL, BRGY. 99, DIIT, SCANDINAVIAN ELEMENTARY SCHOOL, BRGY. 100, SAN ROQUE, TACLOBAN CITY17IM0030 · ₱741,021.52 · mapped
- CONSTRUCTION OF RAINWATER COLLECTION SYSTEM, JARMS, TACLOBAN CITY, BRGY. 91, ABUCAY, UTAP ELEM. SCHOOL, BRGY. UTAP, SAGKAHAN ELEM. SCHOOL, BRGY. 62, SAGKAHAN, RTR ELEM SCHOOL, BRGY. 95, PATERNO EXTENSION, TACLOBAN CITY17IM0028 · ₱741,021.52 · mapped
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
