POWER K CONST SUPPLY & SERVICES is listed as a company organization in Philippine public procurement records on this site, with 11 linked DPWH project(s) totaling about ₱810,214,526.69. Recorded delivery grade C (from public DPWH project records — not a finding of wrongdoing).
POWER K CONST SUPPLY & SERVICES
CGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 11
- Total value
- ₱810,214,526.69
- Published flags
- 1
- Region
- Laguna 2nd DEO · Region IV-A
Online presence
Google Maps: Power K Construction Supply and ServicesGoogle Maps, 2026-10-22
Dinagat Islands, Pila, 4010 Laguna
Licensed officers (PCAB)
- Kennedy Tan Haw · Authorized Managing Officer (PCAB license 31574) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for POWER K CONST SUPPLY & SERVICES — not an accusation or finding of wrongdoing.
Score: 74.90 / 100 · Projects in sample: 11 · As of Oct 28, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 57.1/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 57.1
- lateCompletedProjects
- 0
- onTimeCompletedProjects
- 8
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 11
- pastTargetOngoingProjects
- 3
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 21%
- totalProjects
- 11
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 11
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 97.3/100 · Weight: 11%
- projects
- 11
- componentScore
- 97.3
- flagsPerProject
- 0.09
- publishedV2Flags
- 1
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 11
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
11 geotagged projects — Open full map · Download projects (CSV)
- REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS - CALAMBA-STA CRUZ-FAMY JCT RD - K0068 + (-282) - K0069 + 09824DI0158 · ₱120,487,730.00 · mapped
- Construction of Revetment along Malaking Ilog River (Tipaz Section), San Juan, Batangas23DD0227 · ₱96,500,000.00 · mapped
- Construction of Revetment along Malaking Ilog River (Lipahan Section), San Juan, Batangas23DD0188 · ₱96,500,000.00 · mapped
- Construction of Flood Control Structure along Inawasan River, Famy, Laguna24DH0029 · ₱96,499,996.40 · mapped
- Construction of Flood Control Structure along Romelo River, Siniloan, Laguna24DH0040 · ₱96,499,568.47 · mapped
- CONSTRUCTION OF STRUCTURE FOR RIVER PROTECTION AT SAN CRISTOBAL RIVER, BRGY. PACIANO, CALAMBA CITY, LAGUNA25DI0065 · ₱94,666,878.58 · mapped
- ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS - CALAMBA - STA. CRUZ - FAMY JCT RD - K0066 + 000 - K0066 + 370, K0066 + 635 - K0067 + 000, K0067 + 000 - K0067 + 26021DI0042 · ₱72,368,017.48 · mapped
- REHABILITATION OF MAGSAYSAY ROAD AT BARANGAY SAN ANTONIO, SAN PEDRO CITY, LAGUNA22DI0022 · ₱48,163,500.00 · mapped
- BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF MULTI - PURPOSE FACILITY (MUNICIPAL HALL VICINITY AREA), BRGY. RIZAL, TAGUDIN, ILOCOS SUR24A00517 · ₱39,529,897.77 · mapped
- Rehabilitation of Flood Control along Libtong Creek, Brgy. Libtong, Tagudin, Ilocus Sur23A00395 · ₱29,698,974.86 · mapped
- Construction of Flood Mitigation Facilities along Amburayan River Basin, (Phase 1), Barangay Pacac-Baritao-Lantag-Pudoc East, Tagudin, Ilocos Sur22A00195 · ₱19,299,963.13 · mapped
Equipment & capacity
PCAB license
- License no.
- 31574
- Category
- A · Medium B
- Minimum net worth for this category
- ₱30,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱300M
- License valid until
- Oct 28, 2027
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 31574); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
20 evaluations listed across 7 GPPB CPES releases; average final rating 90.8% over 8 rated projects; 20 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Mar 17, 2026 | NIA | ₱14,066,800.00 | Completed | 87.5% | 87.5% | 41st, p. 16 |
| Mar 17, 2026 | NIA | ₱14,062,940.00 | On-going | 86.2% | — | 41st, p. 16 |
| Mar 17, 2026 | NIA | ₱14,063,665.00 | Completed | 88.4% | 88.4% | 41st, p. 16 |
| Mar 16, 2026 | NIA | ₱14,060,341.00 | Completed | 87.6% | 87.6% | 41st, p. 16 |
| Jun 27, 2025 | DPWH | ₱67,549,993.00 | Completed | 92.3% | 94.0% | 40th, p. 239 |
| Jun 27, 2025 | DPWH | ₱96,499,568.00 | Completed | 93.4% | 94.0% | 40th, p. 239 |
| Apr 30, 2025 | DPWH | ₱48,019,801.00 | On-going | 91.8% | — | 40th, p. 239 |
| Feb 18, 2025 | DPWH | ₱96,499,996.00 | Completed | 92.4% | 95.6% | 39th (rev), p. 165 |
| Feb 2, 2025 | NIA | ₱9,249,268.00 | On-going | 82.3% | — | 39th (rev), p. 165 |
| Oct 16, 2024 | DPWH | ₱49,406,733.00 | On-going | 93.8% | — | 39th (rev), p. 165 |
| Oct 14, 2024 | DPWH | ₱65,509,917.00 | On-going | 95.1% | — | 39th (rev), p. 165 |
| Aug 14, 2024 | DPWH | ₱96,499,996.00 | On-going | 97.8% | — | 38th, p. 188 |
Showing the 12 most recent of 20.
1 amount flagged: the printed value is implausible for a ₱-thousands column or disagrees with the DPWH award, so we show it as printed instead of converting it.
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →