E L TORRES CONST AND TRADING INC FORMERLY : E L TORRES CONST & TRADING is listed as a company organization in Philippine public procurement records on this site, with 17 linked DPWH project(s) totaling about ₱589,545,719.19. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
E L TORRES CONST AND TRADING INC FORMERLY : E L TORRES CONST & TRADING
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 17
- Total value
- ₱589,545,719.19
- Published flags
- 5
- Region
- QUEZON CITY · National Capital Region
Public Record Grade
A transparent, data-derived summary of reported public records for E L TORRES CONST AND TRADING INC FORMERLY : E L TORRES CONST & TRADING — not an accusation or finding of wrongdoing.
Score: 87.50 / 100 · Projects in sample: 17 · As of Oct 28, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 97.1/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 97.1
- lateCompletedProjects
- 1
- onTimeCompletedProjects
- 16
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 17
- pastTargetOngoingProjects
- 0
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 21%
- totalProjects
- 17
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 17
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 92.9/100 · Weight: 11%
- projects
- 17
- componentScore
- 92.9
- flagsPerProject
- 0.24
- publishedV2Flags
- 4
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 17
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
17 geotagged projects — Open full map · Download projects (CSV)
- REHABILITATION OF ROADS, BARANGAY LOYOLA HEIGHTS, PHASE II, QUEZON CITY24OG0063 · ₱97,926,489.21 · mapped
- ROAD WIDENING INCLUDING DRAINAGE WITH ROAD REHABILITATION/CONCRETING @ VISAYAS AVE., ( K0014+399 - K0013+625; K0012+(-079) - K0013+111), Q.C.17OF0001 · ₱61,327,016.60 · mapped
- Construction of Flood Mitigation Structure, Barangay Dampalit, Malabon City (Phase 5)23OA0015 · ₱49,000,000.00 · mapped
- Rehabilitation of Marikina River Tributary Creek (Phase 2), Acropolis, Quezon City24OG0021 · ₱48,998,985.53 · mapped
- Rehabilitation of Flood Control Structure (Phase 2), Barangay Gulod, Quezon City23OF0030 · ₱48,019,705.02 · mapped
- Rehabilitation of Tullahan River and tributaries, Gulod, Novaliches, Quezon City21OF0155 · ₱47,530,000.00 · mapped
- Rehabilitation of Tullahan River and tributaries, Fairview, Novaliches, Quezon City21OF0156 · ₱47,530,000.00 · mapped
- Construction of Riverwall and Road Dike along Batasan River (Phase 7), Brgy. Dampalit, Malabon City21OA0002 · ₱34,790,000.00 · mapped
- Rehabilitation of Flood Control Structure (Phase 2), Barangay Sta. Lucia, Quezon City23OF0026 · ₱29,399,256.06 · mapped
- Construction of Flood Control Structures at Lumban Creek (Phase II), Barangay Matandang Balara, Quezon City22OG0102 · ₱28,341,399.95 · mapped
- Rehabilitation of Lagarian Creek, Quezon City23OG0076 · ₱19,557,713.20 · mapped
- Rehabilitation of Flood Control Structure, Barangay West Fairview, Quezon City22OF0056 · ₱19,012,000.00 · mapped
- Rehabilitation of Duyan-duyan Creek, Quezon City23OG0086 · ₱14,653,311.80 · mapped
- ASSET PRESERVATION - PREVENTIVE MAINTENANCE - PRIMARY ROADS EDSA/QUEZON AVE. FLYOVER - (S05595LZ) CHAINAGE 0 - CHAINAGE 60524O00107 · ₱14,593,508.44 · mapped
- Rehabilitation of Flood Control Structure, Barangay Sta. Monica, Quezon City22OF0058 · ₱14,259,000.00 · mapped
- Rehabilitation of Marikina River Tributary Creek, Acropolis, Quezon City23OG0072 · ₱9,755,779.90 · mapped
- Rehabilitation of Buaya Creek, Quezon City23OG0077 · ₱4,851,553.48 · mapped
Equipment & capacity
PCAB license
- License no.
- 31406
- Category
- B · Medium A
- Minimum net worth for this category
- ₱10,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱150M
- License valid until
- Jun 8, 2027
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 31406); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
10 evaluations listed across 4 GPPB CPES releases; average final rating 92.0% over 5 rated projects; 10 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| May 2, 2025 | DPWH | ₱87,808,166.00 | On-going | 92.8% | — | 40th, p. 88 |
| Mar 7, 2025 | DPWH | ₱48,998,986.00 | Completed | 93.6% | 94.1% | 39th (rev), p. 56 |
| Mar 3, 2025 | DPWH | ₱59,400,000.00 | Completed | 98.2% | 90.6% | 39th (rev), p. 56 |
| Oct 14, 2024 | DPWH | ₱86,058,166.00 | On-going | 85.9% | — | 39th (rev), p. 56 |
| Jul 27, 2024 | DPWH | ₱48,020,100.00 | On-going | 94.4% | — | 38th, p. 67 |
| Jun 16, 2024 | DPWH | ₱59,400,000.00 | On-going | 85.6% | — | 38th, p. 67 |
| May 16, 2024 | DPWH | ₱59,400,000.00 | On-going | 91.7% | — | 38th, p. 67 |
| Dec 1, 2023 | DPWH | ₱12,933,070.00 | Completed | 94.3% | 94.3% | 37th, p. 31 |
| Mar 12, 2020 | DPWH | ₱46,809,074.00 | Completed | 91.7% | 91.4% | 37th, p. 31 |
| Nov 4, 2019 | DPWH | ₱3,758,503.00 | Completed | 90.7% | 89.8% | 37th, p. 31 |
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →